Construction Installation and Operational Standards Sample Clauses

Construction Installation and Operational Standards 
AutoNDA by SimpleDocs

Related to Construction Installation and Operational Standards

  • Installation, Inspection, and Maintenance The Contractor is responsible for installation and maintenance of the BMPs as a part of its Bid. The Design Professional shall obtain the services of a qualified testing laboratory to inspect the BMPs in accordance with the permits, the costs of such inspections to be borne by the Owner. In the event of Abnormal Weather Conditions or force majeure, the Contractor shall be compensated for re-installation of BMPs at established Unit Prices.

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System. Member-Generator must, at least once every year, conduct a test to confirm that Member-Generator’s System automatically ceases to energize the output (interconnection equipment output voltage goes to zero) within two (2) seconds of being disconnected from Cooperative’s electrical system. Disconnecting the Member-Generator’s System from Cooperative’s electrical system at the visible disconnect switch and measuring the time required for the unit to cease to energize the output shall satisfy this test. Member-Generator shall maintain a record of the results of these tests and, upon request by Cooperative, shall provide a copy of the test results to Cooperative. If Member-Generator is unable to provide a copy of the test results upon request, Cooperative shall notify Member- Generator by mail that Member-Generator has thirty (30) days from the date Member-Generator receives the request to provide Cooperative with the results of a test. If Member-Generator does not provide Cooperative with the test results within the thirty (30) day time period or if the test results provided to Cooperative show that Member-Generator’s net metering unit is not functioning correctly, Cooperative may immediately disconnect Member-Generator’s System from Cooperative’s electrical system. If Member-Generator’s equipment ever fails this test, Member-Generator shall immediately disconnect Member-Generator’s System from Cooperative's electrical system. Member-Generator’s System shall not be reconnected to Cooperative's electrical system by the Member-Generator until Member-Generator’s System is repaired and operating in a normal and safe manner. Cooperative shall have the right to have a representative present and informed when any such tests are conducted. Cooperative does not warrant the testing procedures or results by the presence of its representative. Member-Generator is responsible for protecting their equipment from transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits, and from any other causes or events. Therefore, Cooperative shall not be responsible for damage to Member-Generator’s equipment allegedly caused by transient high voltage spikes caused by lightning and/or transient low voltage conditions caused by faults or short circuits or other causes or events. Member-Generator agrees to notify Cooperative no less than thirty (30) days prior to modification of the components or design of the Member-Generator’s System that in any way may degrade or significantly alter the System’s output characteristics. Member-Generator acknowledges that any such modifications will require submission of a new Application and Agreement to Cooperative.

  • Operational Standards Customer shall furnish, install, operate and maintain in good order and repair, all without cost to the City, all equipment required for the safe operation of the Facility in parallel with the City’s electric distribution system. This includes, but is not limited to, equipment necessary to:

  • Technical Standards The Generation System shall be installed and operated by the Interconnection Customer consistent with the requirements of this Agreement; the Technical Requirements; the applicable requirements located in the National Electrical Code (NEC); the applicable standards published by the American National Standards Institute (ANSI) and the Institute of Electrical and Electronic Engineers (IEEE); and local building and other applicable ordinances in effect at the time of the installation of the Generation System.

  • Maintenance, Repairs and Alterations Landlord hereby covenants that the Premises shall be in reasonably good and usable condition as of the effective date of this Agreement. Replacements made by Landlord, if any, shall belong to it. Landlord shall keep access to the Premises free and clear of any and all obstructions including snow and ice. ** Portions of this agreement have been omitted and filed separately with the SEC pursuant to a confidential treatment request CONFIDENTIAL EXECUTION VERSION In the event of an emergency, Tenant shall have the right to perform any obligation of Landlord under this Agreement and recover from Landlord any reasonable amounts so expended by Tenant within thirty (30) days of the date of demand or, in the alternative, to offset amounts so expended against Rent. Landlord shall, at its sole expense, make structural repairs and replacements to the footings, foundation and structural elements of walls and roofs of the Premises and also shall be responsible for maintenance, repairs and replacements, at its sole expense, of heating, ventilating, air conditioning systems, plumbing systems, and electrical systems, provided, however, that Tenant, at its sole expense, shall be responsible for maintenance, repairs and replacements regarding the irrigation system on the Premises as well as Tenant's occupancy costs as described above in Section 4 of this Agreement and shall also be responsible for maintenance, repairs or replacements necessitated by Tenant's actions. Contact information for the Landlord in case of any maintenance, repair or replacement issues is as follows: [**]1 Additions, improvements and alterations made by Tenant, whether temporary or permanent in nature, shall be subject to the prior approval of Landlord and upon completion shall belong to Tenant, provided that removal may be made without damage to the Premises at the expiration of the Agreement term. If removal of the improvements or alterations would cause damage to the Premises, said improvements and alterations shall automatically become the property of Landlord. Tenant, at its sole expense, shall be responsible for maintenance, repairs and replacements of any additions, improvements or alterations made by Tenant on, in or to the Premises. Tenant shall keep the Premises in good order, repair and condition at all times during the Agreement term, except for ordinary wear and tear.

  • General standard Without prejudice to all other obligations of the parties under this contract, each party shall, in its dealings with the other for the purpose of, and in the course of performance of its obligations under, this contract, act with due efficiency and economy and in a timely manner with that degree of skill, diligence, prudence and foresight which should be exercised by a skilled and experienced:

  • Installation, Maintenance, Testing and Repair Unless otherwise agreed in writing by the Parties, to the extent required by Applicable Law, Interconnection provided by a Party shall be equal in quality to that provided by such Party to itself, any subsidiary, affiliates or third party. If either Party is unable to fulfill its obligations under this Section 14.2, it shall notify the other Party of its inability to do so and will negotiate alternative intervals in good faith. The Parties agree that to the extent required by Applicable Law, the standards to be used by a Party for isolating and clearing any disconnections and/or other outages or troubles shall be at parity with standards used by such Party with respect to itself, any subsidiary, affiliate or third party.

  • WORKLOAD STANDARDS One (1) Direct Service Hour (DSH) will be equal to sixty (60) minutes of direct services.

  • Construction of Public Improvements a. Upon satisfaction of the conditions set forth in Paragraph 2.1 and the notice requirement set forth below, Developer shall construct the Public Improvements at its own expense in accordance with this Agreement, the Final Plat, the Resolution, the Civil Engineering Construction Plans, the Town’s ordinances, resolutions and regulations and all other applicable laws and regulations. All Public Improvements shall be installed and constructed within the rights- of-way or easements dedicated to the Town. Unless otherwise approved by the Town in writing, all materials used for constructing the Public Improvements shall be materials set forth on the Town’s approved material list. Workmanship and materials shall be of good quality.

  • Construction Standards The Subrecipient and Developer shall ensure that all Approved Projects comply with the following requirements:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!