C Stockpile Reliability Program Sample Clauses

C Stockpile Reliability Program. (SRP)/Surveillance The Contractor shall provide support for the performance of SRP/surveillance testing on Army and Foreign Military Sales at RTC test facilities and throughout the world on major weapons systems to identify deterioration of components and to gather data to predict remaining shelf life and reliability. Evaluation includes long-term storage effects; non-destructive functional testing; and electrical, mechanical, optical, and physical inspections for HELLFIRE, Longbow, Javelin, and Stinger missiles. SRP evaluation for related components of the systems listed as well as ATACMS/GMLRS shall include inspections and testing to determine long-term storage effects; performing non-destructive and destructive functional testing; and electrical, mechanical, optical, and physical inspections. Required services shall include test planning, scheduling, instrumentation, mechanical/electrical maintenance/repair, data collection, conduct, explosive handling and storage, data reduction and analysis, and documentation to support test programs. Testing shall be performed IAW current and subsequent publications of test plans, SOPs, and weapon system specification documents as defined in tasks. The Contractor shall plan SRP and surveillance trips, coordinate transportation of test equipment, test vans and personnel to and from test sites, transport vans and supporting equipment, conduct on-site surveillance tests, arrange for on-site repairs as required, and transfer SRP/surveillance test data into computerized databases. Performance Standards STD: Accurate and timely direct test support within schedule and milestones as requested by the Government. AQL: 100% compliant with all regulations. 95% mission capable. Acceptable performance of this task requires the Contractor to perform direct test support functions and activities correctly and completely, with no more than 1 substantiated incident every six months. Deliverables A005 Work Products as requested A006 Data Reports and Documents as required
AutoNDA by SimpleDocs

Related to C Stockpile Reliability Program

  • Constructability Program 5.2.1 Implement and conduct a constructability program to identify and document Project cost and schedule savings opportunities. The constructability program shall follow accepted industry practices and be reviewed by Owner at design milestones. Whenever the term “value engineering” is used in conjunction with this Agreement or the Project, it has its commonly accepted meaning within the construction industry and does not imply the practice of professional engineering without a license. If any value engineering activities constitute the professional practice of engineering, then such activities shall be performed by an engineer licensed in Texas.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Authorized User Overview and Mini-Bid Process Project Based IT Consulting Services Contracts enable Authorized Users to use a competitive Mini-bid Process to acquire Services on an as-needed basis, for qualified IT Projects. Project Based IT Consulting Services may include, but will not be limited to projects requiring: analysis, data classification, design, development, testing, quality assurance, security and associated training for Information Technology based applications. See section 1.3 Out of Scope Work for a listing of projects expressly excluded from the scope of this Contract. An Authorized User Agreement for Project Based IT Consulting Services will be governed first by the terms and conditions specified in the OGS Centralized Contract and second by terms and conditions added to the Authorized User Statement of Work. Additional terms and conditions shall not conflict with or modify the terms and conditions of the OGS Centralized Contract. NYS Executive Agencies must adhere to all internal processes and approvals including, as required, approval from NYS Office of Information Technology Services. Other Authorized Users must adhere to their own internal processes and approvals. In accordance with Appendix B, section 28, Modification of Contract Terms, an Authorized User may add additional required terms and conditions to this Mini-Bid and resultant Authorized User Agreement only if such terms and conditions (1) are more favorable to the Authorized User and (2) do not conflict with or supersede the OGS Centralized Contract terms and conditions. Examples of additional terms and conditions include: • Expedited delivery timeframe; • Additional incentives, such as discount for expedited payment/Procurement Card use; and • Any additional requirements imposed by the funding source or Federal law.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Alignment with Modernization Foundational Programs and Foundational Capabilities The activities and services that the LPHA has agreed to deliver under this Program Element align with Foundational Programs and Foundational Capabilities and the public health accountability metrics (if applicable), as follows (see Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf):

  • Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as: (A) line-side facilities, which include, but are not limited to, the connection between a loop termination at a main distribution frame and a switch line card; (B) trunk-side facilities, which include, but are not limited to, the connection between trunk termination at a trunk-side cross-connect panel and a switch trunk card; (C) switching provided by remote switching modules; and (D) all features, functions, and capabilities of the switch, which include, but are not limited to: (1) the basic switching function of connecting lines to lines, line to trunks, trunks to lines, and trunks to trunks, as well as the same basic capabilities made available to BellSouth’s customers, such as a telephone number, white page listings, and dial tone; and (2) all other features that the switch is capable of providing, including but not limited to customer calling, customer local area signaling service features, and Centrex, as well as any technically feasible customized routing functions provided by the switch. Any features that are not currently available but are technically feasible through the switch can be requested through the BFR/NBR process.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!