CONTROL PANEL FACTORY TEST Sample Clauses

CONTROL PANEL FACTORY TEST. (OBSERVE) The gas turbine control panels are manufactured at GE's Salem, Virginia plant. Components and modules such as electronic cards and page assemblies undergo extensive inspection and automated computer testing before they arrive at final assembly. All modules with back plane wiring are automatically machine wired and computer checked. After the components and modules are assembled in their parent panel, the equipment is made ready for final test and inspection. The major portions of this procedure include testing and checking of the following: - All final assembly wiring - Power distribution and supply systems - Input/output systems - Automated (PC based) hardware loop back-checks - System operation using test software - Customized requisition software checked in a "Software Test Bed" facility using permanent electronic modules for test - For a control panel installed in a control compartment, interfaces between generator control panel and other compartment systems. TURBINECONTRACTAPPENDIXA-11
AutoNDA by SimpleDocs

Related to CONTROL PANEL FACTORY TEST

  • Maximum Senior Leverage Ratio Borrower and its Subsidiaries on a consolidated basis shall have, at the end of each Fiscal Quarter set forth below, a Senior Leverage Ratio as of the last day of such Fiscal Quarter and for the 12-month period then ended of not more than the following:

  • Distribution Compliance Period The Purchaser agrees not to resell, pledge or transfer any Purchased Shares within the United States or to any U.S. Person, as each of those terms is defined in Regulation S, during the 40 days following the Closing Date.

  • Stability Testing Patheon may be requested to conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C to a Product Agreement. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within one Business Day, after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications, cGMPs, and Applicable Laws. Patheon will give Client ail stability test data and results at Client’s request.

  • Interest Factor With respect to this Floating Rate Note, accrued interest is calculated by multiplying the principal amount of such Note by an accrued interest factor. The accrued interest factor is computed by adding the interest factor calculated for each day in the particular Interest Reset Period. The interest factor for each day will be computed by dividing the interest rate applicable to such day by 360, in the case of a Floating Rate Note as to which the CD Rate, the Commercial Paper Rate, the Federal Funds Open Rate, the Federal Funds Rate, LIBOR or the Prime Rate is an applicable Interest Rate Basis, or by the actual number of days in the year, in the case of a Floating Rate Note as to which the CMT Rate or the Treasury Rate is an applicable Interest Rate Basis. In the case of a series of Notes that bear interest at floating rates as to which the Constant Maturity Swap Rate is the Interest Rate Basis, the interest factor for each day will be computed by dividing the number of days in the interest period by 360 (the number of days to be calculated on the base is of a year of 360 days with twelve 30-day months (unless (i) the last day of the interest period is the 31st day of a month but the first day of the interest period is a day other than the 30th or 31st day of a month, in which case the month that includes that last day shall not be considered to be shortened to a 30-day month, or (ii) the last day of the interest period is the last day of the month of February, in which case the month of February shall not be considered to be lengthened to a 30-day month)). The interest factor for a Floating Rate Note as to which the interest rate is calculated with reference to two or more Interest Rate Bases will be calculated in each period in the same manner as if only the applicable Interest Rate Basis specified above applied.

  • Acceptance Testing The MCP must have the capability to report all elements in the Minimum Data Set as set forth in the ODJFS Encounter Data Specifications and must submit a test file in the ODJFS-specified medium in the required formats prior to contracting or prior to an information systems replacement or update. Acceptance testing of encounter data is required as specified in Section 29(a)(v) of this Appendix.

  • NET INVESTMENT FACTOR The Net Investment Factor for any Subaccount as of the end of any Valuation Period is determined by dividing (1) by (2) and subtracting (3) from the result, where:

  • Acceptance Criteria a) The operational ground check, the engine performance check and the acceptance flight contemplated in clause 2.2, 2.3 and 2.4 shall be conducted using Airbus’ ISATM.

  • Aircraft Basic Price The Aircraft Basic Price is listed in Table 1 and is subject to escalation in accordance with the terms of this Purchase Agreement.

  • Total Net Leverage Ratio The Borrower will not permit the Total Net Leverage Ratio as of the end of any Fiscal Quarter to exceed 3.50 to 1.00.

  • Quality Control A. Controlled Affiliate agrees to use the Licensed Marks and Name only in connection with the licensed services and further agrees to be bound by the conditions regarding quality control shown in attached Exhibit A as they may be amended by BCBSA from time-to-time.

Time is Money Join Law Insider Premium to draft better contracts faster.