Commercial Operation (i) On or before December 31, 2021, Interconnection Customer must demonstrate commercial operation of all generating units. Demonstrating commercial operation includes achieving Initial Operation in accordance with Section 1.4 of Appendix 2 to this ISA and making commercial sales or use of energy, as well as, if applicable, obtaining capacity qualification in accordance with the requirements of the Reliability Assurance Agreement Among Load Serving Entities in the PJM Region.
Cost Responsibility Interconnection Customer shall be responsible for and shall pay upon demand all Costs associated with the interconnection of the Customer Facility as specified in the Tariff. These Costs may include, but are not limited to, an Attachment Facilities charge, a Local Upgrades charge, a Network Upgrades charge and other charges. A description of the facilities required and an estimate of the Costs of these facilities are included in Sections 3.0 and 4.0 of the Specifications to this ISA.
Management Responsibility No Limited Partner, as such, shall take part in the management of the business or transact any business for the Partnership.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Joint Responsibility If the Seller determines that the Interface Problem is attributable partially to the design of a Warranted Part and partially to the design of any Supplier Part, the Seller will, if so requested by the Buyer, seek a solution to the Interface Problem through cooperative efforts of the Seller and any Supplier involved. The Seller will promptly advise the Buyer of such corrective action as may be proposed by the Seller and any such Supplier. Such proposal will be consistent with any then existing obligations of the Seller hereunder and of any such Supplier towards the Buyer. Such corrective action, unless reasonably rejected by the Buyer, will constitute full satisfaction of any claim the Buyer may have against either the Seller or any such Supplier with respect to such Interface Problem.
Business Development Company Buyer is a business development company as defined in Section 202(a)(22) of the Investment Advisors Act of 1940.
Client Responsibility For clarity, the parties agree that in reviewing the documents referred to in clause (b) above, Patheon’s role will be limited to verifying the accuracy of the description of the work undertaken or to be undertaken by Patheon. Subject to the foregoing, Patheon will not assume any responsibility for the accuracy of any application for receipt of an approval by a Regulatory Authority. The Client is solely responsible for the preparation and filing of the application for approval by the Regulatory Authority and any relevant costs will be borne by the Client.
Areas of Responsibility The lateral and vertical limits of the respective areas of responsibility are as follows:
Engineers Responsibility The Engineer shall be responsible for the accuracy of its work and shall promptly make necessary revisions or corrections resulting from its errors, omissions, or negligent acts without compensation. The Engineer will not be relieved of the responsibility for subsequent correction of any such errors or omissions or for clarification of any ambiguities until after the construction phase of the project has been completed.
Status as Business Development Company The Borrower is an “investment company” that has elected to be regulated as a “business development company” within the meaning of the Investment Company Act and qualifies as a RIC.