BOND STONE Sample Clauses

BOND STONE. 5.2.1. Provisions in SSR regarding bond stone shall not be applicable for Porbandar stone masonry except in random rubble stone masonry where bond stone shall be provided as specified in SSR. Plain cement concrete bond stone as specified in par 6.8.17 of SSR may be used in lieu of bond stones (through stone). In the event deviation, masonry shall be priced at appropriate rate given in SSR Part-II considering Special Conditions 6.8.7 of MES schedule Part-II and contractor’s percentage. Quoins and jambs where required may be in pre cast PCC blocks (PCC 1:3:6 type C1).
AutoNDA by SimpleDocs

Related to BOND STONE

  • Per-pupil Funding The School's non-facility general fund per-pupil funding shall be as defined in Sec. 302D-28, HRS. The Commission shall distribute the School's per-pupil allocation each fiscal year pursuant to Sec. 302D-28(f), HRS, and shall provide the School with the calculations used to determine the per-pupil amount each year. All funds distributed to the School from the Commission shall be used solely for the School's educational purposes as appropriated by the Legislature, and the School shall have discretion to determine how such funding shall be allocated at the school level to serve those purposes subject to applicable laws and this Contract.

  • REPLACEMENT OF NOTES, COUPONS AND TALONS Should any Note, Coupon or Talon be lost, stolen, mutilated, defaced or destroyed, it may be replaced at the specified office of the Agent upon payment by the claimant of such costs and expenses as may be incurred in connection therewith and on such terms as to evidence and indemnity as the Issuer may reasonably require. Mutilated or defaced Notes, Coupons or Talons must be surrendered before replacements will be issued.

  • Use of State Facilities Resources and Equipment a. Meeting Space and Facilities. The Employer’s campuses and facilities may be used by the Union to hold meetings subject to the University’s policy and availability of the space. The Employer may provide private space for stewards and/or Union representatives to meet in confidence with those they represent on a space available basis. Staff representatives may reserve and utilize meeting rooms in accordance with University policy and procedure. Such requests will be subject to availability and all applicable fees.

  • Mass Rock Mass rock is defined as any material that cannot be ripped with a single- tooth hydraulic ripper drawn by a crawler tractor having a minimum draw bar pull rated at not less than 56,000 pounds (Caterpillar D-8K or equivalent) and occupies an original volume of at least one cubic yard.

  • Provision of Interconnection Financial Security The Interconnection Customer is obligated to provide all necessary Interconnection Financial Security required under Section 11 of the GIDAP in a manner acceptable under Section 11 of the GIDAP. Failure by the Interconnection Customer to timely satisfy the GIDAP’s requirements for the provision of Interconnection Financial Security shall be deemed a breach of this Agreement and a condition of Default of this Agreement.

  • Project Funding 8.1 The Project Funding for completion of this PFA is as follows:

  • Caisson Rock Caisson Rock is defined as material that must be removed from a shaft which cannot be penetrated faster than two feet per hour (fifteen minute minimum) using a rock auger with bullet-shaped hardened steel teeth (Kennametal bits or equivalent), and the drilling equipment should have the capacity to produce a continuous torque of at least 1,000,000 inch pounds and a downward force of at least 50,000 pounds (a Xxxxxx LLDH in good working condition) for piers up to seventy two inches in diameter. Use of equipment with greater torque or downward force modifies the definition of refusal to be the point at which the equipment cannot penetrate faster than two feet per hour (fifteen minute minimum). In rare cases, refusal may occur on a rock seam or boulder above the general massive rock surface. The compensation for Caisson Rock should include only material that cannot be penetrated by the rock auger at the specified rate.

  • Water Resources Four (4) Union Stewards unless the unit falls below sixty (60) employees and then not more than two (2) Union Stewards.

  • Construction Documents Phase Services 3.4.1 Based on the Owner’s approval of the Design Development Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Construction Documents for the Owner’s approval. The Construction Documents shall illustrate and describe the further development of the approved Design Development Documents and shall consist of Drawings and Specifications setting forth in detail the quality levels and performance criteria of materials and systems and other requirements for the construction of the Work. The Owner and Architect acknowledge that, in order to perform the Work, the Contractor will provide additional information, including Shop Drawings, Product Data, Samples and other similar submittals, which the Architect shall review in accordance with Section 3.6.4.

  • Project Financing B.1. The Foundation hereby agrees to fund, by Conditional Grant, the implementation of the Proposal in the maximum sum of $ or 50% of the actual expenditures on the Project, as contemplated in the Approved Project Budget, whichever is less, and at the times and as may otherwise be set forth in Annex B hereto.