Examples of Wash plant in a sentence
The samples shall initially be taken every 2 hours that the Wash Plant is operational.
The standard of care for the procurement and construction of the Wash Plant shall be the level of care and skill ordinarily used by contractors performing under similar conditions at a similar time and locality.
Contractor shall ensure that the design, procurement, and construction of the Wash Plant shall be carried out in accordance with this Agreement, including the plans and specifications set forth in Exhibit G attached hereto (the “Plant Specifications”), and in compliance with the SSS Permits and applicable laws.
Within fifteen (15) days following the Effective Date, Contractor shall use commercially reasonable efforts to deliver to SSS the name and address of any third party then having or expected to have an interest in any material part of the Wash Plant, SSS Equipment, or Contractor Equipment (other than the Non-Permanent Contractor Equipment) during the Term.
The TPS Subcontract shall provide that the standard of care for all design services performed in relation to the Wash Plant shall be the level of care and skill ordinarily used by design professionals performing under similar conditions at a similar time and locality of the Plant Site.
Contractor acknowledges that a delay in achieving the Wash Plant Completion Date by the Required Wash Plant Completion Date or other delays may result in Contractor being unable to establish sufficient Product Sand in the Stock Pile Area in the initial Production Season as may be required by SSS.
Contractor shall perform moisture testing for the initial twenty (20) days of production following the Wash Plant Completion Date.
Washed Product Sand samples shall be taken from both (i) a location between the belt scale and the drop point off the end of the Wash Plant Product Sand conveyor (“Belt”) and (ii) the Stock Pile Area.
The layout of the Wash Plant on the Quarry Site is preliminary anticipated to be as indicated below.
Contractor shall enter into a subcontract (the “TPS Subcontract”) with Turn-Key Processing Solutions LLC (“TPS”) pursuant to which Contractor shall retain TPS to perform all design services required for Contractor to construct the Wash Plant in accordance with this Agreement.