Bids Exceeding Cost Estimate Sample Clauses

Bids Exceeding Cost Estimate. If all bids exceed Consulting Engineer/Architect's Final Cost Estimate, Consulting Engineer/Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Engineer/Architect's estimate. The City may: (1) give written approval of an increase in the Project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the Project; (3) terminate the Project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the Construction Cost. In the case of (4), Consulting Engineer/Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Consulting Engineer/Architect's Estimate.
AutoNDA by SimpleDocs
Bids Exceeding Cost Estimate. If all bids exceed Consulting Engineer/Architect's Final Cost Estimate, Consulting Engineer/Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Engineer/Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or
Bids Exceeding Cost Estimate. If all bids exceed Consultant's Final Cost Estimate, Consultant, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. City has four (4) options if all bids exceed Consultant's estimate. City may: (1) give written approval of an increase in the Project cost up to a maximum of 7% above the authorized total; (2) authorize rebidding of the Project; (3) terminate the Project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost.
Bids Exceeding Cost Estimate. If all bids exceed Consulting Architect's Final Cost Estimate, Consulting Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Consulting Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost. In the case of (4), Consulting Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Consulting Architect's estimate.
Bids Exceeding Cost Estimate. If all bids exceed Final Cost Estimate, Golf Course Designer, Engineer and Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four
Bids Exceeding Cost Estimate. If all bids exceed Golf Course Architect's Final Cost Estimate, Golf Course Architect, at the request of City and for no additional cost, will prepare a report for City identifying why all the bids exceed the estimate. The City has four (4) options if all bids exceed Golf Course Architect's estimate. The City may: (1) give written approval of an increase in the project cost up to a maximum of 7% of the authorized total; (2) authorize rebidding of the project; (3) terminate the project and this Agreement; or (4) cooperate in revising the Project scope or specifications, or both, as necessary to reduce the construction cost. In the case of (4), Golf Course Architect, without additional charge to City, shall consult with City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the Golf Course Architect's estimate.

Related to Bids Exceeding Cost Estimate

  • Cost Estimate The cost estimate shall set out the estimated costs for the proposed Change Order in such a way that a fair evaluation can be made. It shall include a breakdown for labor, materials, equipment and markups for overhead and profit, unless TxDOT agrees otherwise. If the work is to be performed by Subcontractors and if the work is sufficiently defined to obtain Subcontractor quotes, DB Contractor shall obtain quotes (with breakdowns showing cost of labor, materials, equipment and markups for overhead and profit) on the Subcontractor’s stationery and shall include such quotes as back-up for DB Contractor’s estimate. No markup shall be allowed in excess of the amounts allowed under Section 10.6. DB Contractor shall identify all conditions with respect to prices or other aspects of the cost estimate, such as pricing contingent on firm orders being made by a certain date or the occurrence or non-occurrence of an event.

  • Cost Estimating The Model may be used to develop cost estimates based on the approximate data provided and conceptual estimating techniques (e.g., volume and quantity of elements or type of system selected).

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Project Cost a. The estimated cost of the Project is $6,000,000.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", Schedule of Financial Assistance, attached and incorporated in this Agreement. The Schedule of Financial Assistance may be modified by execution of an amendment of the Agreement by the Parties.