TEACO retention definition

TEACO retention means the amount of losses below
TEACO retention means the amount of losses below which a TEACO insurer is not entitled to reimbursement from the fund under the TEACO option selected. A TEACO insurer’s retention options shall be calculated as follows:

Examples of TEACO retention in a sentence

  • If your company elects to purchase TEACO coverage, select a TEACO retention level option by initialing the applicable box below.

  • The TEACO retention multiples outlined above shall be adjusted to reflect the coverage level selected by the Company under its Reimbursement Contract.

  • The TEACO retention is the amount of losses below which a TEACO Company is not entitled to reimbursement from the FHCF under the TEACO coverage option.

  • The Company’s TEACO retention shall replace the Company’s mandatory FHCF retention when it selects a TEACO option.

  • The Company’s maximum reimbursement under its TEACO option shall be its mandatory FHCF premium share of two times the difference between the industry retention calculated under Section 215.555(2)(e), Florida Statutes, and the $3 billion, $4 billion, or $5 billion industry TEACO retention based on the Company’s selection of the TEACO option.

  • The TEACO retention multiple for each TEACO coverage option shall be calculated by dividing $3 billion, $4 billion, or $5 billion by the total estimated mandatory FHCF reimbursement premium assuming all insurers selected the 90% coverage option.

  • The SBA shall reimburse the Company for 45 percent, 75 percent, or 90 percent of its losses from each Covered Event in excess of the Company’s TEACO retention, plus 5 percent of the reimbursed losses to cover loss adjustment expense, limited in total to the amount of TEACO coverage purchased by the Company.

  • The TEACO retention multiple shall be used for determining an insurer’s retention if the insurer has selected a TEACO option.

  • The liability of the FHCF with respect to all TEACO addenda shall not exceed an amount equal to two times the difference between the industry retention level calculated under Section 215.555(2)(e), Florida Statutes, and the $3 billion, $4 billion, or $5 billion industry TEACO retention level options actually selected, but in no event may the FHCF’s obligation exceed the actual claims-paying capacity of the FHCF plus the additional TEACO capacity provided for under Section 215.555(16)(g), Florida Statutes.

  • The industry TEACO premium associated with the $3 billion retention option would be equal to 85% of the difference for the coverage between the industry retention level calculated under Section 215.555(2)(e), Florida Statutes, and the $3 billion industry TEACO retention level.

Related to TEACO retention

  • income-related employment and support allowance means an income-related allowance under Part 1 of the Welfare Reform Act 2007;

  • SABS : means the South African Bureau of Standards.

  • Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.

  • Wireless infrastructure provider means any person, including a person authorized to provide telecommunications service in the state, that builds or installs transmission equipment, wireless facilities, or wireless support structures, but that is not a wireless services provider.

  • Stormwater management system means any equipment, plants,

  • Executive Management means the CEO and the CFO for purposes of administering this Plan.

  • Emergency medical services personnel means that term as defined in section 20904 of the public health code, 1978 PA 368, MCL 333.20904.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.