Batch Plant Sample Clauses

Batch Plant. The manufacturing of asphalt or concrete which may include the storage of related component materials.
AutoNDA by SimpleDocs
Batch Plant. Lessee may erect a concrete batch plant and wash down sump on the west or south side of Building #7 in accordance with plans approved by Lessor, such approval not to be unreasonably withheld or delayed. Lessee's plans shall include, but not be limited to, the precise area to be occupied, the design of the structure and final paint color. All construction shall be subject to environmental approvals, governmental approvals and building permits. On the termination of this Lease the Lessee may, and will, if so requested by Lessor, remove the batch plant and restore the area, including parking, to its prior condition. Lessee shall give notice to Lessor at least 30 days prior to the termination of this Lease as to whether or not it elects to remove the batch plant. Within 30 days after receipt of such notice or, if no notice is given, then within 30 days after the termination of this Lease, Lessor may notify Lessee that Lessee is required to remove the said batch plant
Batch Plant. NRMCA Program for Certification of Ready-Mixed Concrete Production Facilities or
Batch Plant. When a batch type plant is used, add the aramid product dosage to the aggregate in the weigh xxxxxx. This may be done with loose fibers and a fiber metering device, or may be done by using manual dosing equipment. If necessary, increase the batch dry mixing time to ensure the aramid fibers are uniformly distributed prior to the injection of asphalt cement into the mixer.
Batch Plant. Feed treated aramid with automated dosing machine operated by a certified QA/QC mixing technician, directly into the weigh xxxxxx. HMA/WMA batch dry mix times will need to be 20 seconds minimum to ensure proper aramid distribution. Metering shall be based on batch size (tons) and dosage rate (oz/ton). Feeding shall occur in a constant stream-like manner as the heated aggregate is added to the weigh xxxxxx. If necessary, increase the mixing time with heated aggregates to ensure the aramid fibers are uniformly distributed.
Batch Plant. Modify the batch plant to measure the mass (weight) of the RAP and/ or RAS before adding it into the pug mill. Design the cold- feed bin (s), conveyor system (s), charging chute (s), and all special bins to prevent RAP and/ or RAS from segregating and sticking. Dry the virgin aggregate and RAM and then heat the virgin aggregate and RAM to a temperature that, after adding RAP and/or RAS, produces a completed mixture within the temperatures specified in Table A for the class and type of material used. Ensure that virgin aggregate is free of unburned fuel oil when delivered to the pug mill.
Batch Plant. Section 409.3(c)1 and add the following: Dry the aggregate (s) according to the specific recommendations and direction from the WMA Technology Technical Representative and heat to a suitable temperature so that the resulting completed mixture temperature is within the mixture temperature range established in the Producer QC Plan and recommended or directed by the WMA Technology Technical Representative or manufacturer and that is within the master minimum and maximum temperature range in Table A within this specification. Ensure that the aggregate is free of unburned fuel oil when delivered to the pug mill.
AutoNDA by SimpleDocs
Batch Plant. 6 13.2.2 Rail Line ....................................................6 13.2.3

Related to Batch Plant

  • Production Work The Company may use Outside Entities to perform production work outside the plant and its environs provided the Company demonstrates that it is utilizing plant equipment to the maximum extent consistent with equipment capability and customer requirements and the Company is making necessary capital investments to remain competitive in the steel business and is in compliance with Article Eleven, Section B (Investment Commitment).

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Manufacturing Services Jabil will manufacture the Product in accordance with the Specifications and any applicable Build Schedules. Jabil will reply to each proposed Build Schedule that is submitted in accordance with the terms of this Agreement by notifying Company of its acceptance or rejection within three (3) business days of receipt of any proposed Build Schedule. In the event of Jabil’s rejection of a proposed Build Schedule, Jabil’s notice of rejection will specify the basis for such rejection. When requested by Company, and subject to appropriate fee and cost adjustments, Jabil will provide Additional Services for existing or future Product manufactured by Jabil. Company shall be solely responsible for the sufficiency and adequacy of the Specifications [***].

  • Acceptance Testing At the time of installation of a LIS trunk group, and at no additional charge, acceptance tests will be performed to ensure that the service is operational and meets the applicable technical parameters.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Commissioning Commissioning tests of the Interconnection Customer's installed equipment shall be performed pursuant to applicable codes and standards. If the Interconnection Customer is not proceeding under Section 2.3.2, the Utility must be given at least ten (10) Business Days written notice, or as otherwise mutually agreed to by the Parties, of the tests and may be present to witness the commissioning tests.

  • Project Plan Development of Project Plan Upon the Authorized User’s request, the Contractor must develop a Project Plan. This Project Plan may include Implementation personnel, installation timeframes, escalation procedures and an acceptance plan as appropriate for the Services requested. Specific requirements of the plan will be defined in the RFQ. In response to the RFQ, the Contractor must agree to furnish all labor and supervision necessary to successfully perform Services procured from this Lot. Project Plan Document The Contractor will provide to the Authorized User, a Project Plan that may contain the following items: • Name of the Project Manager, Contact Phone Numbers and E-Mail Address; • Names of the Project Team Members, Contact Phone Numbers and E-Mail Address; • A list of Implementation milestones based on the Authorized User’s desired installation date; • A list of responsibilities of the Authorized User during system Implementation; • A list of designated Contractor Authorized Personnel; • Escalation procedures including management personnel contact numbers; • Full and complete documentation of all Implementation work; • Samples of knowledge transfer documentation; and • When applicable, a list of all materials and supplies required to complete the Implementation described in the RFQ. Materials and Supplies Required to Complete Implementation In the event that there are items required to complete an Implementation, the Contractor may request the items be added to its Contract if the items meet the scope of the Contract. Negotiation of Final Project Plan If the Authorized User chooses to require a full Project Plan, the State further reserves the right for Authorized Users to negotiate the final Project Plan with the apparent RFQ awardee. Such negotiation must not substantively change the scope of the RFQ plan, but can alter timeframes or other incidental factors of the final Project Plan. The Authorized User will provide the Contractor a minimum of five (5) business days’ notice of the final negotiation date. The Authorized User reserves the right to move to the next responsible and responsive bidder if Contractor negotiations are unsuccessful.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Product Specifications The Company agrees that all Products sold to Xxxx hereunder shall conform to the respective specifications set forth on Schedule A or to such other specifications as are from time to time agreed upon by the Parties.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.