Agreement as to Ownership and Use of the Project Sample Clauses

Agreement as to Ownership and Use of the Project. The Issuer and the Company agree that title to the Project shall be in and remain in the Company, and that the Project shall be the sole property of the Company in which the Issuer shall have no interest.
AutoNDA by SimpleDocs
Agreement as to Ownership and Use of the Project. The Issuer and the Borrower agree that title to the Project shall be in and remain in the Borrower, and that the Project shall be the sole property of the Borrower in which the Issuer shall have no interest. Notwithstanding the provisions of this Section 6.03, the Borrower in its sole discretion and business judgment may choose to cease operation of the Project or transfer the Project to another entity which may cease such operation, and in such circumstances the covenants contained in this Section 6.03 shall no longer apply.

Related to Agreement as to Ownership and Use of the Project

  • Construction of the Project Highway (i) The Contractor shall construct the Project Highway as specified in Schedule- B and Schedule-C, and in conformity with the Specifications and Standards set forth in Schedule-D. The Contractor shall be responsible for the correct positioning of all parts of the Works, and shall rectify any error in the positions, levels, dimensions or alignment of the Works. The [650th (six hundred and fiftieth) day] from the Appointed Date shall be the scheduled completion date (the “Scheduled Completion Date”) and the Contractor agrees and undertakes that the construction shall be completed on or before the Scheduled Completion Date, including any extension thereof. (ii) The Contractor shall construct the Project Highway in accordance with the Project Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to achieve any Project Milestone or the Scheduled Completion Date within a period of 30 (thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the Contract Price for delay of each day reckoned from the date specified in Schedule –J and until such Project Milestone is achieved or the Project Highway is completed; provided that if the period for any or all Project Milestones or the Scheduled Completion Date is extended in accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall be deemed to be modified accordingly and the provisions of this Agreement shall apply as if Schedule-J has been amended as above; provided further that in the event the Project Highway is completed within or before the Scheduled Completion Date including any Time Extension, applicable for that work or section, the Damages paid under this Clause 10.3 (ii) shall be refunded by the Authority to the Contractor, but without any interest thereon. The Parties agree that for determining achievement or delays in completion of the Project Milestones or the Project on the due date, the works affected due to delay in providing the site for which time extension has been granted beyond the Scheduled Completion Date will be excluded. For example on the due date to achieve the Project Milestone-I (i.e., Stage Payments of 10% (ten percent) of Contract Price on 180th (one hundred and eighty) day from the Appointed Date), if 5% (five percent) of the project length corresponding to the Project Milestone-I is not handed over or lately handed over resulting in the extension of completion of this 5% (five percent) length beyond Scheduled Completion Date, Stage Payment of 10% X 0.95 = 9.5% only is to be achieved by 180th (one hundred and eighty) day. For the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3 (ii) shall be without prejudice to the rights of the Authority under this Agreement including the right of Termination thereof. The Parties further agree that Time Extension hereunder shall only be reckoned for and in respect of the affected Works as specified in Clause 10.5 (ii). (iii) The Authority shall notify the Contractor of its decision to impose Damages in pursuance with the provisions of this Clause 10.3. Provided that no deduction on account of Damages shall be effected by the Authority without notifying the Contractor of its decision to impose the Damages, and taking into consideration the representation, if any, made by the Contractor within 20 (twenty) days of such notice. The Parties expressly agree that the total amount of Damages under Clause 10.3 (ii) shall not exceed 10% (ten percent) of the Contract Price. If the damages exceed 10% (ten percent) of the Contract Price, the Contractor shall be deemed to be in default of this agreement having no cure and the Authority shall be entitled to terminate this Agreement by issuing a Termination Notice in accordance with the provisions of Clause 23.1 (ii). (iv) In the event that the Contractor fails to achieve the Project Completion within a period of 90 (ninety) days from the Schedule Completion Date set forth in Schedule-J, unless such failure has occurred due to Force Majeure or for reasons solely attributable to the Authority, the contractor shall be deemed to be ineligible for bidding any future projects of the Authority, both as the sole party or as one of the parties of Joint Venture/ Consortium during the period from Scheduled Completion Date to issuance of Completion Certificate. This restriction is applicable if the contract value of the delayed project is not less than Rs. 300 Crore.

  • Construction of Agreement The parties mutually acknowledge that they and their attorneys have participated in the preparation and negotiation of this Agreement. In cases of uncertainty this Agreement shall be construed without regard to which of the parties caused the uncertainty to exist.

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Preservation, Maintenance, and Protection of the Property Inspections. Borrower will not destroy, damage, or impair the Property, allow the Property to deteriorate, or commit waste on the Property. Whether or not Borrower is residing in the Property, Borrower must maintain the Property in order to prevent the Property from deteriorating or decreasing in value due to its condition. Unless Lender determines pursuant to Section 5 that repair or restoration is not economically feasible, Borrower will promptly repair the Property if damaged to avoid further deterioration or damage. If insurance or condemnation proceeds are paid to Lender in connection with damage to, or the taking of, the Property, Borrower will be responsible for repairing or restoring the Property only if Xxxxxx has released proceeds for such purposes. Lender may disburse proceeds for the repairs and restoration in a single payment or in a series of progress payments as the work is completed, depending on the size of the repair or restoration, the terms of the repair agreement, and whether Borrower is in Default on the Loan. Lender may make such disbursements directly to Borrower, to the person repairing or restoring the Property, or payable jointly to both. If the insurance or condemnation proceeds are not sufficient to repair or restore the Property, Borrower remains obligated to complete such repair or restoration. Lender may make reasonable entries upon and inspections of the Property. If Lender has reasonable cause, Xxxxxx may inspect the interior of the improvements on the Property. Lender will give Borrower notice at the time of or prior to such an interior inspection specifying such reasonable cause.

  • Use of the Property The Tenant agrees with the Landlord as follows:- 3.1 To use the Room or Studio (as applicable) only as a single private residence for occupation by the Tenant personally and not to allow visitors to remain in the Room or in the Flat or Studio (as applicable) overnight unless the Tenant has registered the visitor at reception and obtained the Landlord’s consent to the visitor remaining in the Room or the Flat or Studio (as applicable) overnight such consent not to be unreasonably withheld or delayed provided that no overcrowding occurs and (where applicable) the other occupiers of the Flat do not raise any objection 3.2 The Tenant shall not: 3.2.1 use the Room Studio Flat or Building for the purposes of conducting a business 3.2.2 keep any pets or other animals on or in the Room Studio Flat or Building without the prior written consent of the Landlord 3.2.3 play or use any musical instrument or television radio or other means of reproducing sound so that the sound is audible outside the Room Flat Studio or Building 3.2.4 connect to the telephone line the internet or any other systems 3.2.5 store bicycles in the Room Flat Studio or Building but to store any bicycle in the designated bicycle areas of the Building only and in the event of the Landlord removing any bicycle stored in breach of this clause to pay to the Landlord within 7 days of written demand £25 before the release of the bicycle to the Tenant 3.2.6 store or keep or use any unlawful substance or materials in the Room Flat Studio or Building at any time and to report to the Landlord or any of its employees the presence of any such unlawful substance or materials 3.2.7 keep store or use in the Room Flat Studio or Building any inflammable or dangerous articles, any lighted candles electronic cigarettes incense sticks shisha pipes naked flame appliances portable heater lamp or other portable apparatus fed by paraffin or liquid gas and to comply with all of the Landlord’s requirements relating to fire safety as set out in the Fire Safety Agreement which is available for inspection at the relevant onsite management reception 3.2.8 keep or use in the Room Flat Studio or Building any electrical heating and/or electrical cooking equipment and/or multiway adaptors; 3.2.9 bring into or keep in the Room Flat Studio or Building any other electrical items (“the Items”) unless the Tenant has first produced by prior appointment the Items to the Landlord’s officer in the relevant onsite management reception for Portable Appliance Testing (“XXX”) and thereafter obtained the approval of the Landlord to the keeping and using of the Items in the Room or the Flat or Studio, ( as applicable) which approval will be given if the Items are in good safe working order and meet the XXX requirements 3.2.10 expose or allow to be hung any laundry washing or other items so as to be visible from outside of the Room Flat Studio or Building and not to dry clothes on the storage heaters 3.2.11 not to bring into or keep in the Room Flat Studio or Building any washing machine 3.2.12 glue stick nail tack screw fix or fasten (whether with Blue-Tack or similar materials) anything whatsoever to the interior or the exterior of the Room Flat Studio or Building 3.2.13 smoke (including electronic cigarettes) or use non-prescription drugs within the Room Flat Studio or Building 3.2.14 part with the keys or access fob to the Room Flat Studio or Building and to report immediately any loss of the same to the Landlord and to pay to the Landlord before the Landlord issues any replacements the sum of £20 for each replacement key and £15 for each replacement access fob (and if a key or access fob is found and returned by the student after a replacement has been issued and the cost charged, the refund of the cost is at the Landlord’s discretion and in any event an administrative fee may be charged.) 3.2.15 damage or force or in any way misuse any locks in the Room Flat Studio or Building and in the event of default to pay to the Landlord on demand all reasonable costs (including an additional administration charge) reasonably incurred by the Landlord in replacing the same and/or making good all damage caused 3.2.16 connect to or trail wires from the telephone apparatus and/or any television in the Room Flat Studio or Building to protect the health and safety of the Tenant and (where applicable) the occupiers of the Building 3.2.17 tamper with any fire safety equipment in the Room Flat Studio or Building including without limitation fire extinguishers, smoke alarms, emergency exit signs and break glass alarm points 3.2.18 cause a nuisance annoyance or interference or threaten or abuse any other residents in the Building any employees servants or agents of the Landlord or the owners and occupiers of neighbouring, adjoining or adjacent property or the owners of occupiers of them; 3.2.19 do anything that has the effect of invalidating the insurance that the Landlord has taken out in relation to the Building 3.2.20 use the Room or the Flat or the Studio for immoral or illegal purposes or otherwise commit or be involved in any criminal activity 3.3 The Tenant agrees to: 3.3.1 where applicable, open the windows in the Room or the Studio to the tilt position for at least 30 minutes each day (provided that the Tenant is in occupation) to ventilate the Room or Studio and not to open the windows in the Room beyond the tilt position save in emergencies. 3.3.2 always to use the extractor fan in the bathroom when using the bathroom and not to disable the extractor fan except for safety reasons in an emergency 3.3.3 use best endeavours to ensure that the Tenant’s visitors comply with the Tenant’s obligations under this Agreement while present in the Room Flat Studio or the Building 3.3.4 comply with additional obligations or restrictions set out in any management scheme or other regulations reasonably required by the Landlord which may be notified to the Tenant in writing from time to time. 3.4 Unless otherwise expressly provided, the obligations and liabilities of the Tenant under this agreement are joint and several. This means that where, there is more than one tenant of the Studio Flat or the Building the Tenant will be liable for all sums due under the agreement, not just liable for a proportionate part.

  • Operation of Agreement This Agreement will be effective and binding immediately upon its execution, but, anything in this Agreement to the contrary notwithstanding, this Agreement will not be operative unless and until a Change in Control occurs. Upon the occurrence of a Change in Control at any time during the Term, without further action, this Agreement shall become immediately operative.

  • Execution of the Project (a) The Recipient declares its commitment to the objectives of the Project as set forth in Schedule 2 to this Agreement, and, to this end, shall carry out the Project through its MoE with due diligence and efficiency and in conformity with appropriate financial, economic, environmental and administrative practices, and shall provide, promptly as needed, the funds, facilities, services and other resources required for the Project. (b) Without limitation upon the provisions of paragraph (a) of this Section and except as the Recipient and the Association shall otherwise agree, the Recipient shall carry out the Project in accordance with the Implementation Program set forth in Schedule 4 to this Agreement. (a) Except as the Association shall otherwise agree, procurement of the goods, works and consultants’ services required for the Project and to be financed out of the proceeds of the Grant shall be governed by the provisions of Schedule 3 to this Agreement, as said provisions may be further elaborated in the Procurement Plan. (b) The Recipient shall update the Procurement Plan in accordance with terms of reference acceptable to the Association, and furnish such update to the Association not later than twelve (12) months after the date of the preceding Procurement Plan, for the Association’s approval. Section 3.03. Without limitation upon any of its obligations under paragraph (a) of Section 3.01 of this Agreement and except as the Recipient and the Association shall otherwise agree, the Recipient shall: (i) not later than by the effectiveness of this Agreement open a separate project account (the Project Account) in a commercial bank acceptable to the Association; (ii) thereafter maintain the Project Account during the entire Project implementation period, and replenish said Account regularly with funds sufficient to ensure the Recipient’s Project co-financing obligations; and (iii) use the amount in the Project Account exclusively for financing the Recipient’s contribution to Project expenditures. Section 3.04. For the purposes of Section 6.09 of the General Conditions and without limitation thereto, the Recipient shall: (a) prepare, on the basis of guidelines acceptable to the Association, and furnish to the Association not later than six (6) months after the Closing Date or such later date as may be agreed for this purpose between the Recipient and the Association, a plan designed to ensure the continued achievement of the Project’s objectives; and (b) afford the Association a reasonable opportunity to exchange views with the Recipient on said plan.

  • LOCATION AND DESCRIPTION OF THE PROPERTY The subject property is a single-storey terraced house bearing the postal address of Xx. 00, Xxxxxx 00/XX0, Xxxxxx Xxxxx Xxxxxxx, 00000 Xxxxxxx Xxxxx, Xxxxxx. The subject property will be sold on an “as is where is basis” and subject to a reserve price of RM310,000.00 (RINGGIT MALAYSIA THREE HUNDRED TEN THOUSAND ONLY) and subject to the Conditions of Sale and by way of an Assignment from the above Assignee/Bank subject to the consent being obtained by the Purchaser from the Developer and other relevant authorities if any, including all terms, conditions, stipulations and covenants which were and may be imposed by the Developer and the relevant authorities. Any arrears of quit rent, assessments and service or maintenance charges which may be lawfully due to any relevant authority or the Developer up to the date of auction sale of the property shall be paid out of the purchase money upon receipt of full purchase price. All other fees, costs and charges relating to the transfer and assignment of the property shall be borne by the successful Purchaser. Online bidders are further subject to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx. All intending bidders are required to deposit 10% of the fixed reserve price for the said property by Bank Draft or Cashier’s Order in favour of UOBM for KRISHNAMAL A/P MURLIGIAH & XXXXXXXXXXX A/L XXXXXXX or remit the same through online banking transfer, one (1) working day before auction date. The balance of the purchase money shall be paid by the Purchaser within one hundred and twenty (120) days from the date of auction sale to UNITED OVERSEAS BANK (MALAYSIA) BHD via Real Time Electronics Transfer of Funds and Securities (XXXXXX). For online bidders please refer to the Terms & Conditions on xxx.xxxxxxxxxxxxxxxx.xxx on the manner of payment of the deposit. FOR FURTHER PARTICULARS, please contact M/S HOE & MOIRA, of Xxxxx 000X (Xxxxx), 0xx Xxxxx, Xxxxx Xxxxxx Xxxxxx, Xxxxxxxxxx Xxxx, 00000 Xxxxxx, Xxxxxxxx. (Ref:H&M/MT/Z4P/CB23/16) Tel.: 00-000 0000, Fax: 00-000 0000) the Assignee herein or the undermentioned Auctioneer. Suite C-20-3A, Level 20, Block C, Megan Avenue II, / XXXXX XXXXX BIN XXXXXX 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur (Licensed Auctioneers) Tel No.: 00-0000 0000 Fax No.: 00-0000 0000 Our Ref: LIAN/UOB1035HM Website: xxx.xxxxxxxxxxxxxxxx.xxx E-mail: xxxx@xxxxxxxxxxxxxxxx.xxx [berkuatkuasa dari 1.11.2022, perniagaan perbankan pengguna (consumer banking business) CITIBANK BERHAD (No. Syarikat: 199401011410 (297089-M) telah dipindahmilik kepada xxx diletakhakkan kepada UOB di bawah Perintah Letakhak bertarikh 12.10.2022 melalui Mahkamah Tinggi Kuala Lumpur Saman Pemula No. WA-24NCC-903-09/2022] Dalam menjalankan xxx xxx kuasa xxxx telah diberikan kepada Pihak Pemegang Serahhak/Bank dibawah Perjanjian Kemudahan, Penyerahanhak xxx Surat Kuasa Wakil kesemuanya Bertarikh 09hb Julai, 2001 diantara Pihak Penyerahhak, Pihak Pelanggan xxx Pihak Pemegang Serahhak/Bank yang diperbuat dalam perkara diatas, adalah dengan ini diisytiharkan bahawa Pihak Pemegang Serahhak/Bank tersebut dengan bantuan Pelelong yang tersebut dibawah.

  • Construction of the Project The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Access to NID 2.7.3.1 NewPhone may access the customer’s premises wiring by any of the following means and NewPhone shall not disturb the existing form of electrical protection and shall maintain the physical integrity of the NID: 2.7.3.1.1 BellSouth shall allow NewPhone to connect its Loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premises; 2.7.3.1.2 Where an adequate length of the customer’s premises wiring is present and environmental conditions permit, either Party may remove the customer premises wiring from the other Party’s NID and connect such wiring to that Party’s own NID; 2.7.3.1.3 Either Party may enter the subscriber access chamber or dual chamber NID enclosures for the purpose of extending a cross-connect or spliced jumper wire from the customer premises wiring through a suitable “punch-out” hole of such NID enclosures; or 2.7.3.1.4 NewPhone may request BellSouth to make other rearrangements to the customer premises wiring terminations or terminal enclosure on a time and materials cost basis. 2.7.3.2 In no case shall either Party remove or disconnect the other Party’s loop facilities from either Party’s NIDs, enclosures, or protectors unless the applicable Commission has expressly permitted the same and the disconnecting Party provides prior notice to the other Party. In such cases, it shall be the responsibility of the Party disconnecting loop facilities to leave undisturbed the existing form of electrical protection and to maintain the physical integrity of the NID. It will be NewPhone’s responsibility to ensure there is no safety hazard, and NewPhone will hold BellSouth harmless for any liability associated with the removal of the BellSouth Loop from the BellSouth NID. Furthermore, it shall be the responsibility of the disconnecting Party, once the other Party’s loop has been disconnected from the NID, to reconnect the disconnected loop to a nationally recognized testing laboratory listed station protector, which has been grounded as per Article 800 of the National Electrical Code. If no spare station protector exists in the NID, the disconnected loop must be appropriately cleared, capped and stored. 2.7.3.3 NewPhone shall not remove or disconnect ground wires from BellSouth’s NIDs, enclosures, or protectors. 2.7.3.4 NewPhone shall not remove or disconnect NID modules, protectors, or terminals from BellSouth’s NID enclosures. 2.7.3.5 Due to the wide variety of NID enclosures and outside plant environments, BellSouth will work with NewPhone to develop specific procedures to establish the most effective means of implementing this section if the procedures set forth herein do not apply to the NID in question.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!