Specifications and General Notes. The Engineer shall identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. The Engineer shall prepare General Notes from the District’s Master List of General Notes, Special Specifications and Special Provisions for inclusion in the plans and bidding documents. The Engineer shall provide General Notes, Special Specifications and Special Provisions in the required format.
Specifications and General Notes. The Engineer shall review the standard specifications, special specifications, special provisions, general notes and the appropriate reference items provided to them by the State. The Engineer will provide any additional special specifications and special provisions to be approved by the State.
Specifications and General Notes. The ENGINEER will identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. The ENGINEER will prepare General Notes from the District’s Master List of General Notes, Special Specifications and Special Provisions for inclusion in the plans and bidding documents. The ENGINEER will provide General Notes, Special Specifications and Special Provisions in the required format. The ENGINEER will provide the following PS&E Forms: FORM 1002, and FORM 1814 (if applicable).
Specifications and General Notes. The Engineer shall identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. The Engineer shall prepare general notes, special specifications and special provisions for inclusion in the plans and bidding documents. SH 99 Project improvements consist of design of 1 mile of 2-lane curb and gutter for Southbound frontage between Westheimer Parkway and Fry Road for bridges over 2 channel crossings. The work to be performed by the Engineer under this scope of work consists of providing Structural Bridge design for a 300-ft and 200-ft and a 40-ft wide straight crossing.
Specifications and General Notes. The Engineer shall identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. The Engineer shall prepare General Notes from the State District’s Master List of General Notes, Special Specifications and Special Provisions for inclusion in the plans and bidding documents. The Engineer shall provide General Notes, Special Specifications and Special Provisions in the required format. DocuSign Envelope ID: CCC15E4F-025E-45ED-8647-4B6C2DCF3710
Specifications and General Notes. 163.9 Include additional specifications and general notes for the added auxiliary lane and revision to the 51st exit ramp
Specifications and General Notes. Identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. Prepare General Notes from the District’s Master List of General Notes, Special Specifications and Special Provisions for inclusion in the plans and bidding documents. Provide General Notes, Special Specifications and Special Provisions in the required format.
Specifications and General Notes. The Consultant shall identify and prepare necessary standard specifications, special specifications, specialprovisions and the appropriate reference items for inclusion in the construction manual, plans and pertinent bidding documents. Deliverables: Special provisions to standard specifications, special specifications and general notes in Word (withtracked changes on) and electronic .pdf format
Specifications and General Notes. The ENGINEER will provide all relevant project specification and general notes to the project construction activities.
Specifications and General Notes. The Engineer shall identify necessary standard specifications, special specifications, special provisions and the appropriate reference items. The Engineer shall prepare General Notes from the District’s Master List of General Notes, Special Specifications and Special Provisions for inclusion in the plans and bidding documents. The Engineer shall provide General Notes, Special Specifications and Special Provisions in the required format. DocuSign Envelope ID: 679175E2-1976-4615-BA79-40AD36929E37 The Engineer shall perform constructability reviews at major project design milestones (e.g. 30%, 60%, 90%, and final plan) to identify potential constructability issues and options that would provide substantial time savings during construction. The constructability review must be performed for all roadway and structural elements such as Sequence of Work/Traffic Control, Drainage (Temporary and Permanent), Storm Water Pollution Prevention Plan (SW3P), Environmental Permits, Issues and Commitments (EPIC) addressed, identify Utility conflicts; ensuring accuracy and appropriate use of Items, Quantities, General Notes, Standard and Special Specifications, Special Provisions, Contract Time/Schedule, Standards; and providing detailed comments in an approved format. Reviews must be captured in a Constructability Log identifying areas of concern and potential conflict. The Engineer shall provide the results of all Constructability reviews and recommendations to the State at major project design milestone submittals.