Assessment of the Exterior Walls and Enclosed Cavities Sample Clauses

Assessment of the Exterior Walls and Enclosed Cavities. In order to create a proper thermal envelope, all exterior walls, overhangs, and enclosed cavities must be fully insulated. Determine the existing level of insulation in enclosed cavities by drilling small holes or checking behind light switch or outlet plates. During the diagnostic visit the Energy Specialist will use an IR camera to help verify the existing level of insulation within wall cavities. All enclosed cavities shall be insulated with densepack cellulose. In order for an enclosed cavity to be properly insulated, at least two inches of free space must exist for the cellulose hose to fit into the cavity properly. The following measures depict the specific types of wall insulation measures available through the Mass Save program. Exterior Wall Insulation: • Exterior blow – Recommend an exterior blow if the house has removable siding. If previously blown in insulation is found in the wall cavities, recommend a diagnostic visit to determine the extent of the existing insulation. • Interior Drill and Blow – Recommend an interior drill and blow if the home has stucco, brick, masonry, or asbestos siding under another type of siding.
AutoNDA by SimpleDocs

Related to Assessment of the Exterior Walls and Enclosed Cavities

  • Additional Requirements for Sleeping Rooms The Contractor shall provide departing Attendees a secured area for storing belongings.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.

  • No Storing Hazardous Articles Not to keep or store any offensive, combustible, obnoxious, hazardous or dangerous articles in the said Apartment, the Common Areas, and the Building.

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • BUILDING SERVICES CONTRACTS In compliance with Article 9, Section 230 of the New York State Labor Law:

  • Evaluation Cycle: Formative Assessment A) A specific purpose for evaluation is to promote student learning, growth and achievement by providing Educators with feedback for improvement. Evaluators are expected to make frequent unannounced visits to classrooms. Evaluators are expected to give targeted constructive feedback to Educators based on their observations of practice, examination of artifacts, and analysis of multiple measures of student learning, growth and achievement in relation to the Standards and Indicators of Effective Teaching Practice.

  • Environmental Measures (i) The Contractor agrees to conduct its activities in connection with the Agreement in such a manner so as to comply with the environmental requirements which includes, inter alia, all the conditions required to be satisfied under the environmental clearances and applicable law, and assumes full responsibility for measures which are required to be taken to ensure such compliance.

  • AIR OR WATER POLLUTION VIOLATION Under the State laws, the Contractor shall not be: (1) in violation of any order or resolution not subject to review promulgated by the State Air Resources Board or an air pollution control district; (2) subject to cease and desist order not subject to review issued pursuant to Section 13301 of the Water Code for violation of waste discharge requirements or discharge prohibitions; or (3) finally determined to be in violation of provisions of federal law relating to air or water pollution.

  • Building Permit As soon as the Final Interior Plans have been approved by Landlord and Tenant, Landlord shall apply for a building permit for the Interior Improvements, and shall diligently prosecute to completion such approval process.

  • Procurement of the Site 10.3.1 Pursuant to the notice specified in Clause 4.1.2, the Authority Representative and the Concessionaire shall, on a mutually agreed date and time, inspect the Site and prepare a memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site. Such memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been granted to the Concessionaire. Signing of the memorandum, in two counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall, subject to the provisions of Clause 10.2.2, be deemed to constitute a valid licence and Right of Way to the Concessionaire for free and unrestricted use and development of the vacant and unencumbered Site during the Concession Period under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. For the avoidance of doubt, it is agreed that valid licence and Right of Way with respect to the parts of the Site as set forth in the Appendix shall be deemed to have been granted to the Concessionaire upon vacant access thereto being provided by the Authority to the Concessionaire.

Time is Money Join Law Insider Premium to draft better contracts faster.