NOTICE TO EMPLOYEES REGARDING THE SAFELY SURRENDERED BABY LAW CONTRACTOR shall notify and provide to its employees, a fact sheet regarding the Safely Surrendered Baby Law, its implementation in Orange County, and where and how to safely surrender a baby. The fact sheet is available on the Internet at xxx.xxxxxxxx.xx.xxx for printing purposes. The information shall be posted in all reception areas where clients are served.
Use of First Samples Drawn For the purposes of all samples (Discovery Sample(s) and Full Sample(s)) discussed in this Appendix, the Paid Claims selected in each first sample shall be used (i.e., it is not permissible to generate more than one list of random samples and then select one for use with the Discovery Sample or Full Sample).
Operation of Lift 3.1 The mode of operation of the passenger/materials lift shall be at the discretion of Management, but there shall be landings at intervals of not more than four (4) storey levels. Subject to sub-clause 3.3, an employee would not be required to walk either up or down more than two (2) floors within the range of the lift, or more than four (4) floors within the range of the lift. 3.2 When the building has risen so that the formwork exceeds floors above the lift travel, the lift travel shall be extended. 3.3 If mechanical or power failure puts the passengers/materials lift out of action, Management must endeavour to correct the failure as soon as possible and have the passengers/materials lift back in use. During such temporary stoppage of the passengers/ materials lift, the employees are expected to walk to their place of work to a maximum of four (4) levels to work in their respective classification, and no industrial action or dispute should take place. 3.4 When lifts are also used to carry materials, preference must be given to the transporting of employees at the starting, finishing and lunch times. Starting times of various Trades may be staggered by agreement to avoid lift congestion at starting and finishing times. 3.5 Should a crane or cranes on a building not be able to operate (eg., because of wind or mechanical failure), employees will continue to work to a maximum of four (4) levels above the range of the lift, provided that the appropriate emergency service is satisfied that it is capable of being able to provide first aid attendance, and removal if necessary, to/of any employee on any section of the project without the use of the crane/s.
Use of FIIOC’s and FSC's Name The Trust shall not use the name of FIIOC and FSC in any Prospectus, sales literature or other material relating to the Trust or any Fund of the Trust in a manner not consented to by FIIOC and FSC prior to use; provided, however, that FIIOC and FSC shall approve all uses of its name which merely refer in accurate terms to its appointments, duties or fees hereunder or which are required by the Securities and Exchange Commission ("SEC" or “Commission”) or a state securities commission; and further, provided that in no event shall such approval be unreasonably withheld.
Additional Remedy for Non-Compliance with Superannuation If the Employer does not contribute the amounts in accordance with this Agreement, the relevant Trust Deed and the Fund or scheme the Employer shall be liable to make the appropriate contributions immediately upon notification of the non compliance. Further, the Employer shall pay the earnings on the relevant Trust Deed and the Fund or scheme that would have accrued during the period of non-payment. The requirement for the Employer to make retrospective payments shall not limit any common law action which may be available in relation to death, disablement or any other cover existing within the terms of a relevant fund.
RESTRICTIONS ON EMPLOYMENT OF FORMER STATE OFFICER OR EMPLOYEE The Engineer shall not hire a former state officer or employee of a state agency who, during the period of state service or employment, participated on behalf of the state agency in this agreement’s procurement or its negotiation until after the second anniversary of the date of the officer’s or employee’s service or employment with the state agency ceased.
Compliance with Consensus Policies and Temporary Policies Registry Operator shall comply with and implement all Consensus Policies and Temporary Policies found at <xxxx://xxx.xxxxx.xxx/general/consensus-‐policies.htm>, as of the Effective Date and as may in the future be developed and adopted in accordance with the ICANN Bylaws, provided such future Consensus Polices and Temporary Policies are adopted in accordance with the procedure and relate to those topics and subject to those limitations set forth in Specification 1 attached hereto (“Specification 1”).
Access to NID 2.7.3.1 NewPhone may access the customer’s premises wiring by any of the following means and NewPhone shall not disturb the existing form of electrical protection and shall maintain the physical integrity of the NID: 2.7.3.1.1 BellSouth shall allow NewPhone to connect its Loops directly to BellSouth’s multi-line residential NID enclosures that have additional space and are not used by BellSouth or any other telecommunications carriers to provide service to the premises; 2.7.3.1.2 Where an adequate length of the customer’s premises wiring is present and environmental conditions permit, either Party may remove the customer premises wiring from the other Party’s NID and connect such wiring to that Party’s own NID; 2.7.3.1.3 Either Party may enter the subscriber access chamber or dual chamber NID enclosures for the purpose of extending a cross-connect or spliced jumper wire from the customer premises wiring through a suitable “punch-out” hole of such NID enclosures; or 2.7.3.1.4 NewPhone may request BellSouth to make other rearrangements to the customer premises wiring terminations or terminal enclosure on a time and materials cost basis. 2.7.3.2 In no case shall either Party remove or disconnect the other Party’s loop facilities from either Party’s NIDs, enclosures, or protectors unless the applicable Commission has expressly permitted the same and the disconnecting Party provides prior notice to the other Party. In such cases, it shall be the responsibility of the Party disconnecting loop facilities to leave undisturbed the existing form of electrical protection and to maintain the physical integrity of the NID. It will be NewPhone’s responsibility to ensure there is no safety hazard, and NewPhone will hold BellSouth harmless for any liability associated with the removal of the BellSouth Loop from the BellSouth NID. Furthermore, it shall be the responsibility of the disconnecting Party, once the other Party’s loop has been disconnected from the NID, to reconnect the disconnected loop to a nationally recognized testing laboratory listed station protector, which has been grounded as per Article 800 of the National Electrical Code. If no spare station protector exists in the NID, the disconnected loop must be appropriately cleared, capped and stored. 2.7.3.3 NewPhone shall not remove or disconnect ground wires from BellSouth’s NIDs, enclosures, or protectors. 2.7.3.4 NewPhone shall not remove or disconnect NID modules, protectors, or terminals from BellSouth’s NID enclosures. 2.7.3.5 Due to the wide variety of NID enclosures and outside plant environments, BellSouth will work with NewPhone to develop specific procedures to establish the most effective means of implementing this section if the procedures set forth herein do not apply to the NID in question.
Compliance with Contractor Employee Jury Service Ordinance Contractor shall comply with the County Ordinance with respect to provision of jury duty pay to employees and have and adhere to a written policy that provides that its employees shall receive from the Contractor, on an annual basis, no less than five days of regular pay for actual jury service in San Mateo County. The policy may provide that employees deposit any fees received for such jury service with the Contractor or that the Contractor deduct from the employees’ regular pay the fees received for jury service.
General Description of Services The A-E will be contacted by County Project Management staff on an “as-needed” basis as projects arise to provide A-E for professional services. Requirements will be discussed by both Parties and A-E shall prepare a written Scope Statement that will include the specific work to be performed, including the costs and time required to complete the project/task. Orange County Project Management staff will then review the A-E’s Scope Statement, proceed with negotiation of task costs and when satisfied, issue a Contract Task Order (“CTO”) against this Contract. The A-E shall serve as lead of a design team that may include other construction design professionals working together to ensure that the original design is carried through to the finished product, with no alterations in materials or design that would lead to safety issues or compromise the quality of the building or building component. Other team members who may be retained by the lead to support a project as a consultant may include but are not limited to landscape architects, lighting designers, data consultants, security consultants, controls engineers, commissioning consultants, traffic engineers, surveyors, estimators, special inspection, etc. The A-E shall be responsible for the preparation of comprehensive building assessments, designs, drawings, specifications, cost estimates, and reports within the scope of the CTO. In the preparation of construction drawings and specification, the A-E shall also responsible for: A. Obtaining data by reviewing record drawings, visiting the site of the construction and by conferences with the User/Client and facility maintenance staff or by other actions as necessary to develop the design; B. Checking of shop drawings, submittals, materials and other data submitted by the Construction Contractor for approval; C. Furnishing consultation and advice to County to clarify the intent of the drawings and specifications and on questions that may arise during the construction of the project; D. Space planning, programming and code compliance review and upgrades; E. The meeting of submittal dates included in the Scope Statement of the Contract Task Order, including the work of consultants; F. Coordination with various agencies having authority of jurisdiction for planning services, entitlement, fire life safety, CEQA, ADA, etc.; G. Construction administration services, testing and commissioning; H. Close out services, as-built plans, material lists, project acceptance, etc. I. The coordination of the various elements of the design to assure compatibility of architectural, structural, electrical, mechanical/plumbing, and other design features; J. Other services as specifically included in the Contract Task Order related to project Initiation, Planning/Design, Bid/Award, Construction and Closeout. The A-E shall restrict themselves to the Scope Statement of the Contract Task Order. Any changes in the Scope Statement shall require prior written authorization by County.