Additional Requirements for Inspection for Material Completion Sample Clauses

Additional Requirements for Inspection for Material Completion. The Contractor shall not request any Inspection for Material Completion before the Contractor has provided to the Design Professional the following:
AutoNDA by SimpleDocs
Additional Requirements for Inspection for Material Completion. No Inspection for Material Completion shall be requested by the Design-Builder until such time as the Design-Builder has provided to the Program Manager the following: 6.3.2.4.1 a copy of the initial test and balance report on the heating, ventilating and air conditioning system; 6.3.2.4.2 a copy of the facility operation and maintenance instructions and any other documents specified by the Program Manager in Division 1 of the Specifications; and 6.3.2.4.3 a certification that all building systems specified in Paragraph 6. 1.1.1 above are operational. The Design-Builder expressly agrees that the manufacturers are solely the agents of the Design-Builder. In accomplishing this certification, the Design-Builder shall obtain the manufacturer’s certificates and coordinate the initial start-up and testing of building systems. In all cases where the equipment of two or more manufacturers ties in and functions together, the Design-Builder shall require the field representatives to perform simultaneously the initial start-up, the testing, and the placing of their equipment into operation. "Start-up" is defined as putting the equipment into action. "Testing" is defined as performing such testing as is stipulated in the Contract Documents to be performed. "Placing into operation" is defined as operating the equipment for a sufficient period of time for the determination to be made that it is performing properly. All building commissioning activities should be completed, with the exception of those designated as “Permitted Incomplete Work.”
Additional Requirements for Inspection for Material Completion. No Inspection for Material Completion shall be requested by the CM/GC until such time as the CM/GC has provided to the Design Professional the following: a copy of the initial test and balance report on the heating, ventilating and air conditioning system; a copy of the facility operation and maintenance instructions and any other documents specified by the Design Professional in Division 1 of the Specifications; and
Additional Requirements for Inspection for Material Completion. The Contractor shall not request any Inspection for Material Completion before the Contractor has provided to the Design Professional the following: 6.3.2.4.1 a copy of the initial test and balance report on the heating, ventilating, and air conditioning system; 6.3.2.4.2 a copy of the facility operation and maintenance instructions, and any other documents specified by the Design Professional in Division 1 of the Specifications; and 6.3.2.4.3 A certification from the Contractor that all building systems specified in Paragraph 6. 1.1.1 above are operational. The Contractor expressly agrees that obtaining the manufacturer’s warranties are solely the responsibility of the Contractor. In fulfilling this responsibility, the Contractor shall obtain the manufacturer’s certificates in the format specified in Section 7 below, and shall coordinate the initial start-up and testing of building systems. In all cases where the equipment of two or more manufacturers ties in and functions together, the Contractor shall require the manufacturersfield representatives to perform simultaneously the initial start-up, the testing, and the placing of their equipment into operation. "Start-up" is defined as putting the equipment into action. "Testing" is defined as performing such testing as is stipulated in the Contract Documents to be performed. "Placing into operation" is defined as operating the equipment for a sufficient period of time to determine that it is performing properly.
Additional Requirements for Inspection for Material Completion. The Contractor shall not request any Inspection for Material Completion before the Contractor has provided to the Design Professional the following: a copy of the initial test and balance report on the heating, ventilating, and air conditioning system; a copy of the facility operation and maintenance instructions, and any other documents specified by the Design Professional in Division 1 of the Specifications; and

Related to Additional Requirements for Inspection for Material Completion

  • Inspection; Compliance Lessor and Lessor's Lender(s) (as defined in Paragraph 8.3(a)) shall have the right to enter the Premises at any time, in the case of an emergency, and otherwise at reasonable times, for the purpose of inspecting the condition of the Premises and for verifying compliance by Lessee with this Lease and all Applicable Laws (as defined in Paragraph 6.3), and to employ experts and/or consultants in connection therewith and/or to advise Lessor with respect to Lessee's activities, including but not limited to the installation, operation, use, monitoring, maintenance, or removal of any Hazardous Substance or storage tank on or from the Premises. The costs and expenses of any such inspections shall be paid by the party requesting same, unless a Default or Breach of this Lease, violation of Applicable Law, or a contamination, caused or materially contributed to by Lessee is found to exist or be imminent, or unless the inspection is requested or ordered by a governmental authority as the result of any such existing or imminent violation or contamination. In any such case, Lessee shall upon request reimburse Lessor or Lessor's Lender, as the case may be, for the costs and expenses of such inspections.