60% Plans, Specifications, and Estimates Sample Clauses

60% Plans, Specifications, and Estimates. Furnish the Program Manager ten (10) copies (five [5] full size and five [5] one-half size) of the draft Final Plans and Specifications for review at 60% plan completion stage, along with an updated detailed procurement/construction cost estimate for said improvements, extensions and repairs. Incorporate all recommended changes prior to submittal of the 95% draft Final Plans and Specifications. The 60% and 95% submissions shall be deemed deficient and shall be returned to the Engineer if a detailed construction cost estimate is not included.
AutoNDA by SimpleDocs

Related to 60% Plans, Specifications, and Estimates

  • Class Specifications The Human Resources Division shall determine:

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • General specifications 6.1.1. A vehicle and its electrical/electronic system(s) or ESA(s) shall be so designed, constructed and fitted as to enable the vehicle, in normal conditions of use, to comply with the requirements of this Regulation.

  • EODUF Packing Specifications 7.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Corrections to Factual Inaccuracies In the event that the LEA determines that the Provider is maintaining Student Data that contains a factual inaccuracy, and Provider cooperation is required in order to make a correction, the LEA shall notify the Provider of the factual inaccuracy and the correction to be made. No later than 90 calendar days after receiving the notice of the factual inaccuracy, the Provider shall correct the factual inaccuracy and shall provide written confirmation of the correction to the LEA.

  • Implementation Specifications 1. The accounting shall contain the date, nature, and purpose of such disclosures, and the name and address of the person or agency to whom the disclosure is made.

  • Estimates and Reconciliation of Estimates Where estimated expenditures are used to determine the amount of the drawdown, the State will indicate in the terms of the State unique funding technique how the estimated amount is determined and when and how the State will reconcile the difference between the estimate and the State's actual expenditures.

  • Initial Forecasts/Trunking Requirements Because Verizon’s trunking requirements will, at least during an initial period, be dependent on the Customer segments and service segments within Customer segments to whom CSTC decides to market its services, Verizon will be largely dependent on CSTC to provide accurate trunk forecasts for both inbound (from Verizon) and outbound (to Verizon) traffic. Verizon will, as an initial matter, provide the same number of trunks to terminate Reciprocal Compensation Traffic to CSTC as CSTC provides to terminate Reciprocal Compensation Traffic to Verizon. At Verizon’s discretion, when CSTC expressly identifies particular situations that are expected to produce traffic that is substantially skewed in either the inbound or outbound direction, Verizon will provide the number of trunks CSTC suggests; provided, however, that in all cases Verizon’s provision of the forecasted number of trunks to CSTC is conditioned on the following: that such forecast is based on reasonable engineering criteria, there are no capacity constraints, and CSTC’s previous forecasts have proven to be reliable and accurate.

  • ODUF Packing Specifications 6.3.1 The data will be packed using ATIS EMI records. A pack will contain a minimum of one (1) message record or a maximum of ninety-nine thousand nine hundred and ninety-nine (99,999) message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of ninety-nine (99) packs and a minimum of one (1) pack.

  • Classification Specifications The Employer agrees to supply the President of the Union or his/her designate with the classification specifications for those classifications in the Bargaining Unit.

Time is Money Join Law Insider Premium to draft better contracts faster.