Adaptable Power supply reference Sample Clauses

Adaptable Power supply reference. The APS supply on the host will regulate the APS voltage such that the voltage on the network labeled "Vfeedback" in Fig 10 becomes nominally 0.8 volts unless an APS voltage or current limiting condition takes priority. The resistors in the following table are calculated using resistors available as 1% values. For tolerance purposes, it is recommended that 0.1% resistors are used to provide additional tolerance margin although 1% may be suitable for some applications. These values are subject to change after a host back-plane is built and tested. Table 4 Resistor Values for APS operation.‌ Vnom volts R1 ohms 0.9 6810 1 3160 1.1 1820 1.2 1180 1.3 806 1.4 536 1.5 348 1.6 210 1.7 97.6
AutoNDA by SimpleDocs
Adaptable Power supply reference. The APS supply on the host will regulate the APS voltage such that the voltage on the network labeled “Vfeedback” becomes nominally 0.8 volts unless an APS voltage or current limiting conditions takes priority. The resistors in the following table are calculated using resistors available as 1% values. For tolerance purposes, it is recommended that 0.1% resistors are used to provide additional tolerance margin although 1% may be suitable for some applications. These values are subject to change after a host back-plane is built and tested. Optical Transceivers Design Reference Guide The Back-plane will provide an adaptable power supply capable of adjusting from a high of 1.8 volts to a low 0.9 volts. Vnom volts R1 Ohms 0.9 6810 1 3160 1.1 1820 1.2 1180 1.3 806 1.4 536 1.5 348 1.6 210 1.7 97.6

Related to Adaptable Power supply reference

  • ARRANGING FOR FIRM ALL-REQUIREMENTS POWER SUPPLY Competitive Supplier shall participate in or make appropriate arrangements with the ISO-NE, any relevant regional transmission organization, wholesale suppliers or any other entity to ensure an uninterrupted flow of reliable, safe, firm, All-Requirements Power Supply to the Local Distributor for delivery to Participating Consumers, and take Commercially Reasonable steps to cooperate with the NEPOOL, the ISO-NE or any other entity to ensure a source of back-up power in the event that the facilities owned or controlled by Competitive Supplier's affiliates or other sources of power supply are unable to generate and/or deliver All-Requirements Power Supply to the Point of Delivery. In the event the Competitive Supplier is unable to deliver sufficient electricity to the grid to serve Participating Consumers, the Competitive Supplier shall utilize such arrangements as may be necessary to continue to serve Participating Consumers under the terms of this ESA, and shall bear any costs it may incur in carrying out these obligations. Competitive Supplier shall not be responsible to the Town or any Participating Consumers in the event the Local Distributor disconnects, curtails or reduces service to Participating Consumers (notwithstanding whether such disconnection is directed by the ISO- NE) in order to facilitate construction, installation, maintenance, repair, replacement or inspection of any of the Local Distributor’s facilities, to maintain the safety and reliability of the Local Distributor’s electrical system, or due to any other reason, including emergencies, forced outages, potential overloading of the Local Distributor’s transmission and/or distribution circuits, Force Majeure or the non-payment of any distribution service costs or other such costs due for services provided by the Local Distributor to a Participating Consumer.

  • All-Requirements Power Supply The service under which the Competitive Supplier provides all of the electrical energy, capacity, reserves, and ancillary services, transmission services, transmission and distribution losses, congestion management, and other such services or products necessary to provide firm power supply to Participating Consumers at the Point of Delivery.

  • Variance Power All funds established at the Foundation are subject to the Foundation’s “variance power”, required by Treasury Regulations for the Foundation and its donors to enjoy the more favorable income tax treatment of a community foundation as opposed to the less favorable income tax treatment of a private foundation. Treasury Regulations Section 170A-9(e)(11)(v)(B)(1) specifically states that the governing body of a community foundation must have the power “to modify any restriction or condition on the distributions of funds for any specified charitable purpose or to specified organizations if, in the sole judgment of the governing body (without the necessity of approval by any participating trustee, custodian or agent), such restriction becomes, in effect, unnecessary, incapable of fulfillment, or inconsistent with the charitable needs of the community or area served”.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Power Supply Information 11.1.1 Monthly/Quarterly Report of Usage Monthly Report of Usage – Competitive Supplier shall provide the Town or its agent with a monthly report of usage which will contain:

  • Bidder Supplied Samples The Commissioner reserves the right to request from the Bidder/Contractor a representative sample(s) of the Product offered at any time prior to or after award of a contract. Unless otherwise instructed, samples shall be furnished within the time specified in the request. Untimely submission of a sample may constitute grounds for rejection of Bid or cancellation of the Contract. Samples must be submitted free of charge and be accompanied by the Bidder’s name and address, any descriptive literature relating to the Product and a statement indicating how and where the sample is to be returned. Where applicable, samples must be properly labeled with the appropriate Bid or Contract reference. A sample may be held by the Commissioner during the entire term of the Contract and for a reasonable period thereafter for comparison with deliveries. At the conclusion of the holding period the sample, where feasible, will be returned as instructed by the Bidder, at the Bidder’s expense and risk. Where the Bidder has failed to fully instruct the Commissioner as to the return of the sample (i.e., mode and place of return, etc.) or refuses to bear the cost of its return, the sample shall become the sole property of the receiving entity at the conclusion of the holding period.

  • Power Supply The source of power for the VAS shall either be the vehicle battery or a rechargeable battery. Where provided, an additional rechargeable or non-rechargeable battery may be used. These batteries shall by no means supply energy to other parts of the vehicle electrical system.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

  • Shipping must be Freight On Board Destination to the delivery location designated on the Customer purchase order The Contractor will retain title and control of all goods until delivery is completed and the Customer has accepted the delivery. All risk of transportation and all related charges are the responsibility of the Contractor. The Customer will notify the Contractor and H-GAC promptly of any damaged goods and will assist the Contractor in arranging for inspection. The Contractor must file all claims for visible or concealed damage. Unless otherwise stated in the Agreement, deliveries must consist only of new and unused merchandise.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria