Transportation Project Development definition

Transportation Project Development means implementing the transportation system plan (TSP) by determining the precise location, alignment, and preliminary design of improvements included in the TSP based on site-specific engineering and environmental studies.
Transportation Project Development means implementing the transportation system plan (TSP) by

Examples of Transportation Project Development in a sentence

  • Consultant Services Engineer Nebraska Department of Transportation Project Development Division1500 Highway 2, PO Box 94759 Lincoln NEPO Box ZIP Code: 68509-4759 Shipping ZIP Code: 68502 Submittals are to include the following in the order given below:1.

  • Appendix B Non-Traditional Transportation Project Development Timeline WisDOT Project ID NumberDate Checklist CompletedProject TitleHwy No/LetterCountyProject LimitsSponsorProject DescriptionPreparer/Title Enter Date Completed / / Project initialization: Average 3 months from time State/Municipal Agreement is sent to Sponsor and the design ID is authorized.

  • Supplementary NotesProject performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration.Project Title: Collection, Integration and Analysis of Utility Data in the Transportation Project Development ProcessURL: http://tti.tamu.edu/documents/0-5475-2.pdf16.

  • Supplementary NotesProject performed in cooperation with the Texas Department of Transportation and the Federal Highway Administration.Project Title: Collection, Integration, and Analysis of Utility Data in the Transportation Project Development ProcessURL: http//:tti.tamu.edu/documents/0-5475-3.pdf16.

  • Florida Department of Transportation Project Development and Environment Manual, Parts 1 and 2 http://www.dot.state.fl.us/emo/pubs/pdeman/pdeman1.

  • This document was prepared according to the requirements of the NationalEnvironmental Policy Act (NEPA), the State Environmental Quality Review Act (SEQRA), City Environmental Review Ordinance (CERO) and the New York State Department of Transportation Project Development Manual.

  • These criteria are listed in the Massachusetts Department of Transportation Project Development and Design Guide and in MassDOT Engineering Directive E-14-006, as may be amended from time to time.

  • E-1 Transportation Project Development Prepare traffic studies, cost estimates, impact studies, project study reports, project updates, feasibility studies, bicycle facility planning, pedestrian pathway planning, Transportation Demand Management (TDM) strategies, and environmental documents and/or reports.

  • See US Department of Transportation, Collaborative Problem Solving: Better and Streamlined Outcomes for All, Guidance on Managing Conflict and Resolving Disputes between State and Federal Agencies During the Transportation Project Development and Environmental Review Process (2002).The Scoping Stage‌ As illustrated in the bottom row of the flow chart, much agency coordination takes place in the scoping stage of a project.

  • Electronic document, http://www.oregon.gov/OPRD/HCD/ARCH/docs/Oregon_Archaeological_Curation_Re ports.pdf, accessed May 24, 2012.Pennsylvania Department of Transportation (PennDOT)2010 The Transportation Project Development Process: Cultural Resources Handbook.

Related to Transportation Project Development

  • Transportation project means any project that the department is authorized by law to undertake including but not limited to a highway, tollway, bridge, mass transit, intelligent transportation system, traffic management, traveler information services, or any other project for transportation purposes.

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Infill development means new construction on a vacant commercial lot currently held as open space.

  • Projects means the projects identified in Exhibit A to the Agreement and all other projects, any costs of which are included in a Transitional Capital Plan pursuant to the Act or are Recovery Costs, and financed, by payment or reimbursement, with the proceeds of Bonds or Notes.

  • Development means any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Low Impact Development or “LID” means a site design strategy that maintains, mimics or replicates pre- development hydrology through the use of numerous site design principles and small-scale treatment practices distributed throughout a site to manage runoff volume and water quality at the source.

  • Project Management Plan means the portion of the Project Development Plan providing the information requested in Section 4.2 of Exhibit B to the ITP.

  • Research and development facility means an establishment engaged in laboratory, scientific, or experimental testing and development related to new products, new uses for existing products, or improving existing products. The term does not include an establishment engaged in efficiency surveys, management studies, consumer surveys, economic surveys, advertising, promotion, banking, or research in connection with literary, historical, or similar projects.

  • Redevelopment means areas where development is replacing older development.