Sanitary and Phytosanitary Measures 1. The rights and obligations of the Parties in respect of sanitary and phytosanitary measures shall be governed by the WTO Agreement on the Application of Sanitary and Phytosanitary Measures. 2. The Parties shall exchange names and addresses of contact points with sanitary and phytosanitary expertise in order to facilitate communication and the exchange of information.
Sanitary Facilities Construction (a) Closets shall be soundly constructed and roofed with weatherproof material. The floor of each closet shall be well drained and constructed of concrete, bricks and cement, or of other approved materials which shall be impervious to water. Every closet shall be well lighted by natural or artificial light and shall be ventilated. Each closet shall have a hinged door, capable of being fastened on the inside, lift seats/flaps and toilet paper. (b) If closets are of single unit construction (only to be used for the formwork process), not contained within a purpose built ablution block, privacy walls which shield the closet/s from outside view shall be installed. (Privacy walls are not required for purpose built ablution blocks eg ATCO huts). (c) Where practicable, toilets to be connected to sewerage before commencement of the job. (d) Closet/urinal location to be conveniently accessible to Employees, but not so close as to cause a nuisance to those persons. (e) Where necessary, portable water seal toilets of an approved standard are to be provided and regularly serviced. (f) Conveniently accessible closets and urinals are to be distributed every 5th floor on multi storey constructions. (g) Closets and urinals are to be washed daily with disinfectant and kept in clean, hygienic condition. (h) Adequate washing facilities, suitably drained, and wash basins/troughs are to be supplied with hot and cold running water. (i) Soap and towels are to be supplied.
Clean Air (A) The CONTRACTOR agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. §§ 7401 et seq. The CONTRACTOR agrees to report each violation to the COMMISSION and understands and agrees that the COMMISSION will, in turn, report each violation as required to assure notification to FTA and the appropriate EPA Regional Office. (B) The CONTRACTOR also agrees to include these requirements in each subcontract exceeding $100,000 financed in whole or in part with Federal assistance provided by FTA.
Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)
Sanitary Sewer Provide a standard bubble map, as part of the plans, showing locations of numbered points, and a table with point number, northing and easting coordinates, description, and BL station for each point, for the following: ▪ all possible control as established or attained during preliminary survey, including but not limited to – section corners, property irons, intersection center-center irons, other set monuments ▪ benchmarks, including TBM set with preliminary survey ▪ center of manholes ▪ end of manhole stubs (when longer than five feet)
Water Provide hot water for lavatory purposes and cold water for drinking, lavatory and toilet purposes.
Heating, Ventilating and Air Conditioning General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the
Stormwater Management a) The Owner AGREES to implement the requirements incorporated in the Draft Plan Conditions attached as Schedule “F” and any reports submitted to Kawartha Region Conservation Authority and the City pertaining to: i) pre and post development run-off flows and water balance calculations, and the intended means of conveying stormwater flow from each Lot, Block and the entire proposed Plan of Subdivision; ii) the anticipated impact of the Plan of Subdivision on water quality and phosphorus control, as it relates to fish and fish habitat once adequate protective measures have been taken; iii) the means whereby erosion and sedimentation and their effects will be minimized on the site during and after construction; iv) the site soil conditions, including grain size distribution profiles; v) a site grading plan. b) The Owner AGREES to erect and maintain all stormwater management and erosion and sedimentation control structures operating and in good repair during the construction period, in a manner satisfactory to Kawartha Region Conservation Authority and the City. c) Prior to the execution of this Agreement, the Owner AGREES to confirm to the City that Conservation Authority has reviewed and approved the stormwater management report and plan, erosion and sedimentation plan, and final Lot Grading Plans as required under this Section. a) UPGRADES TO EXISTING STORM SEWER b) UPGRADES TO EXISTING SANITARY SEWER
Heating, Ventilation and Air Conditioning Landlord shall furnish to the Premises heating, ventilation and air-conditioning (“HVAC”) in accordance with the Design Standards set forth in Exhibit E during Ordinary Business Hours. Landlord shall have access to all air-cooling, fan, ventilating and machine rooms and electrical closets and all other mechanical installations of Landlord (collectively, “Mechanical Installations”), and Tenant shall not construct partitions or other obstructions which may interfere with Landlord’s access thereto or the moving of Landlord’s equipment to and from the Mechanical Installations. No Tenant Party shall at any time enter the Mechanical Installations or tamper with, adjust, or otherwise affect such Mechanical Installations. Landlord shall not be responsible if the HVAC System fails to provide cooled or heated air, as the case may be, to the Premises in accordance with the Design Standards by reason of (i) any equipment installed by, for or on behalf of Tenant, which has an electrical load in excess of the average electrical load and human occupancy factors for the HVAC System as designed, or (ii) any rearrangement of partitioning or other Alterations made or performed by, for or on behalf of Tenant. Tenant shall install, if missing, blinds or shades on all windows, which blinds and shades shall be subject to Landlord’s approval, and shall keep all of the operable windows in the Premises closed, and lower the blinds when necessary because of the sun’s position, whenever the HVAC System is in operation or as and when required by any Requirement. Tenant shall cooperate with Landlord and shall abide by the rules and regulations which Landlord may reasonably prescribe for the proper functioning and protection of the HVAC System.
Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.