Anchor Winches Sample Clauses

Anchor Winches. Quantity no. 1 Make/model Rolls-Royce Model Type CU 107 U3 H 55.4 Tons @ 9m/min Max Pull 83.2 tonnes Brake holding load 365.1 tonnes Type (electric/hydraulic/diesel) Hydraulic
AutoNDA by SimpleDocs
Anchor Winches. Quantity : 2 Make/Model : Rolls Royce Type (electric/hydraulic/diesel) : Electric Motors per winch : 1 Motor make/type : Xxx Xxxxxxx Gimbh (BEN-440V60HZ-12/4/2-280 S-73, OKW-122A Total HP per winch : 593.3 Knots Rated pull : 40.2 ton Speed low gear : 9 m/min Test load : 40.2 ton Control locations (local/remote/both) : local Emergency release (type/location) : Electric motor exist manual of release for brake
Anchor Winches. Quantity: no. 2 Make/model: Miria ind. / EMW56.7-1 D + GBM (M1) / (M2) Type (electric/hydraulic/diesel): Electrical Motors per winch: no. 1
Anchor Winches. Quantity no.: N/A Make Type (electric/hydraulic/diesel) : Rated pull mt Speed low gear ft/m: Test load : Control locations (local/remote/both) : Emergency release (type/location) :
Anchor Winches. Quantity No. Make/Model Type

Related to Anchor Winches

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Elevation Elevation is defined as restoring an employee to the higher classification, with permanent status, which was held prior to being granted a demotion or to a class that is between the current class and the class from which the employee was demoted. Upon elevation, an employee’s salary will be determined in the same manner that is provided for promotion in Section 43.5, above.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Earthquake including land shock waves or tremors before, during or after a volcanic eruption;

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Inclement Weather 16.1 The parties are committed to working together to minimize the impact of inclement weather. The employer will ensure reasonable allowance is included in contracts taking into account historic weather conditions and forecast rainfall. 16.2 Inclement weather means the existence of rain or abnormal climatic conditions (whether hail, extreme cold, high wind, severe dust storm, extreme heat (as defined in clause 14), poor air quality (as defined in clause 15), or the like or any combination of these conditions) where it is not reasonable or it is unsafe for employees to continue working in those conditions. 16.3 The employer or its representative, when requested by the employees or their representative, must confer within a reasonable time (which does not exceed 60 minutes) for the purpose of determining whether or not the conditions referred to in clause 16.2 apply. 16.4 The time work stops due to inclement weather and the resumption of work after a period of inclement weather has ended will be recorded by the employer. 16.5 When inclement weather conditions exist, an affected employee is not required to start or continue to work where it is unreasonable or unsafe to do so. In cases where emergency work is required or it is necessary to complete a concrete pour already commenced to a practical stage, work may occur or continue provided that such work does not give rise to a reasonable concern on the part of an employee undertaking the work of an imminent risk to their health or safety. 16.6 Where emergency work or a concrete pour is completed in accordance with clause 16.5, work will be paid at the rate of 200% of the ordinary hourly rate calculated to the next hour, and in the case of wet weather, the employee will be provided with adequate wet weather gear. If an employee’s clothes become wet as a result of working in the rain the employee will be allowed to go home for the remainder of the day without loss of pay. 16.7 Where an employee is not able to perform any work at any location because of inclement weather, the employee will receive payment at the ordinary hourly rate for ordinary hours. Payment for time lost due to inclement weather is subject to a maximum of 32 hours pay in any 4-week period for each employee. Payment is subject to adherence to the terms of clause 16. 16.8 An employee working on a Job Share arrangement pursuant to clause 30—Job Share, that is affected by inclement weather, will be entitled to payment from the 32-hour inclement weather bank on a pro rata basis. 16.9 Employees accumulated inclement weather bank shall not be deducted whilst they remain on site. 16.10 Inclement weather occurring during overtime will not be taken into account for the purposes of clause 16 and employees will not be entitled to any payment for stoppages because of inclement weather that occurs outside of ordinary hours. 16.11 Employees on a portion of a site not affected by inclement weather must continue to work even though employees working on other areas of the site may have stopped work because of inclement weather. 16.12 Subject to the availability of alternative work in an employee’s classification, an employer may require employees to transfer: (a) from a location on a site where it is unreasonable and/or unsafe to work because of inclement weather, to another area on the same site, where it is reasonable and safe to work; and/or (b) from a site where it is unreasonable and/or unsafe to work because of inclement weather, to another site, where it is reasonable and safe to work, and where the employer, where necessary, provides transport. 16.13 Remaining on site where, because of inclement weather, the employees are prevented from working: (a) for more than an accumulated total of 4 hours of ordinary time in any one day; or (b) after the main meal break, for more than half of the ordinary work time; or (c) during the final 2 hours of the normal workday for more than an accumulated total of one hour; the employer will not be entitled to require the employees to remain on site beyond the expiration of any of the above circumstances. However, where genuine training has been agreed in writing between the parties, then the course maybe completed in extraordinary circumstances. 16.14 Where the employees are in the sheds, because they have been rained off, or because it is at starting time, morning tea, or lunch time, and it is raining, they will not be required to go to work in a dry area or to be transferred to another site unless: (a) the rain stops; or (b) a covered walkway has been provided; or (c) the sheds are under cover and the employees can get to the dry area without going through the rain; or (d) adequate protection is provided. 16.15 Protection must, where necessary, be provided for the employees’ tools.

  • Area The sphere of operation shall be England, Wales and Northern Ireland.

  • Flood If any of the Improvements are located in an area identified by the Federal Emergency Management Agency (or any successor to that agency) as a “Special Flood Hazard Area,” flood Insurance in the amount required by Lender.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!