Common use of Bridge Layout Clause in Contracts

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

AutoNDA by SimpleDocs

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of DocuSign Envelope ID: 8F4C5F80-CEA4-4B7A-AA13-EF50310E0F8C each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: E6A69BC8-1AF8-478D-A598-06F4CAE4CFA7 clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: 7E35C160-7769-4E34-87BF-0A3AF65FF97E clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: B36C3E7B-D32F-4D07-94E4-B8954C8506B4 clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: 4EB23D04-0FA8-470B-A4D7-463E9090543B clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: E767BC6F-115E-4461-9416-A68BBF4757F6 clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

AutoNDA by SimpleDocs

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of DocuSign Envelope ID: CB7B82B2-FA3B-4DDD-957A-C5AE0E5F436A each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: A17636F5-01D8-4DFA-AD46-30101F4B392A clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical DocuSign Envelope ID: F274686F-85C9-4CBD-A478-F69018DCE295 clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: sb20pca.txdot.gov

Bridge Layout. The Engineer shall prepare a bridge layout plan sheet for each bridge and bridge class culvert. The Engineer shall determine the location of DocuSign Envelope ID: 981599F8-5D6E-41E6-ADFA-1DA0DC55F35E each soil boring needed for foundation design in accordance with the Geotechnical Manual. Prior to preparation of each bridge layout, the Engineer shall prepare a comparative cost analysis of bridge structures to determine: (1) the optimum bridge beams for vertical clearance over railroads, roadway, or waterways, (2) the optimum bridge structure versus roadway embankment, pavement, soil stabilization, and retaining walls, and (3) to determine optimum in bridge beams for the direct connectors. DocuSign Envelope ID: DE976FF4-2D56-4B5B-B430-D8ABBAC3EC05 The Engineer shall submit a 3D model (if applicable) and bridge layout for each structure early in the plan preparation process to obtain approval from the State. The Engineer shall comply with all relevant sections of the latest edition of the State’s LRFD Bridge Design Manual, Bridge Project Development Manual, Bridge Detailing Guide, and AASHTO LRFD Bridge Design Specifications and respective checklists. Each bridge layout sheet must include bridge typical sections, structural dimensions, abutment and bent locations, superstructure and substructure types. The Engineer shall locate and plot all soil borings and utilities, show proposed retaining walls, and, for staged construction, indicate limits of existing bridge for removal and reconstruction.

Appears in 1 contract

Samples: Attachment E – Fee

Time is Money Join Law Insider Premium to draft better contracts faster.