Construction Documents Phase. INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE 1.1.7.1. The ARCHITECT/ENGINEER shall prepare from the approved Design Development Documents, the Contract Documents consisting of the working drawings and specifications (following the CSI Format) setting forth in detail the requirements for the construction of the entire Project, and all necessary bidding information; and shall assist in the preparation of bidding forms, the Conditions of the Contract, and the form of the Agreement between the State and the Contractor, for and until approved by the State. 1.1.7.2. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project responds to LEED criteria. 1.1.7.3. The ARCHITECT/ENGINEER shall submit to the State in writing a Revised Statement of Probable Construction Cost based thereon, indicated by changes in requirements or general market conditions for and until approved by the State. 1.1.7.4. The ARCHITECT/ENGINEER shall assist the State as requested in filing the required documents for the approval of governmental authorities having jurisdiction over the Project. 1.1.7.5. The ARCHITECT/ENGINEER shall submit the bid set, at 90% completion of the construction documents, to Efficiency Vermont for construction document review. 1.1.7.6. The ARCHITECT/ENGINEER shall prepare and submit a complete set of contract bid documents; drawings to be stamped and signed in PDF format, and an unstamped set in DWG format, with a complete set of specifications in Microsoft Word, to the State at no additional cost. ARCHITECT/ENGINEER shall submit all DWGs documents to the State in AutoCAD 2004 format or newer with all items embedded including Xrefs and photos. ARCHITECT/ENGINEER shall verify compatibility with the State’s CADD unit prior to using any AutoCAD specialty software suite or product (civil, mechanical, map, etc.). ARCHITECT/ENGINEER shall furnish all custom support CAD files (fonts, line types, plot styles, etc.) to the State. All drawings shall include a configured layout tab with sheet border and viewports for printing. ARCHITECT/ENGINEER shall submit all electronic files to the State on an optical disc, CD, DVD or USB storage drive in a format suitable for use by the Department of Buildings and General Services. These documents are to be provided by ARCHITECT/ENGINEER at no additional cost to the State.
Appears in 52 contracts
Samples: Contract # 36473, Contract Amendment, Contract Amendment
Construction Documents Phase. INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE
1.1.7.1. The ARCHITECT/ENGINEER shall prepare from the approved Design Development Documents, the Contract Documents consisting of the working drawings and specifications (following the CSI Format) setting forth in detail the requirements for the construction of the entire Project, and all necessary bidding information; and shall assist in the preparation of bidding forms, the Conditions of the Contract, and the form of the Agreement between the State and the Contractor, for and until approved by the State.
1.1.7.2. The ARCHITECT/ENGINEER shall prepare for the State a revised accounting of how the Project responds to LEED criteria.
1.1.7.3. The ARCHITECT/ENGINEER shall submit to the State in writing a Revised Statement of Probable Construction Cost based thereon, indicated by changes in requirements or general market conditions for and until approved by the State.
1.1.7.4. The ARCHITECT/ENGINEER shall assist the State as requested in filing the required documents for the approval of governmental authorities having jurisdiction over the Project.for
1.1.7.5. The ARCHITECT/ENGINEER shall submit the bid set, at 90% completion of the construction documents, to Efficiency Vermont for construction document review.
1.1.7.6. The ARCHITECT/ENGINEER shall prepare and submit a complete set of contract bid documents; drawings to be stamped and signed in PDF format, and an unstamped set in DWG format, with a complete set of specifications in Microsoft Word, to the State at no additional cost. ARCHITECT/ENGINEER shall submit all DWGs documents to the State in AutoCAD 2004 format or newer with all items embedded including Xrefs and photos. ARCHITECT/ENGINEER shall verify compatibility with the State’s CADD unit prior to using any AutoCAD specialty software suite or product (civil, mechanical, map, etc.). ARCHITECT/ENGINEER shall furnish all custom support CAD files (fonts, line types, plot styles, etc.) to the State. All drawings shall include a configured layout tab with sheet border and viewports for printing. ARCHITECT/ENGINEER shall submit all electronic files to the State on an optical disc, CD, DVD or USB storage drive in a format suitable for use by the Department of Buildings and General Services. These documents are to be provided by ARCHITECT/ENGINEER at no additional cost to the State.
Appears in 1 contract
Samples: Contract Amendment