Boardwalks Sample Clauses

Boardwalks. Design will be in conjunction with Parks & Gardens staff and as per New Zealand standard SNZ HB 8630:2004 Tracks & Outdoor Visitor Structures, the building code and Parks and Gardens track maintenance and upgrade manual v1.1 (see drawings 06/113-05 and 06/113-06. Boardwalks are to be either 900mm or 1200mm wide depending on the situation. Schedule 5‌ Indicative Quantities (estimate only)‌ Quantity RESERVE 1 - Lower Stebbings stream Track from new road to GW dam 506 m Footbridges - where required 3 # Reveg - Northern end, spec b 9801 m sq RESERVE 2 - The xxxxx and reservoir area Track to walking spec up to the xxxxx. 238 m Native plant buffer (specification a) 10m wide adjoining northern residential allotments. 1900 m sq Native revegetation (spec b), xxxxxx to the south and below the reservoir. 8308 m sq RESERVE 3 - Western tributaries Native revegetation (specification b) 5m wide on each side of the 2 streams. 6380 m sq Farm fencing protecting the riparian revegetation from stock 500 m RESERVE 4 - The middle ridge Native plant buffer (spec a) 10m wide adjoining residential allotments. 23240 m sq Native revegetation (specification c) 5m or greater on each side of ephemeral streams and adjacent wet or damp areas. 2354 m sq Track to walking specification located between the formed access points 572 m RESERVE 5 - Middle Stebbings stream Native revegetation (specification b) of the whole xxxxxx up to residential boundaries. 32478 m sq Tracks (walking specification) located along length of reserve. Exact layout to be determined. 2500 m Footbridges as required by final track layout. 2 # 3 carparks located at the south western end. 3 # 3 Carparks located at the access point under the pylons. 3 # Medium sized playground & equipment located at the north eastern end of the reserve. 1 # Flat playing field 180 m sq Concrete footpath from road to play equipment 25 m RESERVE 6 - Xxxxxxxx Xxxxx Native revegetation (specification b) 10 m wide planted on south side of first order stream. 4430 m sq Track (walking track specification) up the south side of the first order stream if feasible. 1517 m Track (walking track specification) along the top. 1116 m Native plant buffer (specification a) 10m wide adjoining residential allotments 773 m sq 3 car parks to be constructed near the future water reservoir for visitors to Xxxxxxxx Xxxxx. 3 # Native revegetation (specification b) of between the 3 main remnants to create a continuous band (ecological corridor). In time this will be...
AutoNDA by SimpleDocs

Related to Boardwalks

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason:

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Stormwater Notwithstanding any other provisions or terms of this Agreement, Company acknowledges that certain properties within the Premises or on Authority-owned land are subject to stormwater rules and regulations. Company agrees to observe and abide by such stormwater rules and regulations as may be applicable to the Premises, and, if applicable, Company hereby expressly covenants, warrants, and represents to Authority, in connection with Company’s operations on the Premises, the following:

  • WTO GPA DR-CAFTA. —NAFTA. —U.S.-Australia FTA. —U.S.-Bahrain FTA. —U.S.-Chile FTA. —U.S.-Morocco FTA. —U.S.-Oman FTA. —U.S.-Peru TPA. —U.S.-Singapore FTA. —

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Mobile Gas Service Corp 350 U.S. 332 (1956) and Federal Power Commission v. Sierra Pacific Power Co., 350 U.S. 348 (1956) , and clarified by Xxxxxx Xxxxxxx Capital Group, Inc. v.

  • Sub-Loop In locations where SBC-AMERITECH has deployed: (1) Digital Loop Carrier systems and an uninterrupted copper loop is replaced with a fiber segment or shared copper in the distribution section of the loop; (2) Digital Added Main Line (“DAML”) technology to derive multiple voice-grade POTS circuits from a single copper pair; or (3) entirely fiber optic facilities to the end user, SBC-AMERITECH will make the following options available to CLEC:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!