Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following: a) The project area, to become familiar with on-site conditions. b) As-built drawings. c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37-83DC-4941-AE29-23B518BD187A d) Soil conditions based upon the geo-technical report provided by the architect. e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings. f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E377D8EC748-83DC-4941F6B4-AE29435F-8D30-23B518BD187A75CEDF9B7AD0
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37-83DC-4941-AE29-23B518BD187A.
d) Soil conditions based upon the geo-technical report provided by the architect.. DocuSign Envelope ID: B796865F-C4F1-479B-8CA8-E8BCEAC48BA6
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E3794F8D00C-88DE-44C5-83DC-49418933-AE29-23B518BD187A18AC9D26666F
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37-83DC-4941-AE29-23B518BD187A.
d) Soil conditions based upon the geo-technical report provided by the architect.. DocuSign Envelope ID: 70FDD066-DA40-40E6-81B9-BA15AEAC4215
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E373358FCF4-83DC-4941295F-4168-AE29B104-23B518BD187A68AA79F3A062
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37-83DC-4941-AE29-23B518BD187A.
d) Soil conditions based upon the geo-technical report provided by the architect.. DocuSign Envelope ID: 2A798B2C-887D-407F-A914-66DF8EEC5D13
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37683F4AFD-556C-4856-83DC-4941-AE29-23B518BD187AB5DE-871990714E69
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E371A8DB9E1-83DC-49416C86-AE29406A-23B518BD187AB7F2-BFFBC1953AB8
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37ED00C58D-9F77-83DC-494147B9-AE29BEE0-23B518BD187A6982B57EC9FF
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37ACEF04C9-83DC-4941AFD3-AE29433A-90CF-23B518BD187AAF03B3972AC9
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract
Constructability Review and Reporting. The Construction Administrator will provide a “Constructability Review” report of the early design documents. The report will be based upon an inspection that will include, but not be limited to, the following:
a) The project area, to become familiar with on-site conditions.
b) As-built drawings.
c) Proposed mechanical, electrical, and plumbing (MEP) systems overview. DocuSign Envelope ID: 66CD3E37025CF580-83DC-49416CA9-AE2949EF-23B518BD187AAC59-09B96C5E1E38
d) Soil conditions based upon the geo-technical report provided by the architect.
e) For certain projects, sustainable design strategies including LEED Silver certification and the client agency’s policies and standards for healthy buildings.
f) Phasing requirements, if any.
Appears in 1 contract