Accessibility Requirements for Construction Sample Clauses

Accessibility Requirements for Construction. RCD shall cause the Center to be constructed in compliance with all applicable federal, state, and local disabled persons accessibility requirements including, but not limited to the applicable provisions of: (i) the Xxxxx Act, (ii) the California Fair Employment and Housing Act, (iii) Section 504 of the Rehabilitation Act of 1973, (iv) the United States Fair Housing Act, as amended, (v) the Americans With Disabilities Act of 1990, and (vi) Chapters 11A and 11B of Title 24 of the California Code of Regulations, which relate to disabled persons access (collectively, the "Accessibility Requirements"). RCD shall indemnify, hold harmless and defend (with counsel reasonably acceptable to the County) the County against any claim for damages, compensation, fines, penalties or other amounts arising out of the failure or alleged failure of any person or entity (including RCD, its architect, contractor and subcontractors) to construct the Center in accordance with the Accessibility Requirements. The requirements in this Section survive the expiration of the Term.
AutoNDA by SimpleDocs

Related to Accessibility Requirements for Construction

  • Accessibility Requirements Under Tex. Gov’t Code Chapter 2054, Subchapter M, and implementing rules of the Texas Department of Information Resources, the System Agency must procure Products and services that comply with the Accessibility Standards when those Products are available in the commercial marketplace or when those Products are developed in response to a procurement solicitation. Accordingly, Grantee must provide electronic and information resources and associated Product documentation and technical support that comply with the Accessibility Standards.

  • SUPERVISION AND CONSTRUCTION PROCEDURES 4.3.1 The Contractor shall supervise and direct the Work, using his / her best skill and attention. The Contractor shall be solely responsible for all construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under the Contract. All aspects of the Project shall be subject to the inspection and approval of the State. Contractor guarantees to repair, replace, re-execute or otherwise correct any defect in workmanship, materials, or the like that fails to conform to the requirements of this Contract or that appears during the progress of the Work or within one year of final acceptance by the State.

  • Inspection of construction records The Authority shall have the right to inspect the records of the Contractor relating to the Works.

  • RESPONSIBILITY FOR CONSTRUCTION COST 5.2.1 Evaluations of the Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost prepared by the Design Professional represent the Design Professional's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Design Professional nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding or market conditions. Accordingly, the Design Professional cannot and does not warrant or represent that bids or cost proposals will not vary from the Owner's Project budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the Design Professional.

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • Suspension of unsafe Construction Works (i) Upon recommendation of the Authority’s Engineer to this effect, the Authority may by notice require the Contractor to suspend forthwith the whole or any part of the Works if, in the reasonable opinion of the Authority’s Engineer, such work threatens the safety of the Users and pedestrians.

  • Construction Requirements a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.

  • Owner’s Construction Inspector Owner may from time to time in writing designate a person or firm as Owner's Construction Inspector under this Contract. The Owner’s Construction Inspector may be hired by Owner or hired under the Program Manager’s Contract or the Design Professional’s Contract and shall provide inspection services of the Work on behalf of the Owner. The presence of an Owner’s Construction Inspector does not relieve the Contractor of any of its responsibilities for quality control and independent testing set forth in the General Requirements. The Owner’s Construction Inspector has the authority to report any deviations from the Contract Documents directly to the Contractor’s superintendent at the job site for immediate action, and also to report same to the Program Manager or Design Professional, and Owner.

  • Contract Construction 6.27.1 The parties acknowledge that each party and its counsel have reviewed this CONTRACT and that the normal rule of construction to the effect that any ambiguities are to be resolved against the drafting party shall not be employed in the interpretation of this CONTRACT or any amendment or exhibits hereto.

  • Quality Requirements Performance Indicator Heading Indicator (specific) Threshold Method of Measurement Frequency of monitoring Consequence of Breach QUALITY Patient Safety - Incidents I1 Number of incidents Adverse incidents include the following: clinical or non clinical adverse events that have potential to cause avoidable harm to a patient, including medical errors or adverse events related to medical devices or other equipment. Clinical or non- clinical accidents, accidental injuries to staff and members of the public, verbal, physical or psychological abuse or harassment, unusual or dangerous occurrences, damage to trust property, plant or equipment, fire or flood, security, theft or loss, near misses are identified as any event where under different circumstances significant injury or loss may have occurred Number of recorded incidents in the contract month Monthly Remedial Action Plan brought to Performance Meeting following breach; action under Module C Clause 32 if needed I2 Number of Sis Definition of SUI according to trust policy and national guidance Number of Serious Untoward Incidents reported in contract month Monthly Remedial Action Plan brought to Performance Meeting following breach; action under Module C Clause 32 if needed S1 Percentage of eligible staff received child safeguarding training at level 2 (as identified in LSCB training strategy) 95% Number received training/ Number of identified staff requiring training Monthly S2 Percentage of eligible staff received adult safeguarding awareness training at level 2 ( as identified in K&M Safeguarding Vulnerable Adults training strategy) 95% Number of staff trained/ Number of identified staff requiring training Monthly