Examples of Zero point in a sentence
In case of non-metered water supply by UGVCL, the recovery of water charges will be made by UGVCL at 0.5% (Zero point five percent) of total cost of actual work done as per work order.
Zero point data for extractive instruments should be obtained by removing the extractive probe from the stack and drawing in clean ambient air.
Zero point data for in-situ instruments should be obtained by removing the instrument from the stack and monitoring ambient air on a test bench.
A penalty of 0.5% (Zero point five percent) per week of the contract value will be levied for delay in response time for attending and rectification of faults beyond specified time during the warranty period as detailed above.
In case of any delay/default, of the Contractor/ Bidder to adhere to the agreed time schedule, PIIC shall recover the liquidated damages from the Contractor/ Bidder at the rate of 0.5% (Zero point Five percent) of the total amount of fee per week of delay of any activity subject to a maximum of 5% (Five percent) of the total order value.
When observing a wrestling action, the referee and judge award the points, cautions, indicated below which, in each of the cases put forward, provides the following result: R: Red wrestler – B: Blue wrestler – 0: Zero point In the event of any flagrant violation of the Rules, the mat chairman must call for a consultation.
In the event that remedial measures are not completed by the Concessionaire in conformity with the provisions of this Agreement, the PMU/ Authority shall be entitled to recover Damages from the Concessionaire at the rate of 0.1% ( Zero point One percentage) of Performance Security for each day of delay beyond the period specified for rectification of such defect or deficiency by the PMU/ Authority.
A maximum period of 2 (two) weeks will be allowed for attending and rectification of faults during the warranty period.(b) Maximum down time during the warranty period will be 2% (two percent) for on line M&P and 10% (ten percent) for off line M&P calculated on quarterly basis.(c) A penalty of 0.5% (Zero point five percent) per week of the contract value will be levied for delay in response time for attending and rectification of faults beyond specified time during the warranty period as detailed above.
Marks (40% of project length) or more in last 7 years.1 project - 4 marksAdd 0.5 (Zero point five) marks extra for each additional project subject to maximum 2 marks.
Office space (20 points) Office building must have the following:a) air-conditioners = 5 points;b) electrical plugs per office = 5 points ;c) ablution facilities as per space norm = 5 points;d) fire escape routes/emergency exits = 5 points.NB Zero point will be allocated for criteria/subcriteria not met or substantiated.