By Direct Scan Sample Clauses

By Direct Scan. After WorldCard Team is launched, you may place the business card into the scanner with the side to be scanned facing up. The card will be drawn in while the light is flashing and the scanned image will gradually appear on the lower right-hand corner of the screen. The recognition results will be shown in the contact list on the main screen. When the light stops flashing, you may scan the other side of the card or just click [Skip Back] to proceed with the next card.
AutoNDA by SimpleDocs

Related to By Direct Scan

  • By Microsoft Microsoft will defend Customer against any third-party claim to the extent it alleges that a Product or Fix made available by Microsoft for a fee and used within the scope of the license granted under this agreement (unmodified from the form provided by Microsoft and not combined with anything else), misappropriates a trade secret or directly infringes a patent, copyright, trademark or other proprietary right of a third party. If Microsoft is unable to resolve a claim of infringement under commercially reasonable terms, it may, as its option, either: (1) modify or replace the Product or fix with a functional equivalent; or (2) terminate Customer’s license and refund any prepaid license fees (less depreciation on a five-year, straight-line basis) for perpetual licenses and any amount paid for Online Services for any usage period after the termination date. Microsoft will not be liable for any claims or damages due to Customer’s continued use of a Product or Fix after being notified to stop due to a third- party claim.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Performance Tests Contractor shall perform Performance Tests in accordance with Section 11.2 of the Agreement and Attachment S.

  • Staffing Plan The Board and the Association agree that optimum class size is an important aspect of the effective educational program. The Polk County School Staffing Plan shall be constructed each year according to the procedures set forth in Board Policy and, upon adoption, shall become Board Policy.

  • Performance Testing 7.2.1 The Design-Builder shall direct and supervise the tests and, if necessary, the retests of the Plant using Design-Builder’s supervisory personnel and the Air Emissions Tester shall conduct the air emissions test, in each case, in accordance with the testing procedures set forth in Exhibit A (the “Performance Tests”), to demonstrate, at a minimum, compliance with the Performance Guarantee Criteria. Owner is responsible for obtaining Air Emissions Tester and for ensuring Air Emissions Tester’s timely performance. Design-Builder shall cooperate with the Air Emissions Tester to facilitate performance of all air emissions tests. Design-Builder shall not be held responsible for the actions of Owner’s employees and third parties involved in the Performance Testing, including but not limited to Air Emissions Tester. 7.2.2 No later than thirty (30) Days prior to the earlier of the Scheduled Substantial Completion Date or Substantial Completion, Design-Builder shall provide to Owner for review a detailed testing plan for the Performance Tests (other than for air emissions). Owner and Design-Builder shall agree upon a testing plan that shall be consistent with the Performance Test Protocol contained in Exhibit A hereto. After such agreement has been reached, Design-Builder shall notify the Owner five (5) business days prior to the date Design-Builder intends to commence the Performance Tests and shall notify the Owner upon commencement of the Performance Tests. Owner and Independent Engineer each have the right to witness all testing, including the Performance Tests and any equipment testing, whether at the Site or at the Subcontractor’s or equipment supplier’s premises during the course of this Agreement. Notwithstanding the foregoing sentence, Owner shall bear the costs of providing a witness to any such testing and all such witnesses shall comply at all times with Design-Builder’s, Subcontractor’s or equipment supplier’s safety and security procedures and other reasonable requirements, and otherwise conduct themselves in a manner that does not interfere with Design-Builder’s, Subcontractor’s or equipment supplier’s activities or operations. 7.2.3 Design-Builder shall provide to Owner a Performance Test report (excluding results from air emissions testing), including all applicable test data, calculations and certificates indicating the results of the Performance Tests and, within five (5) business days of Owner’s receipt of such results, Owner, Independent Engineer and Design-Builder will jointly inspect such Work and review the results of the Performance Tests to verify that the Performance Guarantee Criteria have been met. If Owner or Independent Engineer reasonably determines that the Performance Guarantee Criteria have not been met, Owner shall notify Design-Builder the reasons why Owner determined that the Performance Guarantee Criteria have not been met and Design-Builder shall promptly take such action or perform such additional work as will achieve the Performance Guarantee Criteria and shall issue to the Owner another notice in accordance with Section 7.2.2; provided however that if the notice relates to a retest, the notice may be provided no less than two (2) business days prior to the Performance Tests. Such procedure shall be repeated as necessary until Owner and Independent Engineer verifies that the Performance Guarantee Criteria have been met. 7.2.4 If Owner, for whatever reason, prevents Design-Builder from demonstrating the Performance Guarantee Criteria within thirty (30) Days of Design-Builder’s notice that the Plant is ready for Performance Testing, then Design-Builder shall be excused from demonstrating compliance with the Performance Guarantee Criteria during such period of time that Design-Builder is prevented from demonstrating compliance with the Performance Guarantee Criteria; provided however that Design-Builder will be deemed to have fulfilled all of its obligations to demonstrate that the Plant meets the Performance Guarantee Criteria should such period of time during which Design-Builder is prevented from demonstrating the Performance Criteria exceed thirty (30) Days or extend beyond the Final Completion Date.

  • Other Directory Services 73.10.1 Both parties acknowledge that CenturyLink’s directory publisher is not a party to this Agreement and that the provisions contained in this Agreement are not binding upon CenturyLink’s directory publisher. 73.10.2 CenturyLink agrees to include critical contact information pertaining to CLEC in the “Information Pages” of those of its White Pages directories containing information pages, if CLEC meets criteria established by its directory publisher. Critical contact information includes CLEC’s business office number, repair number, billing information number, and any other information required to comply with applicable regulations, but not advertising or purely promotional material. CLEC will not be charged for inclusion of its critical contact information. The format, content and appearance of CLEC’s critical contact information must conform to applicable directory publisher’s guidelines and will be consistent with the format, content and appearance of critical contact information pertaining to all CLECs in a directory. 73.10.3 The directory publisher shall maintain full authority as publisher over its publishing policies, standards and practices, including decisions regarding directory coverage area, directory issue period, compilation, headings, covers, design, content or format of directories, and directory advertising sales.

  • Job Search The Employer should assist surplus staff to find alternative employment by allowing them a reasonable amount of time off work to attend job interviews without loss of pay. This is subject to the Employer being notified of the time and location of the interview before the employee is released to attend it.

  • Linking to the Website and Social Media Features You may link to our homepage, provided you do so in a way that is fair and legal and does not damage our reputation or take advantage of it, but you must not establish a link in such a way as to suggest any form of association, approval, or endorsement on our part. This Website may provide certain social media features that enable you to: • Link from your own or certain third-party websites to certain content on this Website. • Send emails or other communications with certain content, or links to certain content, on this Website. • Cause limited portions of content on this Website to be displayed or appear to be displayed on your own or certain third-party websites. You may use these features solely as they are provided by us, and solely with respect to the content they are displayed with, and otherwise in accordance with any additional terms and conditions we provide with respect to such features. Subject to the foregoing, you must not: • Establish a link from any website that is not owned by you. • Cause the Website or portions of it to be displayed on, or appear to be displayed by, any other site, for example, framing, deep linking, or in-line linking. • Link to any part of the Website other than the homepage. • Otherwise take any action with respect to the materials on this Website that is inconsistent with any other provision of these Terms of Use. The website from which you are linking, or on which you make certain content available, must comply in all respects with the Content Standards set out in these Terms of Use. You agree to cooperate with us in causing any unauthorized framing or linking immediately to stop. We reserve the right to withdraw linking permission without notice. We may disable all or any social media features and any links at any time without notice in our discretion.

  • Other Direct Costs For any justified Direct Cost incurred for Change Order work not covered by the categories of costs contained in Sections 4.5.10.1 through 4.5.10.4, DB Contractor shall accept as full payment therefor an amount equal to the actual cost to DB Contractor for such Direct Cost item without additional markup. Back-up documentation supporting each cost item for this category shall be provided by DB Contractor and approved by TxDOT in writing prior to any payment authorization being granted.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!