Based on symptoms Sample Clauses

Based on symptoms. Symptom Indication Actions Nitrogen pressure gauge displays 0 psi No nitrogen in the nitrogen tank because of any of the following reasons: R Leakage at the CMS tank outlet. R Failure of non-return valve. R Bursting of the pneumatic pipe at the output of CMS tank. R End fittings of the nitrogen tank are loose. R Safety valve is loosely connected. R Burst or leakage in the pneumatic pipe at the output of nitrogen tank. R Leakage at the end fitting of pressure gauge. R Contact customer service to replace the pneumatic pipe of the CMS tank. R Contact customer service to replace non-return valve. R Tighten the end fittings of the nitro- gen tank. R Tighten the pressure relief valve and check for leakage. If leakage persists, contact customer service to replace the pressure relief valve. R Contact customer service to replace the pneumatic pipe at the output of the nitrogen tank. No display 5 VDC supply is not available because of any of the following reasons: R Check if the power cable is connected to the mains supply. R Power supply board has failed R 5 VDC wire is disconnected from the terminal block. R LCD connector is disconnected from the con- trol board. R Control board has failed. R Contact customer service to replace the power supply board. R Connect the 5 VDC wire back to termi- nal block. R Connect the LCD connector to connec- tor on the control board. R Contact customer service to replace the control board. Filling rate of nitrogen is slow R Pressure of the compressed air supply to the unit is less than 8 bar. R Pressure of the compressed air supply is not continuous. R Flow rate of the incoming compressed air is less than 120 lpm. R For best performance, ensure that the pressure of compressed air supply is constantly in the range of 10 bar to 16 bar. Also, ensure that the flow rate is 120 lpm. en 12 | NTI 105 | Troubleshooting Symptom Indication Actions Unable to switch on unit R Power cable is not connected properly. R Power socket wires are disconnected. R Fuse at power socket blown. R Power supply board is damaged. R Power supply connections to terminal blocks are incorrect. R Ensure that the power cable is connect- ed properly to the power socket and to the mains supply. R Contact customer service to replace the power supply board. R Contact customer service to correct the power supply connections to the termi- nal block. R Replace fuse at the power socket. Purity of generated nitrogen is very low R Flow regulator setting altered. R Filtering of...
AutoNDA by SimpleDocs

Related to Based on symptoms

  • Waiver of Appellate and Post-Conviction Rights a. The defendant acknowledges, understands and agrees that by pleading guilty pursuant to this plea agreement he waives his right to appeal or collaterally attack a finding of guilt following the acceptance of this plea agreement, except on grounds of (1) ineffective assistance of counsel; or (2) prosecutorial misconduct.

  • Commingling of Resold Services with Unbundled Network Elements and Combinations of Unbundled Network Elements 6.7.1 To the extent it is Technically Feasible and pursuant to the terms of Section 9.1, CLEC may Commingle Telecommunications Services purchased on a resale basis with an Unbundled Network Element or combination of Unbundled Network Elements.

  • Staffing Levels to deal with Potential Violence The Employer agrees that, where there is a risk of violence, an adequate level of trained employees should be present. The Employer recognizes that workloads can lead to fatigue and a diminished ability both to identify and to subsequently deal with potentially violent situations.

  • Unbundled Voice Loop – SL2 (UVL-SL2 Loops may be 2-wire or 4-wire circuits, shall have remote access test points, and will be designed with a DLR provided to NewPhone. SL2 circuits can be provisioned with loop start, ground start or reverse battery signaling. OC is provided as a standard feature on XX0 Xxxxx. The OC feature will allow NewPhone to coordinate the installation of the Loop with the disconnect of an existing customer’s service and/or number portability service. In these cases, BellSouth will perform the order conversion with standard order coordination at its discretion during normal work hours.

  • Reports of unusual occurrence The Contractor shall, during the Maintenance Period, prior to the close of each day, send to the Authority and the Authority’s Engineer, by facsimile or e- mail, a report stating accidents and unusual occurrences on the Project Highway relating to the safety and security of the Users and Project Highway. A monthly summary of such reports shall also be sent within 3 (three) business days of the closing of month. For the purposes of this Clause 15.4, accidents and unusual occurrences on the Project Highway shall include:

  • Non-discrimination Based on National Origin as evidenced by Limited English Proficiency The Contractor agrees to comply with the non-discrimination requirements of Title VI of the Civil Rights Act of 1964, 42 USC Section 2000d, et seq., and with the federal guidelines promulgated pursuant to Executive Order 13166 of 2000, which require that contractors and subcontractors receiving federal funds must assure that persons with limited English proficiency can meaningfully access services. To the extent the Contractor provides assistance to individuals with limited English proficiency through the use of oral or written translation or interpretive services in compliance with this requirement, such individuals cannot be required to pay for such services.

  • Program Requirements Provided At No Charge to the Judicial Council A. The Contractor shall provide the following items during the Program at no charge to the Judicial Council:

  • Unbundled Voice Xxxx - XX0 (XXX-XX0). Loops are 2-wire loop start circuits, will be non-designed, and will not have remote access test points. OC will be offered as a chargeable option on XX0 Xxxxx when reuse of existing facilities has been requested by NewPhone, however, OC is always required on UCLs that involve the reuse of facilities that are currently providing service. NewPhone may also order OC-TS when a specified conversion time is requested. OC-TS is a chargeable option for any coordinated order and is billed in addition to the OC charge. An Engineering Information (EI) document can be ordered as a chargeable option. The EI document provides Loop Make-Up information which is similar to the information normally provided in a Design Layout Record (DLR). Upon issuance of a non-coordinated order in the service order system, XX0 Xxxxx will be activated on the due date in the same manner and time frames that BellSouth normally activates POTS-type Loops for its customers.

  • Authority to act on behalf of Concessionaire 36.2.1 During the period of Suspension, the Authority shall, on behalf of the Concessionaire, collect all Fee and revenues under and in accordance with this Agreement and deposit the same in the Escrow Account. The Authority shall be entitled to make withdrawals from the Escrow Account for meeting the costs incurred by it for remedying and rectifying the cause of Suspension, and thereafter for defraying the expenses specified in Clause 31.3.

  • CLOSURE TO PREVENT DAMAGE In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 6 inches on roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Purchaser shall protect the work from damage or deterioration.

Time is Money Join Law Insider Premium to draft better contracts faster.