Chemical Stabilization Sample Clauses

Chemical Stabilization. [This section describes the required use of chemicals or other materials that would reduce the spread of the release. Examples include a polymer coating to stop dust migration and stabilization chemicals to stop the migration of the chemical from soil to groundwater. These actions may be an alternative to capping].
AutoNDA by SimpleDocs

Related to Chemical Stabilization

  • Stabilization Neither the Company nor, to its knowledge, any of its employees, directors or shareholders (without the consent of the Representative) has taken or shall take, directly or indirectly, any action designed to or that has constituted or that might reasonably be expected to cause or result in, under Regulation M of the Exchange Act, or otherwise, stabilization or manipulation of the price of any security of the Company to facilitate the sale or resale of the Public Securities.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Indoor Air Quality The Employer shall ensure a healthful air quality and attempt to ensure comfortable air temperature in buildings it owns and in space that it leases.

  • Air Quality To the extent applicable, Consultant must fully comply with all applicable laws, rules and regulations in furnishing or using equipment and/or providing services, including, but not limited to, emissions limits and permitting requirements imposed by the South Coast Air Quality Management District (SCAQMD) and/or California Air Resources Board (CARB). Although the SCAQMD and CARB limits and requirements are more broad, Consultant shall specifically be aware of their application to "portable equipment", which definition is considered by SCAQMD and CARB to include any item of equipment with a fuel-powered engine. Consultant shall indemnify City against any fines or penalties imposed by SCAQMD, CARB, or any other governmental or regulatory agency for violations of applicable laws, rules and/or regulations by Consultant, its subconsultants, or others for whom Consultant is responsible under its indemnity obligations provided for in this Agreement.

  • Development 3.3 Within twenty (20) Working Days after the Commencement Date and in accordance with paragraphs 3.10 to 3.12 (Amendment and Revision), the Contractor will prepare and deliver to the Authority for approval the full and final Security Plan which will be based on the draft Security Plan set out in Appendix B.

  • Post-Stabilization Services The PH-MCO must cover Post-Stabilization Services, as defined in 42 C.F.R. §438.114. The PH-MCO must limit charges to Members for Post-Stabilization Services to an amount no greater than what the PH-MCO would charge the Member if he or she had obtained the services through a Network Provider. The PH-MCO must cover Post-Stabilization Services without authorization, and regardless of whether the Member obtains the services within or outside its Provider Network if any of the following situations exist:

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • CURVE WIDENING The minimum widening placed on the inside of curves is:  6 feet for curves of 50 to 79 feet radius.  4 feet for curves of 80 to 100 feet radius.

  • Public Procurement 1. The Parties consider the liberalization of their respective public procurement markets as an objective of this Agreement.

  • Electrical Safety Only UL approved items are permitted in Housing & Residence Life. Extension and multi-use cords must be heavy duty, single plug, and be UL approved. Altering or adapting electrical outlets and equipment and overloading circuits jeopardize safety and thus are not permitted.

Time is Money Join Law Insider Premium to draft better contracts faster.