Control House Sample Clauses

Control House. Three (3) new control panels will be installed in the west end of the control house. The new AC supply cable to GCB 6050 will come from a single pole 30A breaker on AC Dist Panel C.
Control House. Not applicable.
Control House. Existing to be expanded to accommodate additional new protective relaying panels per design. Control Enclosure: New 1st Line Relay Panel & DC Panel Room #2 and new 2nd Line Relay Panel & DC Panel Room #2 to be constructed to accommodate the new protective relaying panels per SUF design. The minimum required auxiliary systems, such as fire detection/notification, alarms, security, HVAC, heating, lighting, and receptacles shall be installed for both new relay rooms in the control enclosure. No spare equipment considerations nor future expansion considerations shall be required in the design or construction of the new control enclosure.
Control House. X 24’ building will be designed, constructed and built by NorthWestern Energy. ➢ A VT Junction Box will be installed for the metering set with dual secondary windings. One winding is to be used for metering and one winding is to be used for line relaying. ➢ Conduit and control cable will be installed from NWE’s control house to ▪ One PCB ▪ One VT junction box ▪ Station Power Transformer
Control House. ➢ 16’ x 24’ Control House ➢ NorthWestern Energy will procure, install, and own the Control House.