Borehole Siting Sample Clauses

Borehole Siting. This activity entails the scientific search for and location of a drilling target that is assessed to have the greatest chance for success. The responsibility for this task must fall to a team of qualified and experienced personnel in the service of the Executive Agency. This team must be capable of successfully integrating the earth sciences of geophysics, geology, and Geo-hydrology. The undertaking of geophysical survey using the electrical method and/or magnetic method. A geophysical survey to be carried out by a Geo-hydrologist within the main reservoir boundaries to determine the drilling exact locations of the production borehole: • A survey layout to set (direction, length, and station spacing). • Magnetic or electrical resistivity readings are to be recorded along each selected traverse. Geophysical results to be processed to obtain 2D dimensional pseudo-sections. Pseudo-sections to be interpreted to understand the local lithostratigraphy setting and groundwater potential, From the interpretation, a more suitable drilling position might be determined.
AutoNDA by SimpleDocs

Related to Borehole Siting

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Wastewater i.e. wastewater and storm water collection, treatment and management systems.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Irrigation The City shall provide water to the Premises for the purpose of irrigating the facility. The City specifically reserves the right to restrict water usage under this Agreement if water restrictions are placed on other water users within the City. Prior to the start of the season, City will provide charge up and run through the automatic irrigation systems to check for proper operation. City will provide Lessee with a radio for remote operation of the irrigation system, which Lessee shall use for the day to day maintenance, repair, and monitoring of the irrigation system. If the radio is lost, stolen, broken, or is rendered unusable, Lessee shall pay $1500 for the replacement radio. City is responsible for the maintenance and repair of the following irrigation elements, to the extent applicable: curb stops, backflow prevention devices, backflow enclosures, main line pipings, electric control valves, and controllers. Lessee shall notify Parks Division Water managers by email if any of these irrigation elements are malfunctioning or broken.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Dry Cleaning Timpson have over 520 dry cleaning stores and are now the UK’s biggest family-run dry cleaner. We process and clean up to 40,000 garments per week and have 32 Dry Cleaning production sites located around the UK. 19 of these sites are Timpson Super Hubs and act as satellite production centres. We offer customers a next day service on everyday items and quality check each garment before it leaves production. Dry Cleaning by Timpson See prices, opening times and more about dry cleaning and laundry services in , . From £2 per item. : Dry cleaning & laundry services DLS have the expertise to advise, design, supply, install & maintain your professional laundry equipment

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Project Site The “Project Site” is the place where the Work is being carried on.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

Time is Money Join Law Insider Premium to draft better contracts faster.