Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Appears in 2 contracts
Samples: Office Lease (Blackline, Inc.), Office Lease (Blackline, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Appears in 2 contracts
Samples: Office Lease (Blackline, Inc.), Office Lease (Blackline, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:: [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
(i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
(ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
(iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.
Appears in 2 contracts
Samples: Office Lease (Blackline, Inc.), Office Lease (Blackline, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., i.e. tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s 's work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-back- charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “"anchoring” " of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s 's Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. Good housekeeping rules and regulations will be strictly enforced. The building office and engineering department will do everything possible to make your job easier. However, contractors who do not observe the construction policy will not be allowed to perform within this building. The cost of repairing any damages that are caused by Tenant or Tenant's contractor during the course of construction shall be deducted from Tenant's Allowance or Tenant's Security Deposit, as appropriate. LANDLORD: TENANT: GALLERIA PARK PARTNERS, LLC, SIZZLER INTERNATIONAL, INC., a Delaware limited liability company a Delaware corporation By: XXXXXXX, XXXXXX AND COMPANY, a California corporation, its agent By: /s/ Xxxxxxx Xxxxx By: /s/ Xxxxxxx X. Xxxxx ----------------------------- ----------------------------------- Xxxxxxx Xxxxx, Vice President Signer's Name: Xxxxxxx X. Xxxxx Dated: 7/17/01 -------------------- ----------------------------- [ ] President [X] Vice President or [ ] Chief Executive Officer (Check Title Above) and By: /s/ A. Xxxxx Xxxx ----------------------------------- Signer's Name: A. Xxxxx Xxxx -------------------- [ ] Secretary [ ] Treasurer or [X] Chief Financial Officer (Check Title Above) Dated: 7/9/01 -------------------------------- B1-3 EXHIBIT C RULES AND REGULATIONS BUILDING RULES AND REGULATIONS
Appears in 1 contract
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s 's work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.. Encino Terrace / Research Solutions, Inc. / MK / December 29, 2016 ____ ____ ____ ____ Initial Initial Initial Initial
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s 's Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. DXXXXXX EXXXXX 2014, LLC, a Delaware limited liability company RESEARCH SOLUTIONS, INC., a Nevada corporation By: Dxxxxxx Exxxxx Management, Inc., By: /s/ Axxx Xxxxx a Delaware corporation, its Manager Name: Axxx Xxxxx Title: CFO By: /s/ Axxxxx X. Xxxxxxx Axxxxx X. Xxxxxxx, Dated: 12-30-2016 Senior Vice President Dated: 12/30/16 Encino Terrace / Research Solutions, Inc. / MK / December 29, 2016 ____ ____ ____ ____ Initial Initial Initial Initial
Appears in 1 contract
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., i.e. tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.. EXHIBIT B-1 CONSTRUCTION BY TENANT DURING TERM
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s 's work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “"anchoring” " of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s 's Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures fixtures, and air conditioning grilles shall be saved and turned over to the Building Engineer.. GOOD HOUSEKEEPING RULES AND REGULATIONS WILL BE STRICTLY ENFORCED. THE BUILDING OFFICE AND ENGINEERING DEPARTMENT WILL DO EVERYTHING POSSIBLE TO MAKE YOUR JOB EASIER. HOWEVER, CONTRACTORS WHO DO NOT OBSERVE THE CONSTRUCTION POLICY WILL NOT BE ALLOWED TO PERFORM WITHIN THIS BUILDING. THE COST OF REPAIRING ANY DAMAGES THAT ARE CAUSED BY TENANT OR TENANT'S CONTRACTOR DURING THE COURSE OF CONSTRUCTION SHALL BE DEDUCTED FROM TENANT'S ALLOWANCE OR TENANT'S SECURITY DEPOSIT, AS APPROPRIATE. LANDLORD: TENANT: XXXXXXX XXXXXX JOINT VENTURE, THE XXXXXXXXX CAPITAL GROUP, LLC. a California general partnership a California limited liability company By: XXXXXXX, XXXXXX AND COMPANY, its agent By: /s/ Xxxxxxx Xxxxxx By: /s/ Xxxxxx X. Xxxxxxxxx ---------------------------------- -------------------------------- Xxxxxxx Xxxxxx ` Signer's Name: XXXXXX X. Xxxxxxxxx [X] President [ ] Vice President or [ ] Chief Executive Officer Dated: 4/27/00 (Check Title Above) AND By:________________________________ Signer's Name:_____________________ [ ] Secretary [ ] Treasurer or [ ] Chief Financial Officer (Check Title Above) AFFIX CORPORATE SEAL HERE GUARANTOR: /s/ Xxxxxx X. Xxxxxxxxx ---------------------------------- Xx. Xxxxxx X. Kriegsman, an individual Dated: April 20,2000 EXHIBIT C RULES AND REGULATIONS BUILDING RULES AND REGULATIONS
Appears in 1 contract
Samples: Office Lease (Cytrx Corp)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.. Initial Initial
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.. Initial Initial
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. XXXXXXX XXXXXX 1995, LLC, a Delaware limited liability company TRUECAR, INC., a Delaware corporation By: By: Xxxxxxx Xxxxxx Management, Inc., Name: a Delaware corporation, its Manager Title: Xxxxxx X. Xxxxxxx, Dated: Dated: By: Name: Title: Dated: Initial Initial (“Agreement”) Owner: Xxxxxxx Xxxxxx 1995, LLC c/o Douglas Xxxxxx Management, LLC Director of Property Management 000 Xxxxxxxx Xxxxxxxxx, Xxxxx 000 Xxxxx Xxxxxx, Xxxxxxxxxx 00000 Contractor:
Appears in 1 contract
Samples: Office Lease (TrueCar, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., i.e. tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up cleanup will be conducted by the building janitors and the general contractor will be back-charged backcharged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PMa.m. - 6:00 p.m., Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PMa.m. - 6:00 p.m., Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.;
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.; and
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(ji) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.. XXXXXXX XXXXXX 2000, LLC, a Delaware limited liability company REACHLOCAL, INC. a Delaware corporation By: XXXXXXX, XXXXXX AND COMPANY, a California corporation, By: /s/ Xxxxx Xxxxxx its agent Name: Xxxxx Xxxxxx Title: President & CEO By: /s/ Xxxxxxx X. Means Xxxxxxx X. Means, Senior Vice President Dated: 9/5/06 By: Name: Title: Dated: August 30, 2006
Appears in 1 contract
Samples: Office Lease (ReachLocal Inc)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-back charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-air balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.. XXXXXXX XXXXXX 1995, LLC,a Delaware limited liability company ZIPRECRUITER, INC.,a Delaware corporation By: Xxxxxxx Xxxxxx Management, Inc., By: /s/ Xxx Xxxxxx a Delaware corporation, its Manager Name: Xxx Xxxxxx Title: CEO By: /s/ Xxxxxxx X. Means Date: 6/9/14 Xxxxxxx X. Means Senior Vice President By: Dated 6-10-2014 Name: Title: Date:
Appears in 1 contract
Samples: Office Lease (Ziprecruiter, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. XXXXXXX XXXXXX 2008, LLC, BLACKLINE SYSTEMS, INC., a Delaware limited liability company a California corporation By: Xxxxxxx Xxxxxx Management, Inc., By: /s/ Xxxxxx Xxxxxx-Xxxxxx a Delaware corporation, its Manager Name: Xxxxxx Xxxxxx-Xxxxxx Title: Chief Legal and Administrative Officer By: /s/ Xxxxxx Xxxxxxx Dated: May 15, 2017 Xxxxxx Xxxxxxx Senior Vice President Dated: 5/18/17 Owner: Xxxxxxx Xxxxxx , LLC c/o Douglas Xxxxxx Management, LLC Director of Property Management 000 Xxxxxxxx Xxxxxxxxx, Xxxxx 000 Xxxxx Xxxxxx, Xxxxxxxxxx 00000 Contractor: Re: (the “Real Property”) The undersigned (referred to herein as “Contractor”) has been engaged by (“Tenant”) to perform work (the “Work”) in or on the above referenced Real Property, which is owned by Xxxxxxx Xxxxxx , LLC, a Delaware limited liability company (“Owner”), and managed by Owner’s duly authorized agent, Xxxxxxx Xxxxxx Management, LLC, a Delaware limited liability company (“Manager”). Contractor acknowledges and agrees that Contractor has reviewed and shall comply with the “Construction Policies” that are a part of the [Tenant Work Letter] attached as Exhibit to the Lease. Contractor also agrees that Contractor shall, and shall cause its subcontractors, agents and employees to (a) perform the Work and enter and exit the Real Property, elevators, and parking facilities in a manner that will not disturb any other tenants, subtenants or other occupants of the Real Property or any of their employees, officers or invitees; (b) engage in any demolition, anchoring of walls or supports, drilling, or conduct any other aspect of planning or construction or operate any equipment in Tenant’s premises or any other part of the Real Property that may cause excessive noise, dust, vibrations or odors only during such hours as approved in writing in advance by Owner or Manager and only in the manner prescribed in writing by Owner or Manager; (c) comply with the Construction Policies or any written guidelines or instructions delivered to Contractor from Owner or Manager regarding performance of the Work; and (d) comply with applicable laws. Contractor understands and agrees that, prior to Contractor commencing the Work, Owner requires Contractor to provide the Landlord Parties (as hereinafter defined) with certain protections and that such protections are a material inducement to Owner’s consent to allowing Contractor to perform the Work at the Real Property. Accordingly, Contractor hereby agrees to and/or shall comply with the following:
1. Contractor shall indemnify and hold harmless Owner and Manager and their respective affiliates, members, interest holders, managing members, officers, directors, partners, employees, agents, predecessors, successors and assigns (hereinafter collectively referred to as “Landlord Parties” and individually a “Landlord Party”) from and against all liabilities, claims, damages, losses, liens, causes of actions, judgments, costs and expenses, of whatever kind or nature, including without limitation, bodily injury or death (whether or not those injured or deceased are performing work under this Agreement or are affiliated with the parties hereto), property damage, costs of litigation (including, without limitation, actual attorneys’ fees and costs) (collectively, “Claims”) arising out of or resulting from (1) the failure of Contractor or any of its subcontractors, employees or agents to comply with the requirements set forth in clauses (a), (b), (c) or (d) above; or any other obligation of Contractor under this Agreement, (2) the negligent acts or omissions of Contractor, its owners, agents, servants, employees, or subcontractors, or (3) the Work performed by Contractor. This indemnification obligation shall not be limited in any way by any limitation on the amount or types of damages, compensation, or benefits payable by or for Contractor or its subcontractors under workers compensation or disability laws. Contractor’s duty to indemnify shall include and extend to (i) situations in which Contractor has been negligent in the screening, hiring and training of its employees, contractors and subcontractors, said negligence of which causes liability in which any Landlord Party is alleged to be responsible for any Claims arising out of such negligent screening, hiring or training; and (ii) Claims for labor performed, equipment, tools, supplies or materials used or furnished in the performance of Contractor’s services, including any costs and expenses incurred in the defense of such Claims and any damages to any Landlord Party resulting from such Claims.
2. Contractor agrees after written demand to immediately cause the effect of any suit or lien to be removed from the Real Property and in the event Contractor shall fail to do so, Owner is authorized to use whatever means in its discretion it may deem appropriate to cause said lien or suit to be removed or dismissed and the costs thereof, together with attorneys’ fees shall be immediately due and payable by Contractor to Owner. In the event a suit is brought against any Landlord Party or if any Landlord Party is named as a defendant in any suit against Contractor or Tenant, Contractor shall, at the option of Owner in Owner’s sole discretion, defend the Landlord Parties with counsel selected by Contractor and acceptable to Owner, in Owner’s reasonable discretion. Contractor shall pay any and all costs and expenses in connection therewith as well as all additional costs and expenses incurred in such suit, including without limitation, professional fees such as expert fees, and/or appraisers’ and accountants’ fees, and will pay and satisfy any such claim, lien, or judgment as may be established by the decision of the court in such suit. Contractor may litigate any such lien or suit provided Contractor causes the effect thereof to be removed from the Real Property promptly in advance.
3. Contractor shall promptly pay all indebtedness incurred in Contractor’s performance of the Work. Should any lien or charge attach to the Real Property by reason of Contractor’s failure to pay such indebtedness, Contractor shall promptly procure the release of any such lien or charge and shall indemnify, defend (with counsel reasonably approved by Owner) and hold the Landlord Parties harmless from all loss, cost damage or expense incidental thereto.
4. If at any time there should be evidence of any lien or claim for which Owner or Manager is or might become liable, or for which the Real Property is, or might become subject to and which is chargeable to Contractor or any of its subcontractors, after allowing Contractor thirty (30) days to remove such lien, Owner or Manager shall have the right to retain out of any amounts due Contractor (as in for example, disbursements of any tenant improvement allowance), which shall be above and beyond any retention amounts, an amount sufficient to clear the lien or claim and completely indemnify the Landlord Parties against such lien or claim along with all associated costs, which shall in no way serve as an election of remedies by Owner or Manager. Contractor may obtain possession of the retained amount, provided that Contractor (a) posts a bond or other security in an amount sufficient to fully indemnify the Landlord Parties against the lien or claim, and (b) obtains Owner or Manager’s approval as to the adequacy and quality of the bond or security, which Owner or Manager shall not unreasonable withhold. The cost of any such bond shall be borne by Contractor.
5. Contractor shall not take and is not authorized to take any action in the name of or otherwise on behalf of Owner or Manager which would violate any applicable law. If Contractor knowingly performs any Work or engages in any other activities contrary to applicable law, Contractor shall bear any and all additional costs resulting therefrom, including, but not limited to, the costs of correcting the Work or repairing the Real Property to comply with such law and the cost of fully indemnifying the Landlord Parties from all violations.
6. Contractor shall immediately cause all Landlord Parties to be released from any liability or penalty which may be imposed on Contractor, its employees, agents or subcontractors by reason of any alleged violation or violations of applicable law by Contractor in performance of the Work.
7. Contractor waives any right to consequential, special or indirect damages or loss of anticipated profits, except for acts of gross negligence or intentional misconduct by Owner or Manager. Notwithstanding anything else contained herein to the contrary, Contractor shall look solely to Owner’s interest in the Real Property and any proceeds from a sale of the Real Property that actually remain undistributed, for satisfaction of any liabilities or obligations of Owner under this Agreement. No Landlord Party shall be personally liable for any such liabilities or obligations whatsoever.
8. If litigation is instituted between Owner and Contractor, the cause for which arises out of or in relation to this Agreement, the prevailing party in such litigation shall be entitled to receive its costs (not limited to court costs), expenses and reasonable attorneys’ fees from the non-prevailing party as the same may be awarded by the court. It is expressly understood and agreed that the foregoing provisions shall survive the termination or expiration of any agreement between Contractor and Tenant. ALL OF THE ABOVE TERMS ARE AGREED TO AND ACKNOWLEDGED BY: Signature Company Name Title Xxxxxx Xxxxxxx Xxxx Xxxx, Xxxxx, Xxx The Base, Shell and Core of Ninth Floor Expansion Premises shall be structurally sound and in good working order. To the extent there is any conflict between the terms of this Base, Shell and Core definition and the terms of the Lease, as amended, the terms of the Lease, as amended, shall govern.
1. Men’s and Women’s restrooms to be provided.
2. Landlord to provide all required step down transformers and panel boards within the Building’s electrical closets for distribution of the power requirement set forth in the Lease. Tenant, at its own cost and expense shall have the right to install additional electrical power capacity of electrical power capacity (including panels and transformers), if needed, subject to Landlord’s prior review and written approval of the plans and specifications for the same;
3. Adequate capacity for Code required egress lighting and exit lighting.
4. The Building’s main duct loop(s) to be properly insulated with aluminum foil facing, with return air and smoke and fire dampers as required by Code.
5. The noise levels within the Ninth Floor Expansion Premises shall not exceed NC 35.
6. Landlord to provide sprinkler protection consisting of mains, laterals and uprights installed, at a minimum, in numbers according to Code for unoccupied space.
7. Building fire protection and fire/life safety alarm and communication system installed according to Code as of the date the Building was certified for occupancy.
8. Life safety infrastructure including panels and power sources. Landlord to provide adequate electrical capacity within the Building’s fire alarm system to provide for Tenant’s fire life safety requirements on each floor of the Ninth Floor Expansion Premises, subject to Landlord’s review of Tenant’s Plans and Specifications.
9. All hazardous materials removed or encapsulated in compliance with Code.
10. Illuminated exit signage at stairwells as required by Code.
11. All exterior windows (including, without limitation, all panels) in the Ninth Floor Expansion Premises, and all window coverings and treatments for such windows in the Ninth Floor Expansion Premises, shall be delivered in good condition and working order.
Appears in 1 contract
Samples: Office Lease (Blackline, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., i.e. tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side backside of each cover plate.. EXHIBIT B-1 (CONTINUED) CONSTRUCTION BY TENANT DURING TERM
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end DOORS SHUT AT THE END of each day’s 's work. Any electrical closet that is opened with the panel exposed must have a work person present.PRESENT
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, . a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “"anchoring” " of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6 00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s 's Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. GOOD HOUSEKEEPING RULES AND REGULATIONS WILL BE STRICTLY ENFORCED. THE BUILDING OFFICE AND ENGINEERING DEPARTMENT WILL DO EVERYTHING POSSIBLE TO MAKE YOUR JOB EASIER. HOWEVER, CONTRACTORS WHO DO NOT OBSERVE THE CONSTRUCTION POLICY WILL NOT BE ALLOWED TO PERFORM WITHIN THIS BUILDING. THE COST OF REPAIRING ANY DAMAGES THAT ARE CAUSED BY TENANT OR TENANT'S CONTRACTOR DURING THE COURSE OF CONSTRUCTION SHALL BE DEDUCTED FROM TENANT'S ALLOWANCE OR TENANT'S SECURITY DEPOSIT, AS APPROPRIATE. LANDLORD: TENANT: DOUGXXX XXXEXX XXXLTY FUND 1997, STAN XXX XXXIA, INC., a California limited partnership a Delaware corporation By: DOUGXXX, XXXXXX & XOMPANY, By: /s/ GILL CHAMPION ---------------------------- Signer's Name: I By: /s/ KENNXXX XXXXXX [ ] President [X]Vice President or [ ] Chief Executive Officer ------------------------------------ ( Check Title Above) Kennxxx Xxxxxx and Dated: By: /s/ STEPXXX X. XXXXXX --------------------------- Signer's Name: [ ] Secretary [X] Treasurer or [ ] Chief Financial Officer (Check Title Above) AFFIX CORPORATE SEAL HERE. Dated: /s/ STAN XXX ----------------------- Stan Xxx, xx individual Date: EXHIBIT C RULES AND REGULATIONS BUILDING RULES AND REGULATIONS 1 Access. Tenant and/or Tenant's agents, clients, contractors, directors, employees, inductees, licensees, officers, partners or shareholders shall only use the sidewalks, entrances, lobby(ies), garage(s), elevators, stairways, and public corridors as a means of ingress and egress, and shall take such actions as may reasonably be necessary to ensure that the same remain unobstructed at all times. The entrance and exit doors to the Premises are to be kept closed at all times except as required for orderly passage to and from the Premises. Except on balconies available for the joint or exclusive use of Tenant as otherwise specified hereinabove, Tenant shall not permit its agents, clients, contractors, directors, employees, invitees, licensees, officers, partners or shareholders to loiter in any part of the Building or obstruct any means of ingress or egress. Tenant shall not cover any doors, and shall not cover any window, other than with vertical or mini-blinds pre-approved in writing by Landlord. Landlord specifically disapproves the installation of any film or foil covering whatsoever on the windows of the Premises. Neither Tenant, nor its agents, clients, contractors, directors, employees, invitees, licensees, officers, partners or shareholders shall go up on the roof or onto any balcony serving the Building, except upon such roof, portion thereof, or balcony as may be contiguous to the Premises and is designated in writing by Landlord as a roof-deck, roof-garden area, or exclusive use balcony area.
Appears in 1 contract
Samples: Office Lease (Stan Lee Media Inc)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s 's work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s 's Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. XXXXXXX XXXXXX 1993, LLC, a Delaware limited liability company By: Xxxxxxx Xxxxxx Management, LLC, a Delaware limited liability company, its Agent By: Xxxxxxx Xxxxxx Management, Inc., a Delaware corporation, its Manager By: /s/ Xxxxxxx X. Means Xxxxxxx X. Means, Senior Vice President Dated: August 9, 2011 BIOSIG TECHNOLOGIES, INC., a Delaware corporation By: /s/ Xxxxxxx Londoner Name: Xxxxxxx Londoner Title: Chairman and CEO Dated: August 9, 2011 By:__________________________________ Name:________________________________ Title:_________________________________ Dated:________________________________
Appears in 1 contract
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. DXXXXXX EXXXXX 2000, LLC, a Delaware limited liability company REACHLOCAL, INC., a Delaware corporation By: Dxxxxxx Exxxxx Management, LLC, a Delaware limited liability company, its Agent By: Name: Title: /s/ Rxxx X. Xxxxxxxxx Rxxx X. Xxxxxxxxx CFO By: Dxxxxxx Exxxxx Management, Inc., a Delaware corporation, its Manager Dated: August 31, 2010 By: /s/ Mxxxxxx X. Means By: Mxxxxxx X. Means, Senior Vice President Name: Dated: September 2, 2010 Title: Dated: Mxxxxxxx & Fxxxxxxx LLP 500 Xxxx Xxxxx Xxxxxx, Xxxxx 0000 Xxx Xxxxxxx, XX 00000 Attention: Txxxxx X. Xxxxxx, Esq. THIS AGREEMENT made September 2, 2010, between EUROHYPO AG, New York Branch, as Administrative Agent on behalf of a syndicate of lenders (collectively, the “Lenders”), having an office at 1000 Xxxxxx xx xxx Xxxxxxxx, Xxx Xxxx, Xxx Xxxx 00000 (the “Mortgagee”), and having an office at (the “Tenant”);
Appears in 1 contract
Samples: Office Lease (ReachLocal Inc)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer. DXXXXXX EXXXXX 1997, LLC, a Delaware limited liability company RXXXXX PHARMACEUTICALS, INC., a Delaware corporation By: Dxxxxxx Exxxxx Management, Inc., By: /s/ Axxxxx Xxxxxx a Delaware corporation, its Manager Name: Axxxxx Xxxxxx Title: President By: /s/ Mxxxxxx X. Means Mxxxxxx X. Means, Senior Vice President Dated: 6/26/13
Appears in 1 contract
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.,
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours bouts during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also also. be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.. XXXXXXX XXXXXX 1995, LLC, XXX.XXX INC. a Delaware limited liability company a Delaware corporation By: Xxxxxxx Xxxxxx Management, LLC By: a Delaware limited liability company, Name: its Agent Title: By: Xxxxxxx Xxxxxx Management, Inc. a Delaware corporation, its Manager Dated: By: Xxxxxxx X. Means, Senior Vice President By: Name: Dated: Title: Dated:
Appears in 1 contract
Samples: Lease Agreement (TrueCar, Inc.)
Construction Requirements. (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., i.e. tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required.
(b) Electric panel schedules must be brought up to date identifying all new circuits added.
(c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate.
(d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present.
(e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service.
(f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times.
(g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 AM - 6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend.
(i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor:
i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid.
ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION.
iii) The Building Engineer will inspect the construction on a periodic basis as well.
(j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.. BRIGHTON ENTERPRISES, LLC, a California limited liability company MERCANTILE NATIONAL BANK, N.A., a California “C” corporation_________ By: DXXXXXX, XXXXXX AND COMPANY, a California corporation, its agent By: By: Mxxxxxx X. Means, Vice President Its: Dated: By: Its: Dated: EXHIBIT C RULES AND REGULATIONS