Construction Requirements. During the construction phases of the pipeline projects, the DEVELOPER and/or its construction contractor(s) shall: (1) Provide its own on-site inspection and observation by a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction to ensure it is built according to the plans and specifications. (2) Obtain all necessary Right-of-Way Use Permits. (3) Be responsible for supervising and inspecting the construction of the pipeline projects and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- way lines, and field measurements associated with such construction. (4) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects until the improvements are completed and accepted by the COUNTY or FDOT, as applicable, which acceptance shall not be unreasonably withheld. (5) Require testing by an independent laboratory, acceptable to the COUNTY and FDOT in accordance with the FDOT’S standards and Pasco County Engineering Services Department's testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY Engineer immediately, and all test reports shall be provided on a quarterly basis to the COUNTY Engineer. (6) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and other road improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S., and by the COUNTY. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and FDOT. (7) Provide to the COUNTY and FDOT copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicable, and such information shall become the property of the COUNTY and/or FDOT upon submission. All plans submitted to the COUNTY shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack. (8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 3 contracts
Samples: Development Agreement, Development Agreement, Development Agreement
Construction Requirements. During the construction phases phase of the pipeline projectsapplicable segment of the Roadway Improvements, the DEVELOPER and/or its construction contractor(s) Developer shall:
(1i) Provide its own on-site inspection and observation by a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction to ensure make sure it is built according to the plans and specifications.
(2ii) Obtain all necessary Right-of-Way Use Permits.
(3iii) Be responsible for supervising and inspecting the construction of the pipeline projects Roadway Improvements and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- way lines, and field measurements associated with such construction.
(4iv) Be responsible for full and complete performance of all construction activities required pursuant to this DAAgreement. The DEVELOPER Developer shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects Roadway Improvements until the improvements they are completed and accepted by the COUNTY County or FDOT, as applicable, FDOT which acceptance shall not be unreasonably withheld.
(5v) Require testing by an independent laboratorylab, acceptable to FDOT (for S.R. 56) and the COUNTY and FDOT County in accordance with FDOT standards (for S.R. 56) and the FDOT’S standards and Pasco County Engineering Services Department's Department testing specifications for construction of roads, stormwater drainage, storm drainage and utilities as applicableutilities. Any failed tests shall be reported to FDOT (for S.R. 56) and the COUNTY County Engineer immediately, and all test reports shall be provided on a quarterly basis to the COUNTY County Engineer.
(6) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and other road improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S., and by the COUNTY. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and FDOT.
(7vi) Provide to FDOT (for S.R. 56) and the COUNTY and FDOT County copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicableRoadway Improvements, and such information shall become the property of FDOT and the COUNTY and/or FDOT County upon submissionacceptance of the applicable roadway. All plans submitted to FDOT and the COUNTY County shall include reproducible Mylars™ mylars and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPackAutoCadd.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 2 contracts
Samples: Roadway Development Agreement, Roadway Development Agreement
Construction Requirements. During the construction phases phase of the pipeline projectsRequired Roadway Improvements, the DEVELOPER and/or its construction contractor(s) shall:
(1) Provide its own on-site inspection and observation by under the direction of a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction the progress and quality of the work and to ensure that it is built constructed according to the plans plans, contract documents, and specifications.
(2) Obtain all necessary Right-of-Way Use Permits.
(3) Be responsible for supervising and inspecting the construction of the pipeline projects Required Roadway Improvements and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- of-way lines, and field measurements associated with such construction.
(4) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects Required Roadway Improvements until the improvements are completed and accepted by the COUNTY or FDOT, as applicableCOUNTY, which acceptance shall not be unreasonably withheld.
(5) Require testing by an independent laboratory, acceptable to the COUNTY and FDOT in accordance with the FDOT’S standards and Pasco County COUNTY Engineering Services Department's testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY Engineer immediately, and all test reports shall be provided on a quarterly basis to the COUNTY Engineer.
(6) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and Required Roadway Improvements other road improvements are in substantial conformance with the standards established by the FDOT Florida Department of Transportation (FDOT) pursuant to Section 336.045, F.S.F.S.Florida Statutes, and by the COUNTY. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and FDOTCOUNTY.
(7) Provide to the COUNTY and FDOT copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicableRequired Roadway Improvements, and such information shall become the property of the COUNTY and/or FDOT upon submission. All plans submitted to the COUNTY shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 1 contract
Samples: Development Agreement
Construction Requirements. During the construction phases of the pipeline projectsRoadway Improvements, the DEVELOPER and/or its construction contractor(s) Developer shall:
(1) Provide its own on-site inspection and observation by a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction to ensure it is built according to the plans and specificationsspecifications (CEI). Such professional engineer shall be approved by the County.
(2) Obtain all necessary Right-of-Way Use PermitsPermits from the County.
(3) Be responsible for supervising and inspecting the construction of the pipeline projects Roadway Improvements and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- of-way lines, and field measurements associated with such construction.
(4) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER Developer’s contractor shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects Roadway Improvements until the improvements are completed com- pleted and accepted by the COUNTY or FDOT, as applicableCounty, which acceptance shall not be unreasonably withheld.
(5) Require testing by an independent laboratory, acceptable to the COUNTY and FDOT County in accordance with the FDOT’S standards and Pasco County Engineering Services Department's testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY County Engineer or designee immediately, and all test reports shall be provided on a quarterly basis to the COUNTY EngineerCounty Engineer or designee.
(6) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and other road improvements Roadway Improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S., and by the COUNTYCounty. The said Said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and FDOTCounty.
(7) Provide to the COUNTY and FDOT County copies of all design drawings, as-built drawings, permits and permits post-construction permit close-outs/satisfactions received for the pipeline projectsRoadway Improvements, as applicable, and such information shall become the property of the COUNTY and/or FDOT County upon submission. All plans submitted to the COUNTY County shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 1 contract
Samples: Development Agreement
Construction Requirements. During the construction phases phase of the pipeline projectsRequired Roadway Improvements, the DEVELOPER and/or its construction contractor(s) shall:
(1a) Provide its own on-site inspection and observation by under the direction of a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction the progress and quality of the work and to ensure that it is built constructed according to the plans plans, contract documents, and specifications.
(2b) Obtain all necessary Right-of-Way Use Permits.
(3c) Be responsible for supervising and inspecting the construction of the pipeline projects Required Roadway Improvements and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- of-way lines, and field measurements associated with such construction.
(4d) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects Required Roadway Improvements until the improvements are completed and accepted by the COUNTY or FDOT, as applicable, which acceptance shall not be unreasonably withheld.
(5e) Require testing by an independent laboratory, acceptable to the COUNTY and or FDOT (as applicable) in accordance with the FDOT’S standards and Pasco County COUNTY Engineering Services Department's or FDOT’S (as applicable) testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY Engineer or FDOT (as applicable) immediately, and all test reports shall be provided on a quarterly basis to the COUNTY EngineerEngineer or FDOT (as applicable).
(6f) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and Required Roadway Improvements other road improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S.Florida Statutes, and by the COUNTY, as applicable. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and or FDOT.
(7g) Provide to the COUNTY and or FDOT (as applicable) copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicableRequired Roadway Improvements, and such information shall become the property of the COUNTY and/or or FDOT (as applicable) upon submission. All plans submitted to the COUNTY or FDOT (as applicable) shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 1 contract
Samples: Development Agreement
Construction Requirements. During From the date of this DA, during the construction phases phase of the pipeline projectsXX Xxxxxxx West Improvements, the each DEVELOPER and/or its construction contractor(s) shallshall do the following as to their respective Phase:
(1) Provide its own on-site inspection and observation by under the direction of a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction the progress and quality of the work and to ensure that it is built constructed according to the plans plans, contract documents, and specifications.
(2) The Construction Engineering and Inspection (CEI) contractor shall be approved by the COUNTY.
(3) Obtain all the necessary Right-of-Way Use PermitsPermit(s) from the FDOT, if applicable.
(34) Be responsible for supervising and inspecting the construction of the pipeline projects XX Xxxxxxx West Improvements and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- of-way lines, and field measurements associated with such construction.
(45) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER DEVELOPER’S contractor shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects XX Xxxxxxx West Improvements until the improvements are completed and accepted by the COUNTY or FDOT, as applicable, which acceptance shall not be unreasonably withheld.
(56) Require testing by an independent laboratory, acceptable to the COUNTY and FDOT or FDOT, as applicable, in accordance with the FDOT’S standards and Pasco County COUNTY Engineering Services Department's or FDOT, as applicable, testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY Engineer immediatelyor FDOT, as applicable, immediately and all test reports shall be provided on a quarterly basis to the COUNTY EngineerEngineer or FDOT, as applicable.
(67) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects and other road improvements XX Xxxxxxx West Improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S.Florida Statutes, and by the COUNTY, as applicable. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and or FDOT.
(7) 8) Provide to the COUNTY and FDOT or FDOT, as applicable, copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicableXX Xxxxxxx West Improvements, and such information shall become the property of the COUNTY and/or FDOT upon submission. All plans submitted to the COUNTY or FDOT, as applicable, shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 1 contract
Samples: Development Agreement
Construction Requirements. During the construction phases phase of the pipeline projectsXxxxxx Road Pipeline Project, the DEVELOPER and/or its construction contractor(s) shall:
(1) Provide its own on-site inspection and observation by a professional engineer registered in the State of Florida for the purpose of observing and inspecting all construction to ensure it is built according to the plans and specifications.
(2) Obtain all necessary Right-of-Way Use Permits.
(3) Be responsible for supervising and inspecting the construction of the pipeline projects Xxxxxx Road Pipeline Project and shall be responsible for ensuring the accuracy of all reference points, grade lines, right-of- of-way lines, and field measurements associated with such construction.
(4) Be responsible for full and complete performance of all construction activities required pursuant to this DA. The DEVELOPER shall be responsible for the care and protection of any materials provided or work performed for the pipeline projects Xxxxxx Road Pipeline Project until the improvements are completed and accepted by the COUNTY or FDOTCOUNTY, as applicable, which acceptance shall not be unreasonably withheld.
(5) Require testing by an independent laboratory, acceptable to the COUNTY and FDOT in accordance with the FDOT’S standards and Pasco County COUNTY Engineering Services Department's testing specifications for construction of roads, stormwater drainage, and utilities as applicable. Any failed tests shall be reported to the COUNTY Engineer immediately, and all test reports shall be provided on a quarterly basis to the COUNTY Engineer.
(6) Provide a certification from a professional engineer registered in the State of Florida which shall certify that all designs, permits, and construction activities for the pipeline projects Xxxxxx Road Pipeline Project and other road improvements are in substantial conformance with the standards established by the FDOT pursuant to Section 336.045, F.S., and by the COUNTY. The said certification shall conform to the standards in the industry and be in a form acceptable to the COUNTY and FDOTCOUNTY.
(7) Provide to the COUNTY and FDOT copies of all design drawings, as-built drawings, and permits received for the pipeline projects, as applicableXxxxxx Road Pipeline Project, and such information shall become the property of the COUNTY and/or FDOT upon submission. All plans submitted to the COUNTY shall include reproducible Mylars™ and electronic files compatible with AutoCADD. All plans submitted to the FDOT shall include reproducible Mylars™ and electronic files compatible with MicroStation and GeoPack.
(8) Provide to the COUNTY, on a quarterly basis, copies of the inspection reports submitted to the FDOT.
Appears in 1 contract
Samples: Development Agreement