RENOVATION WORK Klausul Contoh

RENOVATION WORK. BANK SIMPANAN NASIONAL GC/3 BILL NO. B : DEMOLITION WORKS
RENOVATION WORK. BANK SIMPANAN NASIONAL GC/4 BILL NO. B - DEMOLITION WORKS BILL NO. B : DEMOLITION WORKS
RENOVATION WORK. GENERAL CONDITIONS (cont'd) A B C D E GENERAL CONDITIONS (cont'd) The Contractor will have no claim for alleged loss of profit caused by any omission of scope of works by the Client during the construction period. The tenderer shall note the extent of the demolition works required. The successful Tenderer shall liaise closely with the Project Coordinator with regards to the demolition works. The Contractor is responsible and shall ensure all the items listed below are in good conditions, operated and ready to be used during work progress: a) Alarm system b) Telephone and fax c) Data line for ATM/CDM and counter d) Fire extinguisher e) Toilet (Failure in maintaining good conditions and operation will result in issuance of stop work order immediately) The Contractor is to ensure that the physical condition of the site is safe and secure during work progress for BSN staff/customers/public. (Failure in complying the above condition will result in issuance of stop work order immediately) The Contractor shall before commencing work confirm with the S.O the location for storing of equipments / machineries / materials. The Contractor shall place all their equipments / machineries / materials in a locked storage box if it is located outside BSN premis. GENERAL CONDITIONS (cont'd) A B C D E F GENERAL CONDITIONS (cont'd) All prices are to include for shorting, temporary supports, protective screens and precautionary security measures necessitated by each item and all other costs and charges including making good surrounding works, etc. that may be inferred from each item. The tenderer shall note that the term 'Demolition' applied herein shall include the hacking up, breaking out, cutting off stanchion, grubbing up and removal of all footings, bases and foundations of the structures to be demolished. Before commencing demolition to the various of work the tenderer must ensure the stability of the remaining sections and safety of neighbouring properties by providing all necessary shores, supports, underpinning, etc. as the situation dictates. The prices of the works are to include for all these provisions. The term "S.O/Client" wherever used in the Contract Document shall mean Project Coordinator/Designer from Bank Simpanan Nasional. Certain areas of the site may be allocated for storing materials and the Contractor is to note that these areas will be strictly adhered to. Materials and goods when found to be stored in unauthorised areas must be immediately removed from...