Test and Inspection Sample Clauses

Test and Inspection. 7.1 PI shall conduct incoming inspection of the WAFERS, by WAFER TYPE, to determine the WAFERS’ conformance to the COMMON SPECIFICATIONS. The PCM DATA specified in Section 6.5 is required for the incoming inspection of the WAFERS and the omission, inaccuracy or other defect in the PCM DATA will in itself be sufficient cause to reject the WAFERS. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the WAFERS supplied to PI subject to SUPPLIER’s warranty as defined in Section 11.1. All WAFERS passing the incoming inspection will be accepted by PI. 7.2 PI shall notify SUPPLIER which of the WAFERS have been accepted by PI within [***] ([***]) business days after receipt of the WAFERS by XX. Should PI fail to notify SUPPLIER within the said [***] ([***]) business days, the WAFERS shall be deemed to have been accepted by PI. PI will owe SUPPLIER payment only for the quantity of WAFERS that have been accepted by PI. 7.3 SUPPLIER shall not be held responsible for the defects and failures of the WAFERS which are attributable to the design, test and assembly by PI of the PRODUCTS. 7.4 SUPPLIER shall not be held responsible for the defects, failures and yield problems of the WAFERS if the WAFERS meet the specifications set forth in the COMMON SPECIFICATIONS. 7.5 SUPPLIER may make a written special waiver request to PI to ship WAFERS that do not comply with the COMMON SPECIFICATIONS. If PI approves such special waiver request in writing, which approval may include special terms and conditions, SUPPLIER may ship such non-complying WAFERS under such terms and conditions.
Test and Inspection. (a) By Toshiba. Toshiba will supply to NMI, with each Wafer shipment, ---------- process control monitor ("PCM") test results, actual Wafer sort data results, and visual quality inspection results as agreed by the parties. Toshiba will sort Wafers and "user repair" the DRAM module prior to shipment on the DRAM portions of the die.
Test and Inspection. 9.1 Testing equipment and personnel
Test and Inspection. 24.1 The Contractor shall at its own expense carry out at the place of manufacture and/or on the Site all such tests and/or inspections of the Plant and any part of the Facilities as are specified in the Contract.
Test and Inspection. SCE shall perform tests and inspections on the Material and Documentation within a reasonable time after receipt to determine compliance with the Agreement. Material and Documentation are deemed Accepted upon notice from SCE to Implementer.
Test and Inspection. 12.1 OKI shall conduct E-test and visual inspection according to the Common Specification before the delivery of the Wafers of the PI Products. 12.2 PI shall conduct incoming inspection according to the Common Specifications. This inspection shall be regarded as final in terms of quality, quantity and other conditions of the Wafers supplied to PI. 12.3 PI shall notify OKI of the result of the inspection within forty (40) days after the date of the relevant air way xxxx regarding shipment from OKI. Should PI fail to so notify within said forty (40) day period, the shipment lot shall be deemed to have been acceptable by PI. 12.4 If the Wafers failed the incoming inspection described in Section 12.2 above, PI shall notify OKI in writing the reason of such failure with the result as provided in Section 12.3 above. Both parties shall discuss to agree upon resolution thereof, including without limitation, replacement of the Wafers, and any other reasonable means. [*] IDENTIFIES REDACTED MATERIAL DELETED PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION 12.5 OKI shall not be held responsible for the defects and failures which are attributable to PI, including without limitation, the design, test or assembly by PI of the Wafers.
Test and InspectionThe Contractor shall maintain and control processes to inspect and test components as described in this SOW. These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product. The contractor shall conduct complete POP testing following final assembly in accordance with CDRL A003.
Test and Inspection. The soft drawn copper conductors shall be tested and inspected in accordance with the requirements of this specification, IEC 60502-1 and IEC 60228. It shall be the responsibility of the manufacturer to perform or to have performed the tests specified. The contractor shall have calibrated equipment’s by authorized party for inspection purposes IDECO cable consist of one to four XLPE insulated aluminum conductors, stranded around X.L.P.E – insulated aluminum alloy neutral (messenger). One of the insulated conductors in the main cables is intended for street lighting, while the main phase conductors (for main and service cables) vary from 16 to 120mm2, depending on the load currents, maximum acceptable voltage drop, and short –circuit currents required in the network. The size of the messenger (neutral conductor). Is determined by the mechanical and electrical conditions, the phase conductor is made of hard – drawn aluminum round stranded and compacts. The maximum length in each drum should be as follows: 4x185 mm2 500+10% , - 5% The tolerance in total length of the required lot in each purchase order is applicable to increase by 10%, and decreased by - 5%. Outer covering: Outer covering to be embossed with name of manufacturer followed by “ELECTRIC CABLES 600/1000 VOLTS AND IDECO TENDER NO 36/2022“as per IEC 60502, IEC60811 and BS. 5467. Electrical Requirements: There shall be no breakdown of PVC covering up to 6KV rms or 9KV D.C. a- The PVC covering of each of the samples subjected to the insulation test shall have a resistance at 20 Co not less than the equivalent of 5 MΩ for 1KM length.
Test and Inspection. All test and inspection results of the Company have provided to any government agency pursuant to any government contract or any subcontract or as a part of the delivery to the government of any article designed, engineered or manufactured by the Company were true, complete and correct. Except as set forth in Schedule 4.8(b), the Company has provided all test and inspection results to government agencies as required by law or pursuant to government contracts or subcontracts, or may have been required as part of the delivery of any article designed, engineered or manufactured by the Company.
Test and Inspection. 9.1 Testing Equipment and Personnel 9.1.1 As for the on-site material test conducted by the Contractor according to the Contract agreement or the Supervisor's instructions, the Contractor shall be provided with the test site, test personnel, test equipment and other necessary test conditions. If necessary, the Supervisor may use the site, test equipment and other test conditions provided by the Contractor to perform material review tests for Project quality inspection, and the Contractor shall provide assistance. ​ ​ ​ ​ ​ 9.1.2 The Contractor shall provide test equipment, sampling device, a test site and test conditions following the Special Terms of the Contract, and submit the corresponding mobilization schedule to the Supervisor. The test equipment configured by the Contractor should meet the requirements of the applicable test regulations and be tested by a qualified testing institute. The test equipment should be calibrated by the Supervisor and the Contractor prior to its use. 9.1.3 The Contractor shall submit to the Supervisor a list of test personnel, their positions, qualifications, and other certification Documents. The test personnel should be proficient in the performance of the inspection and tests, and the Contractor should take liability for the correctness of the test procedures and results performed by the test personnel.