We use cookies on our site to analyze traffic, enhance your experience, and provide you with tailored content.
For more information visit our privacy policy.System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Equipment and Facilities For On-Site Courses, you will supply the facility and equipment as set forth at xxx.xxxxxx.xxx/xxxxxxxx/xxxxxxxxx/xxxxxxxxxxxx.xxxx. If Red Hat agrees to provide the training facilities and hardware, you will be liable for any loss or destruction of this equipment and hardware used in connection with the Training.
Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.
CONSTRUCTION AND RENOVATION Construction and renovation projects for a state, local, territorial, or Tribal government’s principal Emergency Operations Center (EOC) as defined by the State Administrative Agency are allowable under the EMPG Program. Written approval must be provided by FEMA prior to the use of any EMPG Program funds for construction or renovation. Requests for EMPG Program funds for construction of an EOC must be accompanied by an EOC Investment Justification (located in the Related Documents tab of the EMPG xxxxxx.xxx posting) to their Regional EMPG Manager for review. Additionally, recipients are required to submit a SF-424C Form and Budget detail citing the project costs. When applying for funds to construct communication towers Sub-Recipients must submit evidence that the Federal Communication Commission’s (FCC) Section 106 review process has been completed and submit all documentation resulting from that review to Grants Program Directorate (GPD) prior to submitting materials for EHP review. Sub-Recipients are also encouraged to have completed as many steps as possible for a successful EHP review in support of their proposal for funding (e.g., coordination with their State Historic Preservation Office to identify potential historic preservation issues and to discuss the potential for project effects, compliance with all state and EHP laws and requirements). Projects for which the Sub-Recipient believes an Environmental Assessment (EA) may be needed, as defined in as defined in DHS Instruction Manual 023-01-001-01, Revision 01, FEMA Directive 108-1 and FEMA Instruction 108-1-1, must also be identified to the FEMA EMPG Regional Program Manager within six months of the award, and completed EHP review materials must be submitted no later than 12 months before the end of the period of performance. EHP review packets should be sent to xxxxxxxxxx@xxxx.xxx. EMPG Program Sub-Recipients using funds for construction projects must comply with the Xxxxx-Xxxxx Act (40 U.S.C. §§ 3141 et seq.). Grant Sub-Recipients must ensure that their contractors or subcontractors for construction projects pay workers no less than the prevailing wages for laborers and mechanics employed on projects of a character similar to the contract work in the civil subdivision of the state in which the work is to be performed. Additional information regarding compliance with the Xxxxx- Xxxxx Act, including Department of Labor (DOL) wage determinations, is available from the following website: xxxxx://xxx.xxx.xxx/whd/govcontracts/dbra.htm In general, Sub-Recipients should consult with their Grant Manager prior to making any investment that does not clearly meet the allowable expense criteria established in this Guidance.
System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.
Condition of the Contractor’s Property or Equipment The Contractor shall make the Property and/or equipment available to the Judicial Council, pursuant to the terms and conditions set forth in this Agreement. The Contractor shall immediately remedy any problem with the Property’s physical plant or equipment that impairs or diminishes the quality of the Program. The Contractor shall ensure the appropriate hot water, heating, and ventilation is provided at the Property during the Program, inclusive in the prices set forth herein.
Office Space, Equipment and Facilities Provide such office space, office equipment and office facilities as are adequate to fulfill the Adviser’s obligations hereunder.
Alterations and Amendments This Agreement, applicable fees and service charges may be altered or amended from time-to-time. In such event, we will provide notice to you. Any use of the Service after we provide you a notice of change will constitute your agreement to such change(s). Further, we may, from time to time, revise or update the applications, services, and/or related material, which may render all such prior versions obsolete. Consequently, we reserve the right to terminate this Agreement as to all such prior versions of the applications, services, and/or related material and limit access to only the Service's more recent revisions and updates.
Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.
Alterations, Modifications and Additions Company will, or will cause a Permitted Lessee to, make (or cause to be made) such alterations and modifications in and additions to the Airframe and the Engines as are required from time to time to meet the applicable requirements of the FAA or any applicable government of any other jurisdiction in which the Aircraft is then registered; except for (i) immaterial and non-recurring violations with respect to which corrective measures are being taken promptly by Company (or, if a Lease is then in effect, any Permitted Lessee) upon discovery thereof and (ii) any law, rule, regulation or order the validity or application of which is being contested in good faith by Company (or, if a Lease is then in effect, any Permitted Lessee) in any manner which does not involve any material risk of sale, loss or forfeiture of the Aircraft and does not materially adversely affect Loan Trustee’s interest in the Aircraft. In addition, Company (or any Permitted Lessee), at its own expense, may from time to time add further parts or accessories and make or cause to be made such alterations and modifications in and additions to the Airframe or any Engine as Company (or any Permitted Lessee) deems desirable in the proper conduct of its business, including, without limitation, removal (without replacement) of Parts; provided that no such alteration, modification or addition shall materially diminish the value or utility of the Airframe or such Engine below its value or utility immediately prior to such alteration, modification or addition, assuming that the Airframe or such Engine was then in the condition required to be maintained by the terms of this Indenture, except that the value (but not the utility) of the Airframe or any Engine may be reduced by the value of any such Parts that are removed that Company (or such Permitted Lessee) deems obsolete or no longer suitable or appropriate for use on the Airframe or any Engine. For the avoidance of doubt, Company may make alterations in the passenger configuration of the Aircraft and such alterations shall not be subject to the immediately preceding sentence. All Parts incorporated or installed in or attached or added to the Airframe or any Engine as the result of such alteration, modification or addition shall, without further act, be subject to the Lien of this Indenture. Notwithstanding the foregoing, Company (or any Permitted Lessee) may, at any time, remove any Part from the Airframe or any Engine if such Part: (i) is in addition to, and not in replacement of or substitution for, any Part originally incorporated or installed in or attached to the Airframe or such Engine at the time of delivery thereof to Company or any Part in replacement of, or substitution for, any such Part, (ii) is not required to be incorporated or installed in or attached or added to the Airframe or such Engine pursuant to the first sentence of this Section 7.04(c) and (iii) can be removed from the Airframe or such Engine without materially diminishing the value or utility required to be maintained by the terms of this Indenture that the Airframe or such Engine would have had had such Part never been installed on the Airframe or such Engine. Upon the removal by Company (or any Permitted Lessee) of any Part as permitted by this Section 7.04(c), such removed Part shall, without further act, be free and clear of all rights and interests of Loan Trustee and the Lien of this Indenture and shall no longer be deemed a Part hereunder. Upon request of Company from time to time, Loan Trustee shall execute and deliver to Company instruments reasonably requested by Company confirming the release of any such removed Part from the Lien of this Indenture. Loan Trustee acknowledges that it has no interest in the Excluded Equipment. Notwithstanding the provisions of this Section 7.04(c) or any other term or condition of this Indenture, Company (or any Permitted Lessee) may from time to time install on, and remove from, the Aircraft equipment that is owned by, leased to or conditionally sold to Company (or any Permitted Lessee) (and title to such equipment shall remain vested in Company, such Permitted Lessee, or the lessor or the conditional vendor thereof) if (1) such equipment is Excluded Equipment and (2) the location affected by any such removal, if damaged, is repaired prior to return, in a workmanlike manner, to a condition suitable for commercial passenger service; provided that all costs of installation, removal and replacement shall be the responsibility of Company.