CONNECTION TO THE CITY’S SYSTEM Sample Clauses

CONNECTION TO THE CITY’S SYSTEM. Not less than 48 hours prior to the time that connection to the City’s system is desired, the contractor shall notify the City Engineer and/or City inspector. All connections to the existing system and all testing of the new line shall be at a time and in the manner specified by the City and shall be conducted in the presence of the City’s authorized representative. Where connections to the City’s water or sewer system would, in the opinion of the City, create unacceptable disruption to service, such connection shall be made by live tap.
AutoNDA by SimpleDocs
CONNECTION TO THE CITY’S SYSTEM. Not less than 48 hours prior to the time that connection to the City’s system is desired, written agreement for permission to make the actual connection to the City’s system shall be made by Developer or its contractor. All connections to the existing system and all testing of the new line shall be at a time and in the manner specified by the City and shall be conducted in the presence of the City’s authorized representative. Where connections to the City’s water or sewer system would, in the opinion of the City, create unacceptable disruption to service, such connection shall be made by live tap.

Related to CONNECTION TO THE CITY’S SYSTEM

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Connections HTC”s responsibility for service ends at the demarcation point. “Demarcation” means the point of meeting where the “hand-off” occurs between HTC’s system and Customer’s system. Facilities used by HTC in providing Services may be connected with terminal equipment or communications systems provided by Customer. In such a case, facilities and terminal equipment or communications systems provided by Customer or its customers shall be subject to mutually agreeable technical interface specifications.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Sub-loop Elements 2.8.1 Where facilities permit, BellSouth shall offer access to its Unbundled Sub-Loop (USL) elements as specified herein.

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and VarTec, VarTec shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks and the Entrance Facility, on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

  • Internet Connection In order to ensure the proper functioning of the Production Monitor and the Consumption Monitor, if possible, you must provide the Solar System with continuous access to a functioning broadband internet connection with one (1) wired Ethernet port and standard electrical outlet, at your cost. If you are unable to provide the Solar System with an internet connection in accordance with the foregoing sentence, the Home must be located in an area with cellular service that is acceptable to us in our discretion.