Burden ofProof Sample Clauses

Burden ofProof. In the event the Parties are unable to agree in good faith that a Force Majeure Act has occurred; the Parties shall resolve the dispute in accordance with the provisions of this Agreement. The burden of proof as to whether a Force Majeure Act has occurred shall be upon the Party claiming the occurrence or existence of such Force Majeure Act.
AutoNDA by SimpleDocs
Burden ofProof. 28 11.4 Duties of the Parties~ ......................................................................................................... 29 11.5 Liabilities .......................................................................................................................... 29

Related to Burden ofProof

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Prohibition Against Selecting and Installing Products Containing Hazardous Materials The Contractor shall not select, install or otherwise incorporate any products or materials containing Hazardous Materials within the boundaries of the Site. Should the Contractor or any Subcontractors have knowledge that, or believe that, an item, component, material, substance, or accessory within a product or assembly selected by the Contractor or any Subcontractor may contain Hazardous Materials it is the Contractor’s responsibility to secure a written certification from the manufacturer of any suspected material which identifies the specific Hazardous Material(s) contained, together with the Material Safety Data Sheets (MSDS) for such materials which shall be submitted to the Owner and Design Professional.

  • Tuberculosis Examination The examination shall consist of an approved intradermal tuberculosis test, which, if positive, shall be followed by an X-ray of the lungs. Nothing in Sections 5163 to 5163.2, inclusive, shall prevent the governing body of any city or county, upon recommendation of the local health officer, from establishing a rule requiring a more extensive or more frequent examination than required by Section 5163 and this section. § 5163.2. Technician taking X-ray film; Interpretation of X-ray The X-ray film may be taken by a competent and qualified X-ray technician if the X-ray film is subsequently interpreted by a licensed physician and surgeon.

  • Obligation to Notify Owner of Existing Hazardous Materials The Contractor shall immediately notify the Owner and the Design Professional, both orally and in writing, of the presence and location of any physical evidence of, or information regarding the presence of Hazardous Materials at the Site of which it becomes aware. If the Contractor encounters Hazardous Materials on the Site the Contractor shall (i) immediately stop performance of Work or that portion of the Work affected by or affecting such Hazardous Materials; (ii) secure the contaminated area against intrusion; (iii) not disturb or remove the Hazardous Materials; (iv) not proceed, or allow any subcontractor or supplier to proceed, with any Work or other activities in the area affected by such Hazardous Materials until such materials have been properly remediated and until directed in writing to do so by the Owner; and, (v) take any other steps necessary to protect life and health and the surrounding environment. The Contractor shall be entitled to adjustment of the Contract Time and the Contract Sum pursuant to Section 5, Part 2 of these General Conditions in order to compensate for the impact of any required demolition, re-work, shutdown, delay, protection of work, disruption, and start-up resulting from the encountering of such Hazardous Materials on the Site for which the Contractor is not responsible.

  • Searchability Offering searchability capabilities on the Directory Services is optional but if offered by the Registry Operator it shall comply with the specification described in this section.

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Teaching Staff Assigned to More Than One Building Each Educator who is assigned to more than one building will be evaluated by the appropriate administrator where the individual is assigned most of the time. The principal of each building in which the Educator serves must review and sign the evaluation, and may add written comments. In cases where there is no predominate assignment, the superintendent will determine who the primary evaluator will be.

  • Compliance Investigations Upon City’s request, Contractor agrees to provide to City, within sixty calendar days, a truthful and complete list of the names of all subcontractors, vendors, and suppliers that Contractor has used in the past five years on any of its contracts that were undertaken within San Diego County, including the total dollar amount paid by Contractor for each subcontract or supply contract. Contractor further agrees to fully cooperate in any investigation conducted by City pursuant to City's Nondiscrimination in Contracting Ordinance. Contractor understands and agrees that violation of this clause shall be considered a material breach of the Contract and may result in Contract termination, debarment, and other sanctions.

  • Criminal Background Investigations For investigative Vendor Staff, Citizens will accept a copy of a current Class C Private Investigator license as proof that a criminal background check has been conducted for that investigator. For all other Vendor Staff, Vendor must provide Citizens with a copy of a criminal background check performed on such Vendor Staff dated within thirty (30) days of submission of the Vendor Staff to Citizens for qualification and credentialing review. Vendor shall use Exhibit D, Applicant Background Review Guide to as a guideline to determine eligibility of Vendor Staff to perform Services. The criminal background check must be updated every two (2) years thereafter. All background checks will be at Vendor’s expense and, unless otherwise approved in writing by Citizens’ Contract Manager, shall include but not be limited to: (a) state and federal felony convictions or pending adjudications; (b) state and federal misdemeanor convictions or pending adjudications; (c) any crimes in violation of the Violent Crime Control and Law Enforcement Act of 1995 or pending adjudications; and, (d) a seven (7) year minimum timeframe, extending as close as practicable to the date of Assignment to perform Services. Vendor will advise Citizens’ Contract Manager or designee if it knows of any Vendor Staff that has a criminal conviction (misdemeanor or felony), regardless of adjudication (adjudication withheld, a plea of guilty or nolo contendere, or a guilty verdict), within the last ten (10) years in any jurisdiction. Vendor shall not allow that individual to act as a Vendor Staff until Vendor determines whether that individual should be allowed to do so considering (a) the nature and gravity of the offense; (b) the amount of time that lapsed since the offense;

Time is Money Join Law Insider Premium to draft better contracts faster.