Compressed Air Systems Sample Clauses

Compressed Air Systems. Air Compressors - Service Air System Quantity 4 Make TAMROTOR MARINE COMPRESSORS AS Model TMC 235-13 EWNA (water cooled) Rated capacity 1,560 m3 / hour Working press 12 bar Prime mover (electric/diesel) Electric Continuous power 230 kW Air dryers Xxxxx Xxx Dryers Quantity 1 per unit Make/Type KADM - 2000 W Xxxxx Rated Capacity 1,560 m3 / hour Air Compressors - Instrument / Control Air System From Service Air System (above) Quantity Make Model Rated capacity m3 / hour Working press bar Prime mover (electric/diesel) Continuous power Air dryers Xxxxx Xxx Dryers Quantity 1 per unit Make/Type KHDMH - 600 Rated Capacity 557 m3 / hour Air Compressors - Main Engine Start / Direct Injection System Quantity 6 (2 per engine room) Make Sperre Air Compressor Model XW090 Rated capacity 85-100 m3 / hour Working press 25-30 bar Prime mover (electric/diesel) Electric Continuous power 23 kW Air dryers Quantity 3 (one per engine room) Make/Type Rated Capacity m3 / hour Air Compressors - Emergency Gen. Start Air System Quantity 1 Make Sperre Air Compressor Model HL2/90 Rated capacity 34 m3 / hour Working press 30 bar Prime mover (electric/diesel) Diesel Continuous power 11 kW Air dryers Quantity 1 Make/Type Vertical Rated Capacity 34 m3 / hour Air Compressors - Bulk Air System (Independent) The Service Air System shall be connected to the bulk air system and supply air in case of pressure drop below the setting point Quantity 1 Make TAMROTOR MARINE COMPRESSORS AS Model TMC 235-13 EWNA (water cooled) Rated capacity 1,560 m3 / hour Working press 12 bar Prime mover (electric/diesel) Electric Continuous power 230 kW Air dryers Quantity 1 per unit Make/Type dessicant Rated Capacity 1,560 m3 / hour Air Compressors - Riser Tensioning System Quantity 3 Make NOV Model Rated capacity 138 m3 / hour Working press 300 bar Prime mover (electric/diesel) Electric Continuous power 55 kW Air dryers Quantity 4 per unit Make/Type Dessicant tower Rated Capacity 138 m3 / hour Air Compressors - Breathing Air System Quantity 2 Make Model Rated capacity 27 m3 / hour Working press 207-220 bar Prime mover (electric/diesel) Electric Continuous power Air dryers Quantity Make/Type Rated Capacity m3 / hour
AutoNDA by SimpleDocs
Compressed Air Systems. C12125 for maintenance contract for air compressor system for the Facilities Department. Fiscal Impact: $7,699.00 included in the 2013-14 UGF budget.

Related to Compressed Air Systems

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Interconnection 2.1.10 Startup Testing and Commissioning

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • Heat and Air-Conditioning Landlord shall provide and maintain heat, ventilation and air-conditioning (“HVAC”) equipment sufficient to maintain the Premises at comfortable temperatures for general office use, subject to all federal, state and municipal regulations, during Normal Building Operating Hours (as defined in the Rules and Regulations) and subject to compliance by Tenant with the following and the provisions of Section 6.2.4. If Tenant shall require HVAC at times other than Normal Building Operating Hours, Landlord may furnish such service and Tenant shall pay therefor such charges as may from time to time be in effect. If the temperature otherwise maintained in any portion of the Premises by the HVAC system is affected as a result of (i) the type or quantity of any lights, machines or equipment used by Tenant in the Premises, (ii) the occupancy of any portion of the Premises by more than one person per two hundred (200) square feet of rentable area, (iii) an electrical load for lighting or power in excess of the limits specified in Section 6.2.4, or (iv) any partitioning or other improvements installed by Tenant, then at Tenant’s sole cost, Landlord may install any equipment, or modify any existing equipment Landlord deems necessary to restore the temperature balance. Tenant agrees to keep closed, when necessary, blinds or other window treatments which, because of the sun’s position, must be closed to provide for the efficient operation of the air conditioning system, and Tenant agrees to cooperate with Landlord and to abide by the reasonable regulations and requirements which Landlord may prescribe for the proper functioning and protection of the HVAC system. Landlord shall have no responsibility for providing any service from Separate HVAC Equipment, as defined in Section 6.1.3.

  • Utility Services Company agrees to pay the full cost and expense associated with its use of all utilities, including but not limited to water, sanitary sewer, electric, storm drainage, and telecommunication services.

  • HEATING, VENTILATING AND AIR CONDITIONING General Office Area: The building shall be equipped with a combination heating, ventilation and air conditioning system. The system shall have ducted supply and return air. The space above the ceiling shall not be used as a supply or return plenum. The systems shall be sized in accordance with the weather conditions identified in Chapter 13, “Energy Conservation” of the 1996 BOCA Building Code and supplemented by the “Building Code Rules”. All HVAC equipment shall be commercial or light industrial grade. If new construction it shall be installed at grade or within mechanical rooms for easy access and maintenance. If existing construction, roof mounted equipment will be considered after all other options have been exhausted, including the elimination of noise and vibration transfer to the structural members. The HVAC systems shall be zoned, with units sized and placed as required by heating and cooling loads on the building. Zoning of systems is dependent on the size, shape and orientation of the building. The HVAC system shall be divided into a minimum of 4 exterior and 1 interior temperature control zones. Return air shall be taken from the area supplied or adjacent to the area in the same temperature control zone. The ventilation and exhaust system shall be sized to maintain a positive pressure throughout the building envelope to limit air and dust infiltration. No HVAC ductwork shall be installed under the floor slab or underground.

  • Sprinkler System If there now is or shall be installed in the Building a "sprinkler system", and such system or any of its appliances shall be damaged or injured or not in proper working order by reason of any act or omission of Tenant, Tenant's agents, servants, employees, licensees or visitors, Tenant shall forthwith restore the same to good working condition at its own expense; and if the New York Board of Fire Underwriters or the New York Fire Insurance Rating Organization or any bureau, department or official of the state or city government, shall require or recommend that any changes, modifications, alterations or additional sprinkler heads or other equipment be made or supplied by reason of Tenant's business, or the location of the partitions, trade fixtures, or other contents of the Premises, Tenant shall, at Tenant's expense, promptly make and supply such changes, modifications, alterations, additional sprinkler heads or other equipment.

  • Monitoring System In each case in which the Custodian has exercised delegated authority to place Assets with a Foreign Custodian, the Custodian shall establish a system, to re-assess or re-evaluate selected Foreign Custodians, at least annually in accordance with Rule 17f-5(c)(3).

Time is Money Join Law Insider Premium to draft better contracts faster.