Vessels Each Vessel is
SHIPPING AND SHIPPING COSTS All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities. Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity. Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition. Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.
Drop Shipped Off loaded by carrier to an Agency loading dock or designated area. There will be no charge to the ordering Agency for this delivery method.
Aircraft This peril includes self-propelled missiles and spacecraft.
SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State.
Baggage and Cargo THE CARRIER shall be liable for loss, destruction or damage to cargo or checked baggage if the act causing the damages occurred during air transportation.
Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA.
PACKING AND SHIPPING a. Seller shall pack the goods and materials to prevent damage and deterioration. Unless otherwise set forth in this Contract, Seller shall package the goods in accordance with the requirements of Boeing Document D37522-6 “Supplier Packaging”. Buyer may charge Seller for damage to or deterioration of any goods resulting from improper packing or packaging.
DELIVERY, STORAGE, AND HANDLING The Contractor shall be responsible to inspect all components on delivery to ensure that no damage occurred during shipping or handling for furnish and installation projects. For equipment only purchases, the ordering entity shall be responsible to inspect all components on delivery. Materials must be stored in original undamaged packaging in such a manner to ensure proper ventilation and drainage, and to protect against damage, weather, vandalism, and theft until ready for installation.
Packaging and Shipping 3.1 Seller shall properly xxxx, xxxx, ship and route the Products in accordance with the requirements of Timken and the carriers and in accordance with all applicable laws and regulations, or if there are no stated requirements, in accordance with best commercial practices designed to prevent loss or damage due to weather, transportation and other causes.