Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.
Sidewalks doorways, vestibules, halls, stairways and other similar areas shall not be obstructed by Tenant or used by Tenant for any purpose other than ingress and egress to and from the Premises. No rubbish, litter, trash, or material shall be placed, emptied, or thrown in those areas. At no time shall Tenant permit Tenant’s employees to loiter in Common Areas or elsewhere about the Building or Property.
Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.
Porcupine Site Highway 11
Trunk Side A Central Office Switch connection that is capable of, and has been programmed to treat the circuit as, connecting to another switching entity, for example, to another carrier’s network. Trunk side connections offer those transmission and signaling features appropriate for the connection of switching entities and cannot be used for the direct connection of ordinary telephone station sets.
Restrooms The restrooms, toilets, urinals, vanities and the other apparatus shall not be used for any purpose other than that for which they were constructed, and no foreign substance of any kind whatsoever shall be thrown therein. The expense of any breakage, stoppage or damage resulting from the violation of this rule shall be borne by the Tenant whom, or whose employees or invitees, shall have caused it.
DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.
Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:
Exterior and interior functional areas and spaces of the Project, with technical and equipment requirements on each;
Interior (a) Ceilings, sidewalls and bulkhead panels shall be clean and free of cracks and stains;