Conserving Water for Power Generation Sample Clauses

Conserving Water for Power Generation. If a Voltage or Capacity Emergency is expected to continue for two weeks or more, the Licensee may reduce Project outflow below Required Minimum Instream Flows or LIP Flows to the Critical Flow (as defined in the LIP) if taking such action is necessary to maintain the water inventory in Project reservoirs for use during the voltage and capacity emergency. During a voltage and capacity emergency, the Licensee will not conserve water for power generation strictly as a cost avoidance measure, but only to assist in addressing the emergency.
AutoNDA by SimpleDocs

Related to Conserving Water for Power Generation

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Stormwater Management The Owner agrees that stormwater management measures shall be applicable to the development of the Lands, in a manner which is in accordance with the provisions of The Drainage Act, R.S.O. 1990, c.D.17 and amendments thereto, and to the satisfaction of the Municipality's Engineer.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Infertility Services This plan covers the following services, in accordance with R.I. General Law §27-20-20. • Services for the diagnosis and treatment of infertility if you are:

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Conservation Tenant hereby agrees to comply with all energy conservation procedures, controls and requirements instituted by Landlord pursuant to any government regulations or otherwise, including but not limited to controls on the permitted range of temperatures, the volume of energy consumption or the hours of operation of the Building. Institution by Landlord of such controls and requirements shall not entitle Tenant to terminate this Lease or to an abatement of any Rent payable hereunder.

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

Time is Money Join Law Insider Premium to draft better contracts faster.