Stormwater Control Plan definition

Stormwater Control Plan means a plan that meets those criteria contained in the most recent version of the BASMAA Post Construction Manual.
Stormwater Control Plan means a plan that meets those criteria contained in the most recent version of the Contra Costa Clean Water Program Stormwater C.3. Guidebook.
Stormwater Control Plan or “SCP” shall mean the stormwater control plan for an Impaired Water Body Segment.

Examples of Stormwater Control Plan in a sentence

  • If the project is 5,000 square feet or more of new or replaced “net impervious” area (not Single Family Dwelling), or if the project is Single Family Dwelling with 15,000 square feet or more of new or replaced “net impervious” area, submit a Stormwater Control Plan with this application that identifies 1) Low Impact Development measures incorporated into the project design and 2) stormwater quality treatment measures.

  • Project Sponsor to prepare and implement a Stormwater Control Plan.

  • Water Quality: Submit a Stormwater Control Plan with this application that identifies measures to reduce and remove pollutants from storm water runoff.

  • This will be achieved by using LID stormwater BMPs which may include, but not limited to: • green roofs, • cisterns, Project Sponsor Preparation of Stormwater Control Plan pior to first permit for construction, as determined by the Planning Department.

  • To manage peak flow and discharge volume, CPMC shall prepare and implement a Stormwater Control Plan for each of the near-term projects under the LRDP, focusing on LID strategies and BMPs. In implementing the LRDP, CPMC shall comply with all policies and regulations adopted by the City, including SFPUC’s Stormwater Design Guidelines, which require a 25% decrease in the rate and volume of stormwater runoff from the 2-year, 24-hour design storm.

  • The Stormwater Control Plan will follow the Tier 2 approach described in the Stormwater Technical Guide, with storm water treatment, source control, and LID4 measures.

  • If the project is 15,000 square feet or more of new or replaced impervious area, submit a Stormwater Control Plan with this application that identifies the above requirements and also identifies retention of stormwater runoff from a regulated storm event.

  • If the project is 2,500 square feet or more of new or replaced impervious area, submit a Stormwater Control Plan for Small (Tier 1) Projects1 with this application that identifies Low Impact Development measures incorporated into the project design, such as: 3 See ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ under “Development” for map of the NPDES Permit Area, Stormwater Technical Guide, Stormwater Control Plan template, Stormwater Control Plan for Small (Tier 1) Projects, and a definition of Low Impact Development.

  • Estimated Existing Annual Water Use Calculation (▇▇▇▇▇▇▇ Engineers, December 2023) o Hydrogeologic Report (forthcoming) o Initial Water Use/Nitrate Impact Questionnaire for Development in Monterey County (▇▇▇▇ ▇▇▇▇▇▇, October 2023) o Preliminary Stormwater Control Plan for Corral de Tierra Fueling Station (▇▇▇▇▇▇▇ Engineers, September 2023) CONTRACTOR assumes that the County has reviewed and accepted all technical reports and letters for consistency with County standards.

  • The portion of the project outside the State highway system, and within the County of San ▇▇▇▇ Obispo’s right-of-way, will comply with: • The latest San ▇▇▇▇ Obispo County Stormwater Control Plan (SWCP) template; • State Water Resources Control Board Water Quality Order No. 2013-0001-DWQ NPDES General Permit No. CAS000004; and • Resolution No. R3-2013-0032 Approving Post-Construction Stormwater Management Requirements for Development Projects in the Central Coast Region.


More Definitions of Stormwater Control Plan

Stormwater Control Plan means a plan that meets those criteria contained in the most recent version of the Guidance Manual.