Examples of Standard Schedule of Rates in a sentence
Indian Railway Standard General Conditions of Contract read along with correction slips, IRU Standard Schedule of Rates, (South Central Railway) 2010 and notes appearing under the relevant chapters and sub-chapters should be considered as part of the tender papers.
Note: It may be noted that the term Estimate Rate used above means the rate in the sanctioned estimate with which the tenders are accepted, or if no such rates is available in the estimate, the rate derived will be with reference to the Standard Schedule of Rates adopted in the sanctioned estimate with which tenders are accepted.
If there arises any discrepancy between the printed Unified Standard Schedule of Rates 2010 as amended by addendum and corrigendum slips issued from time to time upto date and the schedule attached to the Tender pertaining to this work, the former shall be treated as authentative and binding in all purposes.7. Rubble masonry shall be first sum of Railways Specification No 503 according to South Central Railway Specification for materials and works.
Zone details and rates under this contract are as under: ZoneSectionRate as per DyCE/XEN…………..of ICF……………..Rates of Southern Railway Unified Standard Schedule of Rates 2011 as corrected upto correction slip No…….
Zone details and rates under this contract are as under: Zone Section Rate as perDyCE/XEN…………..of ICF……………..Rates of Southern Railway Unified Standard Schedule of Rates 2011 as corrected upto correction slip No…….
Chief Engineer ………………..(for the President of India) …………Rates of Southern Railway Unified Standard Schedule of Rates 2011 as corrected upto correction slip No…….
The quotations will be subject to the general instructions printed in Southern Railway Unified Standard Schedule of Rates 2011, as corrected by and upto Correction Slip upto the date of tender opening.
I.R.S.General conditions of the contract read along with correction slips, IRU Standard Schedule of Rates, (South Central Railway) 2010 and notes appearing under the relevant chapters and sub-chapters should be considered as part of the tender papers.
Materials and workmanship required to be incorporated in these works and services shall be as given under specification and workmanship in the various trade section of the MES Standard Schedule of Rates mentioned here-in-before duly modified by the Particular Specifications and notes on the drawings.
The costs of transportation are subsumed in the Standard Schedule of Rates and therefore no separate charges shall be payable on this account.