Construction Staking. Developer shall, at Developer’s sole expense, furnish all construction points, stakes, and instructions necessary to control the horizontal and vertical placement of all facilities to be constructed by Developer pursuant to the Contract Documents. Construction points, stakes and instructions to be provided by Developer shall meet the following minimum requirements: A. Water Extension 1. Horizontal location of all water mains at 50 foot stations offset 10 feet from the water main locations. 2. Two directional 10 foot offsets to locate all pipe intersections, cast iron bends, valves, hydrants, blow off assemblies, and air and vacuum assemblies. 3. A stake at the edge of the public right-of-way or easement adjacent the water main marking the horizontal locations of all water service meter box assemblies. 4. Sufficient horizontal and vertical reference marks to accurately locate and construct all other water facilities and structures such as pressure reducing stations.
Appears in 5 contracts
Samples: Developer Extension Agreement, Developer Extension Agreement, Developer Extension Agreement