Fill, Backfill and Landscaping Sample Clauses

Fill, Backfill and Landscaping. No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.
AutoNDA by SimpleDocs
Fill, Backfill and Landscaping. No soil found on site, or transported to the site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil. Responsibility and Warranty of Trade Contractors, Trade Suppliers, and Subcontractors. Products that are specified by reference standards or in descriptive manner without a manufacturer’s name, model number or trade name, to be selected by the CM/GC, shall not contain Hazardous Materials in any form, except as and to the extent permitted in 1.6.1, above, and 1.6.3, below. The CM/GC shall require that each of his subcontractors and material suppliers warrants to the Owner and Design Professional that all materials, products and assemblies, other than those which specifically and expressly required by the Contract Documents, incorporated, or submitted for incorporation into this Project, are free of Hazardous Materials. This warranty shall also include all materials, components, and accessories not specifically enumerated or detailed in the Contract Documents but which are required by performance specifications or recommended by manufacturers for complete installation of materials, products and assemblies.

Related to Fill, Backfill and Landscaping

  • Landscaping The Owner will, before its plan of subdivision is released for registration, pay to the Town in lieu of planting any trees on the public streets within the plan, the amount shown for the purpose upon Schedule “J”.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 15-A, PR-8, PR-15, PR-35 and PR-50:

  • Landscape Develop and coordinate landscape design concepts entailing analysis of existing conditions, proposed components and how the occupants will use the facility. Include location and description of planting, ground improvements and visual barriers.

  • PAVING Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all platted control irons (set or not), including plat boundary irons, for the entire sub-division, not just the current phase ▪ benchmarks, including TBM set with preliminary survey In addition to the required coordinate information, the following shall be included in all plans, at a minimum, as needed for construction staking on all City projects. ▪ Include copy of plat(s) on all plans, as relevant and approved by the Design Engineer ▪ Benchmarks – minimum of two City standards, four total desirable; as close to project as possible, even if TBM set with preliminary survey. ▪ Benchmark elevations must be in the same datum as the design (i.e. NAV 88 design needs NAV 88 benchmarks, not NAV 29) ▪ All control irons/identified property irons shall be shown on plans, with BL stationing and offset ▪ Show deflection angles in BL, and/or bearing/azimuth of BL sections ▪ Arterial project side streets – provide BL station at CL of intersection of the two streets, on the BL; BL station and offset to CL of side street at removal limits; include deflection angle from BL to CL of side street ▪ Existing FL/pavement grades shown at all match points ▪ Top of curb grades and stationing at all ends-of-return and horizontal/vertical P.I.’s, not just even stationing ▪ CL top of pavement grades for arterial ▪ CL elevation for streets on mass grading work @ 100’ Sta in tangent sections and 50’ on curves.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Excavation If an excavation shall be made upon land adjacent to the Leased Premises, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter upon the Leased Premises for the purpose of doing such work as said person shall deem necessary to preserve the wall or the building of which the Leased Premises form a part from injury or damage and to support the same by proper foundation, without any claim for damages or indemnity from Landlord, or diminution or abatement of Rent.

  • Cheating Cheating is prohibited, and will result in immediate action and termination without compensation.

  • Drainage ▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands. ▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended. ▪ Maintain headwalls to the road shoulder level with material that will resist erosion. ▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock. ▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended. ▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity. Preventative Maintenance ▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.