Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 156 contracts
Samples: Interconnection Agreement, Standard Large Generator Interconnection Agreement, Transmission Facility Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Provider's Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s Provider's issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 38 contracts
Samples: Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 38 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerParticipating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Ownerthe Participating TO’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.Article
Appears in 37 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting the Transmission Owner’s Attachment Facilities Interconnection Facilities, Transmission Owner’s System Protection Facilities, Distribution Upgrades and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 32 contracts
Samples: Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Distribution Provider's Interconnection Facilities, Distribution Upgrades, and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-twenty- four months following Connecting Transmission OwnerDistribution Provider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 30 contracts
Samples: Generator Interconnection Agreement, Generator Interconnection Agreement, Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Interconnecting Transmission Owner’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four (24) months following Connecting Interconnecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 16 contracts
Samples: Large Generator Interconnection Agreement, Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s 's Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades UpgradeFacilities shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s 's issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 13 contracts
Samples: Interconnection Agreement, Service Agreement, Service Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and the Affected System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting the issuance by the Affected Transmission Owner’s issuance Owner or Developer, as applicable, of a final invoice in accordance with Article 12.2 7.1 of this Agreement.
Appears in 13 contracts
Samples: Engineering, Procurement, and Construction Agreement, Service Agreement, Service Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerParticipating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Ownerthe Participating TO’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.issuance
Appears in 12 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Interconnection Facilities, and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 10 contracts
Samples: Generator Interconnection Agreement, Generator Interconnection Agreement, Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and the Affected System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting the issuance by Affected System Operator or Transmission Owner’s issuance Developer, as applicable, of a final invoice in accordance with Article 12.2 7.2 of this Agreement.
Appears in 10 contracts
Samples: Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 7 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerParticipating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.the
Appears in 7 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerProvider’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerProvider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 7 contracts
Samples: Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement (Lgia), Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System the Network Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 7 contracts
Samples: Transmission Project Interconnection Agreement, Interconnection Agreement, Transmission Project Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s 's Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s 's issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 6 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Systemthe Network Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-twenty- four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 5 contracts
Samples: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Interconnection Facilities, Transmission Owner’s System Protection Facilities, Distribution Upgrades and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 4 contracts
Samples: Large Generator Interconnection Agreement (ITC Holdings Corp.), Generator Interconnection Agreement, Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerNational Grid’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 4 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and Facilities, System Upgrade Facilities Facilities, and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 4 contracts
Samples: Standard Interconnection Agreement, Standard Interconnection Agreement, Standard Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s 's Attachment Facilities and System Upgrade Facilities F 64 acilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s 's issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 3 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System the Network Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 3 contracts
Samples: Transmission Project Interconnection Agreement, Transmission Project Interconnection Agreement, Transmission Project Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Distribution Provider's Interconnection Facilities, Distribution Upgrades, and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerDistribution Provider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 3 contracts
Samples: Service Agreement for Wholesale Distribution Service, Standard Large Generator Interconnection Agreement (Lgia), Standard Large Generator Interconnection Agreement (Lgia)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Distribution Provider's Interconnection Facilities, Distribution Upgrades, and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-twenty- four months following Connecting Transmission OwnerDistribution Provider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.12.2.
Appears in 2 contracts
Samples: Clustering Large Generator Interconnection Agreement and Distribution Service Agreement, Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerParticipating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Ownerthe Participating TO’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.
Appears in 2 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 2 contracts
Samples: Transmission Facility Interconnection Agreement, Transmission Facility Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Provider's Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerProvider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 2 contracts
Samples: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement (Lgia)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Systemthe Network Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-twenty- four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 2 contracts
Samples: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Interconnection Facilities, Transmission Owner’s System Protection Facilities, Distribution Upgrades and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.with
Appears in 2 contracts
Samples: Generator Interconnection Agreement, Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 0 of this Agreement.
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerParticipating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Ownerthe Participating TO’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.Article
Appears in 2 contracts
Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting the Transmission Owner’s Attachment Facilities Interconnection Facilities, Transmission Owner’s System Protection Facilities, Distribution Upgrades and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.with
Appears in 2 contracts
Samples: Generator Interconnection Agreement, Power Purchase Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment System Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerOperating Agent’s issuance of a final invoice in accordance with Article 12.2 of this Agreement15.2.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Interconnecting Transmission Owner’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four (24) months following Connecting the Initial Synchronization Date.Interconnecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Interconnection Facilities, Transmission Owner’s System Protection Facilities, Distribution Upgrades and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.following
Appears in 1 contract
Samples: Generator Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerAffected Participating TO’s Attachment Facilities Interconnection Facilities, Network Upgrades, and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Affected Participating TO shall be subject to audit for a period of twenty-four months following Connecting Transmission Ownerthe Affected Participating TO’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Samples: Affected Participating Transmission Owner Upgrade Facilities Agreement (Ufa)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 Error! Reference source not found. of this Agreement.
Appears in 1 contract
Samples: Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Interconnecting Transmission Owner’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four (24) months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.following
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Distribution Provider's Interconnection Facilities, Distribution Upgrades, and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.twenty-
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.following
Appears in 1 contract
Samples: Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.Connecting
Appears in 1 contract
Samples: Interconnection Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerProvider’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerProvider’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Provider's Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-twenty- four (24) months following Connecting Transmission Owner’s Provider's issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Samples: Standard Large Generator Interconnection Agreement (Lgia)
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission OwnerProvider’s InterconnectionOwner’s Attachment Facilities and System Network UpgradesSystem Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission OwnerProviderOwner’s issuance of a final invoice in accordance with Article 12.2 12.2.12.2 of this Agreement.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and andthe Affected System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-twenty- four months following Connecting Transmission Owner’s Owner’sthe issuance of a final invoice in accordance with Article 12.2 12.27.1 of this Agreement.
Appears in 1 contract
Samples: Standard Large Generator Interconnection Service Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 12.2 of this Agreement.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Connectingthe Transmission Owner’s Attachment Facilities and System SystemProject and Network Upgrade Facilities and System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities Owners’ Interconnection Facilities, Network Upgrades and System Upgrade Facilities and System Deliverability Distribution Upgrades constructed by the Transmission Owners shall be subject to audit for a period of twenty-four months following Connecting Transmission Owner’s issuance issuances of a final invoice invoices in accordance with Article 12.2 of this Agreement12.
Appears in 1 contract
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and the Common System Deliverability Upgrades shall be subject to audit for a period of twenty-four months following Connecting the issuance by a Developer or an Affected Transmission Owner’s issuance , as applicable, of a final invoice in accordance with Article 12.2 7.1 of this Agreement.
Appears in 1 contract
Samples: Engineering, Procurement, and Construction Agreement
Audit Rights Period for Construction-Related Accounts and Records. Accounts and records related to the design, engineering, procurement, and construction of Connecting Interconnecting Transmission Owner’s Attachment Owner s’ Interconnection Facilities and System Upgrade Facilities and System Deliverability Network Upgrades shall be subject to audit for a period of twenty-four (24) months following Connecting each Interconnecting Transmission Owner’s issuance of a final invoice in accordance with Article 12.2 of this Agreement12.2.
Appears in 1 contract
Samples: Service Agreement