Change Program Settings Sample Clauses

Change Program Settings. 8) Quit Upon first starting the execution of the Remote Manager program, the Main Menu appers on the screen. It is from this menu that all other menus may be accessed. There are three ways to access the commands listed in the Main Menu or other subsequent menus:
AutoNDA by SimpleDocs
Change Program Settings. This command is for future program options and is presently not used.

Related to Change Program Settings

  • Program Objective The objectives of the Department’s grants are to:

  • Single Source Selection Services for tasks in circumstances which meet the requirements of paragraph 3.10 of the Consultant Guidelines for Single Source Selection, may, with the Association's prior agreement, be procured in accordance with the provisions of paragraphs 3.9 through 3.13 of the Consultant Guidelines.

  • Interconnection Product Options Interconnection Customer has selected the following (checked) type of Interconnection Service:

  • Signaling Parameters All SS7 signaling parameters will be provided in conjunction with traffic exchange trunk groups, where and as available. These parameters include Automatic Number Identification ("ANI"), Calling Party Number ("CPN"), Privacy Indicator, calling party category information, originating line information, charge number, etc. Also included are all parameters relating to network signaling information, such as Carrier Information Parameter ("CIP"), wherever such information is needed for call routing or billing. GTE will provide SS7 via GR-394-SS7 and/or GR-317-SS7 format(s).

  • Program Objectives In performing its responsibilities with respect to the management and administration of the Program, each party shall be guided by the following Program objectives:

  • Performance Measures and Metrics This section outlines the performance measures and metrics upon which service under this SLA will be assessed. Shared Service Centers and Customers will negotiate the performance metric, frequency, customer and provider service responsibilities associated with each performance measure. Measurements of the Port of Seattle activities are critical to improving services and are the basis for cost recovery for services provided. The Port of Seattle and The Northwest Seaport Alliance have identified activities critical to meeting The NWSA’s business requirements and have agreed upon how these activities will be assessed.

  • Shift Change Where employees are assigned mid-week to work a non-day shift (whether due to emergencies or a shift change) and as a result lose a shift in the regular work week, such employees will be paid six (6) hours for such loss of earnings.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Time is Money Join Law Insider Premium to draft better contracts faster.