As-Built Drawings. The Gas Company shall, within six months of completing the installation of any part of the gas system, provide two copies of "as built" drawings to the Engineer/Road Superintendent. These drawings must be sufficient to accurately establish the location, depth (measurement between the top of the gas system and the ground surface at the time of installation) and distance of the gas system. The "as built" drawings shall be of the same quality as the Plan and, if the approved pre-construction plan included elevations that were geodetically referenced, the "as built" drawings shall similarly include elevations that are geodetically referenced. Upon the request of the Engineer/Road Superintendent, the Gas Company shall provide one copy of the drawings in an electronic format and one copy as a hard copy drawing.
Appears in 13 contracts
Samples: Franchise Agreement, Franchise Agreement, Franchise Agreement
As-Built Drawings. The Gas Company shall, within six months of completing the installation of any part of the gas system, provide two copies of "as built" drawings to the Engineer/Road Superintendent. These drawings must be sufficient to accurately establish the location, depth (measurement between the top of the gas system and the ground surface at the time of installation) and distance of the gas system. The "as built" drawings shall be of the same quality as the Plan and, if the approved pre-pre- construction plan included elevations that were geodetically referenced, the "as built" drawings shall similarly include elevations that are geodetically referenced. Upon the request of the Engineer/Road Superintendent, the Gas Company shall provide one copy of the drawings in an electronic format and one copy as a hard copy drawing.
Appears in 5 contracts
Samples: Franchise Agreement, Franchise Agreement, Franchise Agreement