Metode Penelitian Penelitian ini bersifat deskriptif. Jenis penelitian yang digunakan adalah hukum normatif. Sumber data yang dipergunakan pada penelitian ini adalah data sekunder yang terdiri dari :
Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.
Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.
Mass Rock Mass rock is defined as any material that cannot be ripped with a single- tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.
Caisson Rock Caisson Rock is defined as material that must be removed from a shaft which cannot be penetrated faster than two feet per hour (fifteen minute minimum) using a rock auger with bullet-shaped hardened steel teeth (Kennametal bits or equivalent), and the drilling equipment should have the capacity to produce a continuous torque of at least 1,000,000 inch pounds and a downward force of at least 50,000 pounds (a Xxxxxx LLDH in good working condition) for piers up to seventy two inches in diameter. Use of equipment with greater torque or downward force modifies the definition of refusal to be the point at which the equipment cannot penetrate faster than two feet per hour (fifteen minute minimum). In rare cases, refusal may occur on a rock seam or boulder above the general massive rock surface. The compensation for Caisson Rock should include only material that cannot be penetrated by the rock auger at the specified rate.
Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.
meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya (“Pembeli”) dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. BUTIR-BUTIR HARTANAH : HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan oleh pihak berkuasa. NO. HAKMILIK INDUK / NO. LOT : Geran 203771, Lot 106 Seksyen 3 PEKAN/DAERAH/NEGERI : Pekan Batu Tiga / Petaling / Selangor Darul Ehsan PEGANGAN : Selama-lamanya KELUASAN LANTAI : 93.65 meter persegi (1,008 kaki persegi) PEMAJU : Shanghai Realty (M) Sdn Bhd (350799-U) XXXXXXXX XXX : Xxxxxxxx Xxxxx Bin Xxxxxx BEBANAN : Diserahhak kepada RHB Islamic Bank Berhad (200501003283/680329-V) LOKASI XXX PERIHAL HARTANAH Hartanah tersebut terletak di Pangsapuri Indahria, Xx. 0, Xxxxx Xxxx Xxxx-Xxxxxx Xxxxx, Xxxxx Xxxxxxx, Xxxxxxx 00, 00000 Xxxx Xxxx, Xxxxxxxx Xxxxx Xxxxx. Hartanah tersebut adalah sebuah unit pangsapuri dikenali sebagai Xxxxx Pemaju No. P5-2-11, Tingkat No. 2, Bangunan No. P5, berserta dengan Xxxxx Aksesori No. GRD-07, Pangsapuri Indahria xxx mempunyai alamat surat-menyurat di Unit No. P5-02-11, Pangsapuri Indahria, Xx. 0, Xxxxx Xxxx Xxxx-Xxxxxx Xxxxx, Xxxxx Xxxxxxx, Xxxxxxx 00, 00000 Xxxx Xxxx, Xxxxxxxx Xxxxx Xxxxx. HARGA RIZAB: Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 270,000.00 (RINGGIT MALAYSIA: DUA RATUS XXX TUJUH PULUH RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat- syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Islamic Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx bersama-sama dengan segala cukai jualan xxx perkhidmatan (SST) xxx/atau cukai yang menggantikan SST hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Islamic Bank Berhad melalui XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan T. Rajagopalu & Co. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN T. RAJAGOPALU & CO, Solicitors for Assignee herein whose address is at Xxxxx 0-0, Xxxxxxxx Xxxx Xxxxxx Xxxxx Xxxxx, 00000 Xxxxxxxx Xxxxxx Xxxxxxxx. Tel: 00-0000000 / Fax: 00-0000000 [Ruj: RG/RHB/0339/2023/SYAFIQAH(yusof)], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah. RAJAN AUCTIONEERS SDN. BHD. X. XXXXX Xx.00X,Xxxxxxx Xxxx,Xxxxx Xxxx Xxxxxx, ( Xxxxxxxx Berlesen ) 41000 Klang, Selangor Darul Ehsan. H/P: 000-0000000 Tel: 00-00000000 / Fax : 00-00000000 H/P: 012-2738109 Ruj Kami: RA/RHBI/TRC/NS/4220-24(fz) CONDITIONS OF SALE
HARGA RIZAB Hartanah tersebut akan dijual “Dalam Keadaan Xxxxx Xxx” xxx tertakluk kepada satu harga rizab sebanyak RM669,000.00 (RINGGIT MALAYSIA: ENAM RATUS XXX ENAM PULUH SEMBILAN RIBU SAHAJA) xxx Syarat-syarat Jualan xxx tertakluk kepada kebenaran yang diperolehi oleh Pembeli dari Pemaju/Pemilik Tanah xxx Pihak Berkuasa yang lain, jika ada. DEPOSIT:- Semua penawar yang ingin membuat tawaran dikehendaki mendepositkan kepada Pelelong, sebelum lelongan 10% daripada harga rizab secara BANK DERAF sahaja atas nama BANK KERJASAMA RAKYAT MALAYSIA BERHAD xxx xxxx xxxx xxxxxx hendaklah dijelaskan dalam tempoh Sembilan Xxxxx (00) Hari. Bagi penawar atas talian sila rujuk Terma xxx Syarat serta cara pembayaran deposit di xxx.xxxxxxxxxxxxxxx.xxx KEBENARAN PINDAHMILIK: Harta tersebut akan tertakluk kepada kebenaran pindahmilik diperolehi oleh pembeli berjaya daripada Pemaju xxx/atau mana-mana pihak berkuasa lain (jika berkenaan). Nota: Butir-butir hartanah adalah berdasar Laporan Penilaian xxx perjanjian-perjanjian pembiayaan yang mana berdasarkan pengetahuan kami adalah benar. Walaubagaimanapun pembida hendaklah membuat xxxxxx xxxxx atas hakmilik induk di pejabat tanah xxx/atau pihak berkuasa berkenaan. Perjanjian ini tidak akan menjadi terbatal sekiranya terdapat perbezaan berkenaan butir-butir hartanah Untuk mendapatkan butir-butir selanjutnya, xxxx berhubung dengan Tetuan Suhaimi Yahya & Co Peguamcara bagi Pihak Pemegang Serahhak/Bank di Xx. 0-0, Xxxxx Xxxxxx Xxxxxx 00, Wangsa Link, Xxxxxx Xxxx, 00000 Xxxxx Xxxxxx. (Ruj No. SY/BKRM(PJS)/LIT/010/2021/L) Tel No: 00-00000000, Fax No. 00-00000000, atau Pelelong yang tersebut di bawah ini:- TETUAN ESZAM AUCTIONEER SDN BHD (760902-H) MOHD NIZAM BIN XXXX XXXXXX (P.J.K) Suite B-15-03, Tingkat 15, Blok B, Megan Avenue 2, (Pelelong Berlesen) 00, Xxxxx Xxx Xxxx Xxxx, 50450 Kuala Lumpur TEL NO: 00-0000000, H/P NO: 000-0000000/000-0000000 FAX NO: 00-0000000 E-mail: xxxxxxxxxxxxxxx@xxxxx.xxx Web site : xxx.xxxxxxxxxxxxxxx.xxx Rujukan kami : EZ/LACA/BKRMB/212/2021/MNS/mas CONDITIONS OF SALE
PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $0 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $2,675,745 - OWDA $0 - CDBG $0 - Other $0 SUBTOTAL $2,675,745 v) OPWC Funds: - Loan $299,000 SUBTOTAL $299,000 TOTAL FINANCIAL RESOURCES $2,974,745
Natural Resources Protecting America’s great outdoors and natural resources.