Slopes model definition

Slopes model means the department’s computer-generated model to identify designated debris flow traversal areas, designated sediment source areas, and trigger sources.

Examples of Slopes model in a sentence

  • The raster data set used in the GEN methodology was from the Parameter Regression on Independent Slopes model (PRISM, PRISM Climate Group, 2012; Di Luzio, et al., 2008) and included 30-year monthly precipitation and air temperature estimates provided in a raster format at a resolution of ½ arc minute of degree for the climate record of 1971 to 2000.

  • Each georeferenced grid cell is assigned an average monthly temperature and precipitation value for the period of interest using the Parameter Regression on Independent Slopes model (PRISM, 2015).

Related to Slopes model

  • Park model means a recreational vehicle intended for permanent or semi-permanent installation and is used as a primary residence;

  • Model shall refer to a particular brand of Vehicle sold by an OEM (e.g., Taurus, Tahoe, Grand Caravan).

  • Base Case Model means the financial model and statements including profit and loss, balance sheet and financial projections reflecting the forecasted consolidated financial conditions of the Group for the term of this Agreement (for these purposes assuming both before and after the incurrence of the indebtedness under the Finance Documents), each in form and substance satisfactory to the Finance Parties addressed to, and/or capable of being relied upon by the Finance Parties.

  • Reliability pricing model or "RPM" means PJM's capacity-

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Sponsor Model means the Sponsor’s financial model, dated June 26, 2018, used in connection with the syndication of the Credit Facility.

  • Reliability Pricing Model Auction or “RPM Auction” shall mean the Base Residual Auction or any Incremental Auction, or, for the 2016/2017 and 2017/2018 Delivery Years, any Capacity Performance Transition Incremental Auction.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • service delivery and budget implementation plan means a detailed plan approved by the executive mayor of a municipality in terms of section 53(l)(c)(ii) of the MFMA for implementing the municipality's delivery of municipal services and its annual budget, and which must indicate

  • Design Criteria means the design criteria set out in the Ministry’s publication “Design Criteria for Sanitary Sewers, Storm Sewers and Forcemains for Alterations Authorized under Environmental Compliance Approval”, (as amended from time to time).

  • Work package means a major sub-division of the proposed project.

  • Financial Model means the financial model adopted by Senior Lenders, setting forth the capital and operating costs of the Project and revenues therefrom on the basis of which financial viability of the Project has been determined by the Senior Lenders, and includes a description of the assumptions and parameters used for making calculations and projections therein;

  • Parameter means a physical, biological, or chemical property of state water when a value of that

  • Timeline means the list of critical dates and actions included in the Introductory Materials.

  • Work Schedule means the approved order and timeline for how the requirements of this contract, including Work on individual Units or groups of Units, will be fulfilled by the Contractor.

  • Configuration means State-specific changes made to the Software without Source Code or structural data model changes occurring.

  • Contract Schedule means a schedule to this Contract;

  • Development Schedule shall have the meaning set forth in Section 1.1.

  • BOM means Board of Management.

  • Footprint means the track width multiplied by the wheelbase as stated in the certificate of conformity and defined in sections 2.1 and 2.3 of Annex I to Directive 2007/46/EC;

  • Design-bid-build means a project delivery method in which:

  • Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.

  • Module means specific portion of the Application Software designated as such in the Documentation made available to the Customer under the Notification Form.

  • engine type means a category of engines which do not differ in essential engine characteristics.

  • Baseline Schedule means the initial time schedule prepared by Contractor for Owner’s information and acceptance that conveys Contractor’s and Subcontractors’ activities (including coordination and review activities required in the Contract Documents to be performed by A/E and ODR), durations, and sequence of work related to the entire Project to the extent required by the Contract Documents. The schedule clearly demonstrates the critical path of activities, durations and necessary predecessor conditions that drive the end date of the schedule. The Baseline Schedule shall not exceed the time limit current under the Contract Documents.